Maintenance of Concrete Sleeper Track

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

daØhV Lyhij jsyiFk dk vuqj{k.

k (h) Overhauling of level crossing should tampers are not available, as an


be done along with tamping. Check interim measure, the tamping may
Maintenance of Concrete Sleeper Track rails should be removed just before be done with the help of crow bar
tamping. duly taking care that the concrete
All concrete sleeper tracks are required to sleepers are not damaged.
be maintained by heavy duty on track A.2 VsfEiax ds nkSjku izfØ;k @ During -
tampers. In accordance with the Rly. Bd.’s tamping Operations
L. No. 2007/Track III/TK/7/Pt., dt. 16.01.08,
the tamping guidelines for through a) Recording of pre and post tamping
attention and spot attention of a section track geometry parameters and
should be followed. taking suitable corrective action
wherever necessary.
A VsfEiax izfØ;k@ Tamping Operations b) Providing a ramp of 1 in 1000 before
closing the block work and at
The important items of attention for obligatory point such as girder
machine tamping are as under; bridges, turn- out etc. C ih vkj lh jsyiFk dk okf’kZd O;ofLFkr
A.3 VsfEiax i”pkr~ izfØ;k @ Post-
j[kj[kko@ Annual Systematic
A.1 iwoZ&VsfEiax izfØ;k @ Pre-tamping tamping Operations Attention on PRC Track
Operations C.1 In addition to machine tamping,
a) Fittings that might have become the gangs will carry out annual
(a) Shallow screening of pumping joints. loose or become displaced should systematic attention to track from
(b) Recoupment of Ballast. be reset and those broken/ one end of gang beat to the other
(c) Replacement of unserviceable misplaced should be replenished. during working season. This will
sleepers, missing/broken fittings. b) Ballast should be recouped in include-
(d) Squaring of sleepers, Gauging and tamping zone and should be (a) jsy] Lyhij] ca/kuksa ,oa bZ vkj lh ds Vks yksM
Gap adjustment. properly dressed. ekiu dk ijh{k.k@ Examination of
(e) Clearing of ballast from top of the c) In areas where DTS has not been Rails, Sleepers and Fastenings
sleepers to make them visible to the used, hand ramming of shoulder including measurement of toe load
operator of machine. /crib ballast should be done. of ERCs.
(f) Marking of super elevation and design d) All the fixtures removed during pre- i) jsy ,oa osYM@Rails and welds should
slew on curves, lift and slews on tamping/ tamping should be be examined for the following
straight. Those fixtures/ installations restored. defects and action shall be taken as
which cannot be removed should also indicated below:
A.4 During working of machines, • Corrosion on web, foot and at
be marked to be clearly visible to provisions contained in LWR
machine operator. underside of rails & welds- To be
manual shall be strictly followed. cleaned and painted two coats of 100
(g) Removal of obstructions like single micron thick (each layer) with anti-
rods, cable, pipes, OHE bonds/ B rRdky fuokj.k@[kkfe;kW@ Spot corrosive bituminous black paint IS 9862
jumpers, guard rails at the approach with a interval of 8 hours.
Attention/ Slack Picking • Cracks on rails and welds- Cracked
of bridges, joggled fishplates, wooden
blocks etc. (Guard rails, Joggled For spot attention/ slack picking, rails or welds shall be replaced.
fishplates at ‘D’ joints should be multipurpose tampers and of track • Wear on rail profile- If necessary, rails
removed just before tamping). to be interchanged and burrs, if any shall
tampers shall be used. Where these be removed.
• Wheel burns and scabs on the rail to hold the rails. Crushed rubber pads, The loss of toe load is reflective of
table top- If required, rails shall be broken/missing liners and ERCs shall be condition of other elastic fastening
replaced. replaced. components like Grooved rubber pads,
GFN/Metal liners etc. The condition of
• Kinks and bends in rail and weld- Correct diving of ERCs should be ensured these components along with measuring
Cutting and re-welding shall be such that leg of the clip is flushed with end of toe loads of ERCs shall be checked to
done. face of the Insert. ERCs and metal liners ascertain cause of loss of toe load.
should be checked for corrosion and
• Cupped welds- Shall be filled up or corroded ones should be changed. v) bZ vkj lh dk Lusgu@ Lubrication of
cut and re-welded. ERCs
In all operations, where ERCs are required It should normally be carried out by Key
• High and low welded joint- Shall to be removed and re-inserted, it may be man in a systematic manner from one to
be rectified by filing/ filling up or advisable to clean and grease Insert and other at the rate of 20 sleepers per day.
by cutting and re-welding. ERC and clean liner rail foot contact area This will give a frequency of about 1-1/2
before insertion. The ERCs should be years.
ii) ih ,l lh Lyhij]@ PSC sleepers removed and put back by using clip
applicator and not be hammering. In case greasing is required more
Sleepers shall be examined for their frequently, gangs may be deputed for
condition and wear in rail seat. Any crack iv) bZ vkj lh dk Vks yksM ekiu@ Toe Load this work. This work should not be done
in concrete sleeper and damage to Measurement of ERCs in extreme summer and heavy rainfall.
concrete exposing reinforcement should Greasing of ERCs should be done with
be looked for. The damaged sleeper shall Sample check of toe loads periodically
during service shall be made by toe load graphite grease to IS 408-1981 Gr. ’O’
be replaced. specification.
measuring kit approval by RDSO. Toe load
of elastic rail clip should be measured on At any time, Key man should not remove
one percent of ERCs randomly on every more than one ERC of a sleeper. The eye
100 sleepers. (All 4 ERCs to be measured on of the insert shall be cleaned by suitable
one sleeper.) brush. Two ERC, one from inside of one
Initial testing shall be done once in four sleeper and one from outside of
years or passage of 200 GMT traffic, adjacent sleeper on same rail shall be
whichever is earlier. Frequency shall be removed and cleaned by wire brush and
doubled in corrosion prone areas. emery paper. After cleaning, grease
graphite shall be applied to the inside
The end of HTS wire shall be painted Subsequent testing will be done every four surface of Inserts and leg of ERCs. Both
with anti-corrosive bituminous emulsion years or 200 GMT in normal areas and two ERCs shall be interchanged and fixed
paint conforming to IRS-P-30-96, if there years or 100 GMT in corrosion prone areas, again. After fixing these two ERCs
is any sign of scaling away of paint or whichever is earlier. However, if 20% or remaining two ERCs shall be tackled as
corrosion. more of sample size record toe load below above. The process is repeated for
600 kg both frequency of inspection and cleaning and lubricating remaining ERCs.
iii) ca/ku@ Fastenings sample size are to be doubled. If 20% or (b) baL;wysVsM tksM] ,l bZ ts vkfn dk fujh{k.k
more of sample size record toe load below ,oa j[kj[kko@ Inspection of and
Rubber pads, Liners and ERCs shall be 400 kg which is to be confirmed by 5% attention to insulated joints,
examined to ensure that these are in sample size, proposal of through fastening switch expansion joints etc.
good condition and appropriately fixed renewal shall be initiated.
(c) iqy] leikj igqWp] ,y MCY;w vkj dh C.2 e”khu vuqjf{kr daØhV Lyhij jsyiFk dk okf’kZd
vuqj{k.k dk;ZØe fuEuor~ gksxk@ Annual vof/k@ dk;Z@ Work
“olu yEckbZ ,oa [kjkc QkesZ”ku dh
isfdax@ Packing of approaches of programme for machine maintained Period
bridges, level crossings, breathing concrete sleeper track would be as • Shallow screening of specified
lengths of LWRs and bad lengths.
formation areas etc. follows:
• Hot weather patrolling.
(d) jsyiFk dh mFkyh NukbZ@ Shallow vof/k@ dk;Z@ Work
screening of track. Period
(e) lsl ,oa rVca/k dh vYi ejEer@ Minor Attention (a) Picking of slacks as required.
Post- Immediately after end of
repair to cess and bank. during (b) Normal track maintenance of
monsoon monsoon, attend to run down
(f) fxêh dh HkjkbZ ,oa Mªsflax@ Boxing and monsoon yard lines.
attention. stretches in the entire gang
dressing of ballast. (For three- (c) Cleaning, removal of loose
(For six- length. Thereafter, the
four boulders from cuttings &
seven following schedule of work shall
months) tunnels to ensure free flow of
months be followed:
water.
after end (i) Picking of slacks 1-2 days in a
(d) Monsoon patrolling.
of week.
(e) Maintenance of side and
(ii) Remaining days shall be
monsoon) catch water drains.
allotted to-
(f) Repair to cess and bank.
• Annual systematic attention.
• Overhauling of level crossings.
• De-stressing of LWRs.
(g) {kfrxzLr@xk;c jcM+ isM] ykbuj vkSj bZ • Spot renewals of rails, Disclaimer
vkj lh dk izfrLFkkiu@ Replacement
of damage /missing rubber pads, sleepers etc. The information contained in this pamphlet does
liners and ERCs. • De-weeding. not supercede any existing provisions laid down in
• Cold weather patrolling etc. RDSO & Railway Board instructions. This
(i) Picking of slacks 1-2 days in a document is not statutory & instructions given in
Pre-
it are for the purpose of guidance only.
monsoon week.
attention. (ii) Remaining days shall be
Our Objective
(For two allotted to :
To upgrade Maintenance Technologies and
months • Cleaning & repairs to side & Methodologies & achieve improvement in productivity
catch water drains & cleaning and performance of all Railway assets and manpower
prior to which inter-alia would cover Reliability, Availability
onset of of water ways. and Utilisation.
• Attention to yard drainage.
monsoon) The contents of this pamphlet are for guidance only and are
• Spot renewals of rails, not statutory. If you have any suggestion & comments on
contents of the pamphlet, please write to: Dy.Director (Civil),
sleepers etc. CAMTECH, Maharajpur, Gwalior (M.P) – 474 005
dso y dk;Zky;hu mi;ksx gsrq
(For Official use only)

Hkkjr ljdkj & GOVERNMENT OF INDIA


jsy ea=ky; & MINISTRY OF RAILWAYS

daØhV Lyhij jsyiFk dk vuqj{k.k


Maintenance of Concrete
Sleeper Track

dseVsd@fl@2011@,e&lh ,l Vh@1-0
CAMTECH/C/2011/M-CST/1.0
uoEcj @November - 2011

Maharajpur, Gwalior - 474005

gekjk mís’;
vuqj {k.k iz©|©fxdh vkSj dk;Ziz.kkyh dks mUu;u djuk rFkk
mRikndrk vkSj jsYos dh ifjlEifRr ,oa tu’kfDr ds fu"iknu esa
lq/kkj djuk ftlls vUrfoZ"k;ksa esa fo’oluh;rk] mi;ksfxrk vkSj
n{krk izkIr dh tk ldsA
lEidZ lw=
 : 0751-2470869, Fax: 0751- 2470841
E-Mail : dircivilcamtech@gmail.com

You might also like