FAN PROBLEM QUESTIONNAIRE

A. BASIC FAN DATA/INFORMATION

SERVICE: I.D. F.D. P.A. Cae Reelrc. Other (Soeclfy) Wet Dry

TYPE: Centrifugal - Axial -


Bladas ~ Straight Blade# - let
- Back Curved - 2nd Stae^^^^^^
- Forward Curved - No. of Staxon
• Airfoil Blade Material
- Radial T1d Hub Material
- Other (Snecify) Hub Dlaneter (Ft.-In.2^_^_^^^_
Blade Material (Specify) O.D. Over Blade Tina (Ft.-In.)
Wheel Dlaeetar (Ft.-In.)

FAN SIZE/MODEL: PAN MANUFACTURER:

CAPACITY (CFM)r FAN SPEED (RPM): HEAD (IN. H-,0) TEST BLOCK:

ORIGINAL DATE IN SERVICE: DATE FAN PROBLEM OCCURRED:

DESCRIPTION OF PROBLEM AND/OR FAILURE:

COMPANY SUBMITTING REPORT: ____________________________________________________________________________

STATION NAME: _____________________________________________________ ONIT NUMBER: ______

PERSON TO CONTACT CONCERNING REPORT: ________________________________ __________________________________

TITLE: _____________________________________________________ PHONE NUMBER: ( )-______________Ext. <

DATE REPORT SUBMITTED: ___________________________________

B. SUPPORTIVE FAN DESICN/CONFIGURATION INFORMATION

FAN ARRANGEMENT: FtraXlai_____________ S«rlM_____________ NO. FANS OF THIS TYPE ON UNIT:

FAN LOCATION IN CYCLE I.D. tan b«tv««a prxciplcacor & icrubbar):

FAN INLET TEMP. (°F): FAN INLET PRESS. (IN. H20): _________ HEAD (IN. H2O): Rated ___ Static

DESIGN SAFETY FACTOR: ___________________ SHAFT SITE (IN.): At Hub___________________ At Bi?. Journal_________

DESIGN VIBRATION DATA: _________________________ SHAFT LENGTH (TT.-IN.): Batwoon Contarlina of Brc». ____________

DYNAMIC STABILITY (lac critical apaod of rotating alcoant as X of nomal nax. operating apeed):

FACTOR? PERFORMANCE TEST PERFORMED ON: Model___________________________ Pull Slxe Pan

FINITE STRESS ANALYSTS TEST PERfpRMED DURING DESIGN STAGE: Yea ____ Bo ____

WELDING PROCESS USED IN FAN CONSTRUCTION: ____________________________________________________________________________

FAN DRIVER: Type _______ Speed (RPM) ___________ BHP _____ Kanufacturar

FAN COUPLING: Igpe ________ Slxe______________ Manufacturer

FAN TURNING GEAR: Yea_________ No_________ If paa, type_____________________________

FAN BEARINGS: Typo Slxa Manufacturer

LUBE SYSTEMS: Type -______________________________ Oll/Lubrlcant Type -__________


- Separate Oil Cooling System Type - ___
- Shaft Driven
- Both

CONTROL: Auto Manual


Inlet Vena Danoer Variable Sneed Blade Pitch
- Fluid Drive
- Two Soeed
- Other

VEARPIATES - LINERS: Typ* BOILER FUEL: Tvne


Materiel Aeh Content (Z)
Bolted Moisture (Z)
Welded Sulphur (Z)

A-l
FOUNDATION: Typ«/Dc9crlptlon

FAN ISOLATION: Upstream Downstream ______

Type - ■ Type_____________

NOISE ATTENUATION (lolet aileneece, etc.):

C. SUPPORTIVE FAN OPERATION/NAliffENANCE INFORMATION

FAN SERVICE HR. PRIOR TO PROBLEM; ___________________________

BRIEF SUMMARY OF FAN OPERATING HISTORY (major probleWevents only):

RESULTANT EQUIPMENT/UNIT OUTAGE: ___________________________ HR. CURTAILED/OUT OF SERVICE:

SEQUENCE OF EVENTS: ___ ___________________________________________________________________ ___

CAUSE (CTOWN/PROBABLE) OF PROBLB1/FAILURE:


Design DefeeC __________________________ Construction Error _
Operating Error Inetrument/Control Failure
Maintenance Error ____________________ Other ______________

PARTS/MATERIALS REQUIRED: ___________________________

SHORT/LONG TERN CORRECTIVE ACTION TAKEN:

MAINTENANCE ROUTINES:

FAN CONSTRUCTION FEATURE INVOLVES, AS SHRCNK-ON HUBS, RIVETED CONNECTIONS, RADII ON SHAFT, VELDINC:

INSTRUMENTATION:

OTHER INFLUENCES - PRECIPITATOR, CONMECTTNL DUCTWORK, ETC:

SYSTEM INTEGRATION PROBLEMS, SUCH AS LIGHT LOAD OR OVERLOAD, TRANSIENTS, ETC:

*aea»»a»aeaee»aeaeeaaesaa*eeaaaea»aeaaea»e»aaaa»eeeeeaeaaeaa**a**e*«»»**»**e»a*sse»ae*as*aaaaaaaaa»aaaaaaa>aaaae<Hiaaaa*eaaae»
aeeee#e»a»»e*ee»aae»a»sae»»»eea»eaa>aa»aa*»*e»eee»*»eaaaaaeaee*aaaaeeea»ae»*a»*se*eee»aseaaeaeaa*eaa aaaa»aeaeaaeesaa»*a<HKM>ee

INSTRUCTIONS

1) Answer all Ruasdons la Part "A" and only those la Pares MB" and "C” that night assist la the problem definition end/or
solution.

2) Should aaple specs not be provided to properly answer a specific question, additional blank sheets asy be used end
attached to this form. Other pertinent Information (drawings, curves, etc.) nay also be attached If required.

3) Return completed questionnaires to EEl Prime Hovers Committee, Boiler Subcommittee, 1140 Connecticut Avenue. N.V.,
Washington, D.C. 2003b.

A-2

You might also like