CONTROL ROOM NETWORK CABINET(NW01)

CONTROL ROOM CONSOLE AREA Ethernet switches are


configured properly??

PRI. ETHERNET SWITCH (ES11A)


192.168.140.202
192.168.140.1 MEDIA CONVERTER (MC 11A)

PATCH PANEL (PP011D)


IED SEC. ETHERNET SWITCH (ES11B)
SERVER 192.168.140.2
MEDIA CONVERTER (MC 11B)

SUBSTATION 4 NETWORK CABINET(NW05)

192.168.171.251
PRI. ROUTER (FR15A)
TO IED's (ABB RELAYs REF615,

MEDIA CONVERTER (MC 15A)


Cable is not connected at site.
PATCH PANEL (PP015)
SEC. ROUTER (FR15B)
REg615, REM615 etc

192.168.171.101
to
Cable is not connected at site.
192.168.171.120
MEDIA CONVERTER (MC 15B)
192.168.171.252
ELC's

SCOPE OF ABB