P&ID Checklist
P&ID Checklist
Normal Operation
Turndown Operation
Control Loops
DCS / ESD Interfaces
Manual / Auto & Local / Control Room Operation
Motor Control & Indication Requirements
3.0 SAFETY
Relief Valve Location / Set Pressure / Size & Sizing Case shown
Relief Valve Inlet / Outlet Line Sizes & Valve Interlocks
ESDV Location / Failure Mode
Blowdown Facilities : Location / Inlet/Outlet Line Sizes
Low Temperature Considerations / Thermal Sleeves
Process Trips : Location / Requirement
LO / LC Requirements for isolation Valves
API 14C Requirements / safeguarding
Hazop Comments
Hydrate Inhibition Requirements
Insulation Requirements (PP, Winterisation, Acoustic)
Layout Requirements (Elevations, Line Slopes etc.)
Liquid Containment / Bunding Requirements
Syphoning / Vacuum Break Requirments
Filters & Strainers
Certification Comments
Line slope/ low point/ no pockets requirements clearly shown
4.0 START-UP / SHUTDOWN & MAINTENANCE
6.0 INSTRUMENTATION
Injection Points for : Demulsfires , Scale, Deoiler, Corrosion inhibitor, Antifoam etc.
Sample Points
Monitoring (Coupons, Probes)
9.0 CONSISTENCY
### TIE-INS
Destruct lines correctly clouded
Construct lines correctly clouded
Destruct & Construct tie-in points are consistent.
Identify & Source all re used instruments.
Identify & Source all re used valves.
Tie in points/ type shown clearly and accurately (construct and demolition)
643926754.xls 02/09/2023 Page 2 of 4
### SHUT-DOWN SEQUENCE
Identify shut down sequense against P&ID