DAILY DIARY
Temporary 128 00 -
Rings
Permanent Rings
Type A 10482 1861 08 17.77
1. Demoulding of segments – PR1851 ,PR1852, PR1853, PR1854, PR1855, PR1856, PR1857, PR1858.
2. Inspection of rebar cages – PR1861/M06, PR1862/M09, PR1863/M17, PR1864/M08, PR1865/M18,
PR1866/M14, PR1867/M07, PR1868/M16.
4. Steam Curing – PR1857, PR1858, PR1855, PR1859, PR1860, PR1861, PR1862, PR1863, PR1864.
5. Segment cage fabrication work in progress (Type A, B & C).
6. Post pour inspection – PR1847, PR1846, PR1849, PR1844, PR1850, PR1837, PR1845, PR1848, PR1851,
PR1852.
7. Segments shifting to Bay 2 – PR1841, PR1843, PR1824, PR1840, PR1844, PR1846, PR1836, PR1845, PR1837.
8. Trial ring assembly – Second layer ring assembling in progress.
9. Site establishment work – Bay 4 Gantry rail foundation (Excavation work in progress).
10. Site establishment work – Bay 3 Construction of Drain in progress.
1. Non availability of comcaster materials & Concrete disturbance frame for further continue the works.
2. Delay in implementing RFID & barcode systems for Tunnel rings.
3. Double tyier stacking no work carried out .
Sr. No. SOR Issued? Description of SOR NCR Issued? Description of NCR
-
1 No No -
Quality Issues
1. Poor stacking of Cut & bend rebars inside the casting shed & in temporary fabrication shed area.
2. RFI-ID & Barcode placed on the mould but not integrated with apps system.
3. Improper microfinishing activities.
1 No - No -
Sr.No. Description
1.Vechile No :NL01L4444
TPI: safety Link (Due date: 02.11.2022 )
2.Vechile No :TN26BN6512
TPI :Circle Safetys (Due date: 24.04.2023 )
Description
Manpower Report
1 L&T Staffs 20
3 Unskilled worker 21
Total Manpower 98
General Consultants
For Chennai Metro Rail Project,
Phase - II
Segment rejected