No.: PMCS/EDFC2/LTT/2023/00045 Date: 05.01.

2023
To: Consortium of Siemens Ltd and KEC International Ltd
Birla Aurora, Level 21, Plot No. 1080,
Dr. Annie Besant Road,
Worli, Mumbai-400030, India
Email: Pankaj.rastogi@siemens.com

Kind Attention: Mr. Pankaj Rastogi (Authorized Representative)

Subject : Balance Works of Design, Supply, Construction, Testing and Commissioning of


Signalling, Telecommunication and Associated Works of Double Track Railway Lines
Under Construction on a Design Build Lump Sum Basis for Deen Dayal Upadhyay –
New Bhaupur Section of Eastern Dedicated Freight Corridor (Contract Package-203R);
Reg. PMC Notice (Notice of No Objection) with comments on ALH-231 Circuit Book -
Outdoor (New Manauri- New Sujatpur Block Section) DWG No. 1/SG/0778, Rev. B.

Ref.  : 1. Contract Agreement No. HQ/S&T/EC/D-B/DDU-BPUN dt: 19.01.2021.


2. Consortium of Siemens-KEC letter no. DFCCIL
203R/PMC/Siemens-KEC/4312/10092022 dt: 10.09.2022.
3. PMC letter no. PMCS/EDFC2/LTT/2022/08524 Dt: 13.10.2022.
4. Consortium of Siemens-KEC letter no. DFCCIL
203R/PMC/Siemens-KEC/4950/26122022 Dt: 26.12.2022

CC : 1. CGM/ West, DFCCIL, Prayagraj.


2. CGM/ East, DFCCIL, Prayagraj.
Dear Sir,
PMC has reviewed the ALH-231 Circuit Book – Outdoor (New Manauri- New Sujatpur Block
Section) Rev. B. submitted by Consortium of Siemens-KEC vide letter under ref. 4 above and
communicates Notice (Notice of No Objection) with comments as per GS para 10.0 (1) (Page
146 of CA) and GS Para 14.0 (4) (Page 148 of CA) with following comments:

A. Technical Comments:
1. Scanned Signature is not acceptable in the design.
2. CTR1 should be corrected as CTR.
3. MTP should be provided at J.B-2 & J.B-6 in outdoor design and CCP should also be
accordingly updated.

B. Technical Comments Sheet Wise: -


1. Sheet No. 001: Description should be reviewed and updated.
2. Sheet No. 001-002: Revision history should be reviewed and updated.
3. Sheet No. 007: Key Plan should be readable.
4. Sheet No. 008: F22 cable detail should be corrected.

JV SITE OFFICE •SYSTRA – Mott MacDonald (JV) •


3rd& 4th Floor • Mahalaxmi Tower • 9TB Sapru Marg • Civil Lines • Prayagraj • Uttar Pradesh - 211001| Tel +915322261153
JV HEADQUARTERS • SYSTRA MVA Consulting India Pvt. Ltd. •
Vatika Mindscapes • Tower-B, 12/3, Mathura Road, NH-2, Sector-27/D • Faridabad, Haryana-121013 • India | Tel +91-129-6685841
5. Sheet No. 018: Refer sheet no for L.B-2 should be corrected.
6. Sheet No. 059: Cable detail from L.B-1 should be updated.
7. Sheet No. 060: Cable detail from L.B-2 should be updated.
8. Sheet no. 070-071: Sheet nos for function should be updated.
9. Sheet No. 086: Relay positions should be updated.

C. General Comments:
1. ‘Drawing and CAD standard’ has been mentioned under GS Appendix-7, (page nos. 228 –
229 of CA); the same should be followed in the Design.
Further,
1) This is to mention that in reference to FIDIC General Condition’s sub-clause 3.1(c), 4.11 and
5.8, approval or consent of the Engineer shall not relieve the contractor from any
obligation or responsibility under the contract. If any errors, omissions, discrepancies are
found later in the referred document (drawing and design) the contractor has to carry out
the modification on his own cost.
2) The Contractor shall be responsible for and shall bear and pay the costs for any alteration
of works arising from any discrepancies, errors or omissions in the design and drawing
supplied by him, whether such designs and drawings have been approved by the Engineer
or not (PSSW Para 1.5.2 / PSTW Para 1.6.2 of CA).

Hence, Consortium of Siemens-KEC is required to update and submit 4 copies of the design
“Circuit Book (Outdoor Drawing – 1/SG/0778) Interface Circuit: ALH – 231” along with para-wise
compliance of, but not limited to, the above comments.

Best Regards,

Kamal Sharma
Team Leader,
Authorised Signatory for SYSTRA-Mott MacDonald (JV)
ksharma1@systra.com
Prayagraj (U.P.)

JV SITE OFFICE •SYSTRA – Mott MacDonald (JV) •


3rd& 4th Floor • Mahalaxmi Tower • 9TB Sapru Marg • Civil Lines • Prayagraj • Uttar Pradesh - 211001| Tel +915322261153
JV HEADQUARTERS • SYSTRA MVA Consulting India Pvt. Ltd. •
Vatika Mindscapes • Tower-B, 12/3, Mathura Road, NH-2, Sector-27/D • Faridabad, Haryana-121013 • India | Tel +91-129-6685841
Prepared By Reviewed By Approved By

Ashish Srivastava Arun Kumar Kamal Sharma


Sr. Signal Design Engineer Dy. Team Leader CP-203 Team Leader

JV SITE OFFICE •SYSTRA – Mott MacDonald (JV) •


3rd& 4th Floor • Mahalaxmi Tower • 9TB Sapru Marg • Civil Lines • Prayagraj • Uttar Pradesh - 211001| Tel +915322261153
JV HEADQUARTERS • SYSTRA MVA Consulting India Pvt. Ltd. •
Vatika Mindscapes • Tower-B, 12/3, Mathura Road, NH-2, Sector-27/D • Faridabad, Haryana-121013 • India | Tel +91-129-6685841
JV SITE OFFICE •SYSTRA – Mott MacDonald (JV) •
3rd& 4th Floor • Mahalaxmi Tower • 9TB Sapru Marg • Civil Lines • Prayagraj • Uttar Pradesh - 211001| Tel +915322261153
JV HEADQUARTERS • SYSTRA MVA Consulting India Pvt. Ltd. •
Vatika Mindscapes • Tower-B, 12/3, Mathura Road, NH-2, Sector-27/D • Faridabad, Haryana-121013 • India | Tel +91-129-6685841

You might also like