LOCATION NO.

Comment/Description Signature Status


Welded elbows to be replaced by
Fire Protection System General Comments 64 Defects treatments etc.
union.
General Points
Workshop 46 Finishing of bathroom Doors
/Other Buildings
Some AC’s in switchyard relay
HVAC in CB General Comments 25 Defects treatments etc.
building are out of order.
Elevator car flooring tiles to be
PH-Elevator 102 floor tiles
carried out.
car cabinet floor tile need to be
CB-Elevator 51 Floor marking
install
Provide the name plates of all only material to be
Fire Detection System General Comments 27 Name plates, taggings
signals processing units (SPU) providing
Lunbrication points shall be clearly
only material to be
HVAC in CB General Comments 8 marked as per contract clause Name plates, taggings
17.2.6.1
providing
Lunbrication points shall be clearly
only material to be
HVAC in PH General Comments 9 marked as per contract clause Name plates, taggings
17.2.6.1
providing
only material to be
HVAC in PH General Comments 28 All terminal block tagging is required. Name plates, taggings
providing
Tagging of pressure points/filling only material to be
HVAC in PH Chillers 55 Name plates, taggings
points is required. providing
VSB-1~3 and 6 ~8 (El Terminal block number is required for only material to be
HVAC in PH 174 Name plates, taggings
347.0m) all panels. providing
A Desk to be provided in Control
Handing
roomn for Central Fire Alarm only material to be
Fire Detection System General Comments 23 over/Replacement of
Computer System as per contract providing
clause 17.4.7. equipment etc.
Spare parts to be handed over to
Fire Detection System General Comments 36 Spare parts
Employer.
Installed sprinkels in cable gallery at
EL334 and EL329 are 66 and 35
respectively, while as per approved
drawing there are 37 sprinkels for
Fire Protection System General Comments 80 Others
cable gallery at EL 329 and 84
sprinkles are for the cable gallery at
EL 334. Provide remaining sprinkles only material to be
as spare. providing
Handing
Provide the missing nossels of
Fire Protection System Power House EL.347.00 100 over/Replacement of only material to be
Transformer oil room sprinkles.
equipment etc. providing
The missing noggles(two NO.) in
Fire Protection System Control Building 104 transform oil room at EL347 to be Done-Signed by T4CJV only material to be
provided providing
Spare parts to be handed over as per
Potable water system 21 Spare parts
Approved List of spares.
Spare parts to be handed over as per
sewage water system 19 Spare parts
Approved List of spares.
General Points Provision of spare parts as per
Fire Fighting/Alarm 6 Spare parts
/Other Buildings Contract. (WAPDA)
General Points Provision of spare parts as per
Sewage 13 Spare parts
/Other Buildings Contract. (WAPDA)
General Points Provision of spare parts as per
Lighting/Small Power 16 Spare parts
/Other Buildings Contract. (WAPDA)
Installation of two numbers of doors
only locks to be
LLO LLO Control Room 81 in LLO Control Room to be Doors
completed.
providing
Access to each and every guage,
Additional ladders, only material to be
HVAC in CB General Comments 28 sensor provided (platform/ladder) in
AHU room for maintenance.
electric water coolers providing
Access to each and every guages,
sensor to be provided
Additional ladders, only material to be
HVAC in PH General Comments 14 (platform/ladder) in AHU room for
maintenance as per contract clause
electric water coolers providing
17.2.6.1.
Cable clamps to be installed on all only material to be
HVAC in PH General Comments 22 Cable etc.
vertical cable trays. providing