Monitoring report is
attached.
The installation of the According to the MPCB
Sewage Treatment Plant norms a sewage treatment
xxvii) (STP) should be certified by plant is provided to treat the
an independent expert and a sewage generated during
report in this regard should operational phase. Sewage
be submitted to the MPCB will be treated up to tertiary
and Environment level. The treated sewage
department before the will be reused for gardening,
project is commissioned for flushing and HVAC make-up
operation. Discharge of this purpose. The project is a
unused treated affluent, if Zero discharge project.
any should be discharge in
the sewer line. Treated
effluent emanating from STP
shall be recycled/refused to
the maximum extent
possible. Discharge of this
unused treated affluent, if
any should be discharge in
the sewer line. Treatment of
100% gray water by
decentralized treatment
should be done. Necessary
measures should be made to
mitigate the odour problem
from STP.
Permission to draw ground We are not using ground
water and construction of water for construction
xxviii) basement if any shall be purpose.
obtained from the competent
Authority prior to
construction/operation of
the project.
Separation of gray and black We have provided the dual
water should be done by the plumbing line for separation
xxix) use of dual plumbing line for of gray and black water.
separation of gray and black
water.
Fixtures for showers, toilet A water efficient sanitary
xxx) flushing and drinking should feature includes showers,
be of low flow either by use low flush, dual cisterns are
of aerators or pressure provided in completed
reducing devices or sensor buildings.
based control.
Use of glass may be reduced The use of glass is less than
xxxi) up to 40% to reduce the 40%
electricity consumption and
load on air conditioning. If
necessary, use high quality
double glass with special
reflective coating in
windows.
Roof should meet Roof is as per the
xxxii) prescriptive requirement as prescriptive requirement
per Energy Conservation specified in Energy
Building Code by using Conservation Building Code.
appropriate thermal
insulation material to fulfill
requirement.
Energy conservation High COP chillers, LED
xxxiii) measures like installation of lighting, solar lighting,
CFLs /TFLs for the lighting energy efficient Lift
the areas outside the building proposed.
should be integral part of the
project design and should be
in place before project
commissioning. Use CFLs and
TFLs should be properly
collected and disposed
off/sent for recycling as per
the prevailing
guidelines/rules of the
regulatory authority to avoid
mercury contamination. Use
of solar panels may be done
to the extent possible like
installing solar street lights,
common solar water heaters
system. Project proponent
should install, after checking
feasibility, solar plus hybrid
non-conventional energy
source as source of energy.
Diesel power generating sets We have complied and made
proposed as source of backup necessary arrangements.
power for elevators and
common area illumination The DG sets are provided as
xxxiv)
during operation phase emergency back for lift,
should be of enclosed type common area, pumps etc.
and conform to rules made during operational phase.
under the
Environment (Protection)
Act, 1986. The height of stack
of DG sets should be equal to
the height needed for the
combined capacity of all
proposed DG sets. Use low
sulphur diesel. The location
of the DG sets may be
decided with in consultation
with Maharashtra Pollution
Control Board.
Noise should be controlled to The noise levels are
xxxv) ensure that it does not monitored from MoEF
exceed the prescribed recognized laboratory.
standards. During nighttime
the noise levels measured at Monitoring report is
the boundary of the building attached.
shall be restricted to the
permissible levels to comply
with the prevalent
regulations.
Traffic congestion near the Entry & exit to the proposed
xxxvi) entry and exit points from project are located in such
the roads adjoining the way that it won’t affect traffic
proposed project site must on the adjoining roads.
be avoided. Parking should
be fully internalized and no Also, sufficient parking is
public space should be provided.
utilized.
Opaque wall should meet Opaque wall is not provided
xxxvii) prescriptive requirement as as it was not considered
per Energy Conservation while designing the project.
Building Code, which is
proposed to be mandatory
for all air-conditioned spaces
while it is aspiration for non-
air-conditioned spaces by use
of appropriate thermal
insulation material to fulfill
requirement.
The building should have The Buildings have adequate
xxxviii) adequate distance between distance between them to
them to allow movement of allow movement of fresh air
fresh air and passage of and passage of natural light,
natural light, air and air and ventilation to the
ventilation. premises.
Regular supervision of the The regular supervision is
xxxix) above and other measures carried out by the project in-
for monitoring should be in charge and supervisors are
place all through the trained in Environmental
construction phase, so as to Management measures.
avoid disturbance to the
surroundings.
Under the provisions of Obtained EC vide letter No.
xl) Environment (Protection) SEAC‐2010/CR‐422/TC.2
Act, 1986, legal action shall dtd. 24.11.2010, vide No.
be initiated against the SEAC‐2010/CR.422/TC.2
project dtd. 29.09.2014 and
proponent if it was found subsequent amendment and
that construction of the Expansion in EC dtd.
project has been started 18.07.2016, 31.05.2018,
without obtaining 25.02.2020 and the recent EC
environmental vide letter No.
clearance. SIA/MH/MIS/62029/2021
dtd. 13.09.2021
Six monthly monitoring We have submitted six
xli) reports should be submitted monthly compliance reports
to the Regional office MoEF, to Environment department
Bhopal with copy to this Mantralaya, MPCB and
department and MPCB. Regional office MoEF.
Project proponent shall We ensure that, STP, MSW
ensure completion of STP, disposal facility and green
MSW disposal facility, green belt development is
belt development prior to providing prior to
xlii)
occupation of the buildings. occupation of the buildings.
As agreed during the SEIAA
meeting, PP to explore
possibility of utilizing excess
treated water in the adjacent
area for gardening before
discharging it into sewer line
No physical occupation
or allotment will be given
unless all above said
environmental infrastructure
is installed and made
functional including water
requirement in Para 2. Prior
certification from
appropriate authority shall
be obtained.
Wet garbage should be Biodegradable waste is
treated by Organic Waste treated in mechanical
xliii) Converter and treated waste composting machine and
(manure) should be utilized prepared manure is utilized
in the existing premises for in the existing premises for
gardening. And, no wet gardening.
garbage will be disposed
outside the premises. Local
authority should ensure this.
Local body should ensure No occupation certification
xliv) that no occupation will issued prior to operation
certification is issued prior to of STP /MSW etc. with due
operation of STP/MSW site
permission of MPCB.
etc. with due permission of
MPCB.
xlv) A complete set of all the We have submitted all the
documents submitted to project details and plans to
Department should be MPCB while applying to
forwarded to the Local consent to establish and
authority and accordingly MPCB has
MPCB. granted the Revalidation in
CtoE for remaining bldgs.
vide Format1.0 /CAC-
CELL/UAN
No.0000120526/CE/220400
0702 dated. 12.04.2022 valid
till 11.04.2027.