Professional Documents
Culture Documents
Heirloom Rice Processing Plan of Gaang (Gatud) and Anggacan9ti0
Heirloom Rice Processing Plan of Gaang (Gatud) and Anggacan9ti0
Heirloom Rice Processing Plan of Gaang (Gatud) and Anggacan9ti0
MALIN-AWA 3
E
POB. SUYANG
LUBUAGAN BALATOC 2
E
V
TANGLAG BALAWAG
1000
MABELONG MABATO TRUSS DETAILS CIVIL/STRUCTURAL
V
I
1000
LOWER
S
O
UPPER DALNACAN
MABONGTOT TALOCTOC SLAB DEPRESSION DETAIL
I
PAGUGO
MANANGOL
H
C2 MATTELED
LICUTAN
C
BAWAC
3 5
U
3125
DALKINSON TANGILIG AWINGAN MABACA SE-ET DUPLIGAN ELECTRICAL GENERAL NOTES
N
GUMBOWOY
10251
6251
MANGALI CENTRO ANGGACAN SUR
LEGEND
AMMABOY 2
BANGAD
CENTRO POBLACION CABUGAO
BAKKUNG LAY-ASAN E LIGHTING LAYOUT PLAN
POWER LAYOUT PLAN
PANGOL 3125
1 LOADS SCHEDULE AND
BABBANOY ROOFDECK COMPUTATIONS
AMBATO UPPER LUBO LOWER LUBO
PANEL DIAGRAM
TINGLAYAN RISER DIAGRAM
R
PROPER TANUDAN
E
3
V
1000
LOCATION MAP
R
GA-ANG
ABBREVIATIONS
P
O
1000
C
BASAO
1 SEWERAGE LAYOUT PLAN
I
H
DACALAN 1
WATERLINE PLUMBING ISOMETRY
C
4
2 PLUMBING- SEWERAGE ISOMETRY
A-2
SEPTIC TANK VOLUME
TO BARLIG, 12000 COMPUTATION
MT.PROVINCE SEPTIC TANK DETAILS
MECHANICAL
P FLOOR CLEAN OUT DETAIL
SEWERAGE BRANCH DETAIL
2 TOILET FIXTURE MOUNTING DETAILS
CATCH BASIN DETAILS
1 LOCATION MAP 4 SITE DEVELOPMENT PLAN AIR CHAMBER DETAILS
900
FIN. ROOFDECK FLOOR LINE, +3200mm
1300 1500 1300
4100
W W W W
5 ramp 1100 1
5 5
3200
1 up
W
2000
900
3
WASH CR DRESS OPERATING AREA
AREA D
3125
ROOM FIN. FLOOR LINE, +200mm
4 W
2
STOCK AREA NATURAL GRADE LINE, 0.00mm
D D
3 3 HALL WAY
W W D
2
6 7 2
3 L E F T- S I D E E L E V A T I O N
1000
MPVS A 2 SCALE 1:80m
3 W
5
A-2 W STORAGE A-2
3125
3 6 W
& 2
ADMINISTRATIVE DISPLAY AREA
OFFICE 1
D A- 3 ALUMINUM
1 SLIDING WINDOW W/ 6mm THK. GLASS S.798
3
D
1 C B A 38mmØ STAINLESS STEEL PIPE HANDRAIL( 1 @
W W 800mm ht., 1@ 600mm ht.)
4 FIN. FLOOR LINE 1
ELEV. +200mm 150mm THK. CHB PLASTERED FINISHED,
ramp FIN. GRADE LINE FIN. PARAPET LINE, +4100mm PAINTED W/ FLAT LATEX
dn ELEV. 0.00mm
900
2
A-2 2 FIN. ROOFDECK FLOOR LINE, +3200mm
A- 3
4100
3200
1 F L O O R P L A N W
2
4 REAR E L E V A T I O N
A 2 SCALE 1:80m
A B C 3 2 1
ALUMINUM
SLIDING WINDOW W/ 6mm THK. GLASS S.798
900
FIN. PARAPET LINE, +4100mm PAINTED W/ FLAT LATEX
FIN. ROOFDECK FLOOR LINE, +3200mm
900
4100
3200
4100
3200
W W
900
1 1
3 2
2 F R O N T ELEVATION 5 RIGHT-SIDE E L E V A T I O N
A 2 SCALE 1:80m A 2 SCALE 1:80m
4100 4000
9000
FIN. ROOFDECK FLOOR LINE, +3200mm
1300 1500 1300 SEE SLAB DETAILS
W W W 800 1100
5 ramp 1100
5 5
4100
1 up
3200
SSPB RG
HDHTT D
HDPP HDPP
2000
WORKSTATIONS WORKSTATIONS
800
WASH CR DRESS OPERATING AREA
900
AREA
3125
ROOM RRD
GMM HSB CRM FIN. FLOOR LINE, +200mm
STOCK AREA
D D NATURAL GRADE LINE, 0.00mm
1000
3 3 HALL WAY
2 HDPP
3 LONGITUDINAL SECTION
1000
MPVS
3 A 3 SCALE 1:80m
A-2 STORAGE
A B C
3125
&
ADMINISTRATIVE DISPLAY AREA
OFFICE HDPP HDPP
ALUMINUM SLIDING
WINDOW W/ 6mm THK. GLASS S.798
3
FIN. FLOOR LINE
ELEV. +200mm
FIN. PARAPET LINE, +4100mm
ramp FIN. GRADE LINE
9000
dn ELEV. 0.00mm
2 FIN. ROOFDECK FLOOR LINE, +3200mm
SEE SLAB DETAILS
A-2
4100
3200
A 2 SCALE 1:80m
ADMIN. OFFICE DISPLAY AREA
900
WORKSTATIONS
FIN. FLOOR LINE, +200mm
A B C
1 TRAVERSE SECTION
4000 4000 A 3 SCALE 1:80m
WF-01
3125
CF-03
FF-03 FF-03
1
FF-03
2 2300
3125
CF-02
FF-03 WF-01
FF-03
3125
FF-01 FF-03
2 CF-02
WF-01
LEGEND 3
3125
WF-01 WF-01 LEGEND CF-02 CF-02
1200
1200
FF-02 300mmX300mm UNGLAZED CERAMIC 4.5mm THK. FICEM BOARD CEILING CF-03
TILES CF-02
2 FLOOR PATTERN LAYOUT ON METAL FURRING ON FLAT LATEX
PAINT FINISH (VERIFY HEIGHT)
FF-03 ROUGH CEMENT PLASTER FINISH
A 3 SCALE 1:80m CF-03 4.5mm THK. FICEM BOARD
CEILING, PAINT FINISH
4 REFLECTED CEILING PLAN
A 3 SCALE 1:80m
PEOPLES ORGANIZATION BENEFICIARY: SET SHEET
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: PROJECT TITLE / LOCATION: SHEET AND CONTENTS:
NO: NO:
D D D D
1 2 3 4 300mmX300mm
UNGLAZED
CERAMIC TILES
900 800 600
2700
2000
2100
2100
2000
Y
1 DOORS SCHEDULE
A 4 SCALE 1:50m
4.5mm THK. FIBEM BOARD
CEILING ON METAL FURRING
ON FLAT LATEX PAINT FINISH
2800 1920 (2.75m HEIGHT)
2700
725 675 675 725 1350 1350
960 960 PLASTERED CHB WALL,
FINISHED PAINT
WALL HUNG
1200
1200
1200
3050
LAVATORY
900
900
900
FINISHED FLOOR LINE
1100
DESCRIPTION ALLUMINUM SLIDING WINDOW DESCRIPTION ALLUMINUM 1FRAMED SLIDING DESCRIPTION ALLUMINUM FRAMED SLIDING
800
750
WINDOW W/ 4" THK. GLASS WINDOW W/ 14" THK. GLASS
W/ 41" THK. GLASS S. 798 S. 798 S.798
AREA 3.36 sq.m AREA 6.48 sq.m AREA 2.3 sq.m
4.5mm THK. FIBEM BOARD
QUANTITY 1 QUANTITY 2 QUANTITY 1
CEILING ON METAL FURRING
LOCATION WORKSTATIONS LOCATION WORKSTATIONS LOCATION WORKSTATIONS, ADMIN OFFICE ON FLAT LATEX PAINT
S E C T I O N T H R U "X" FINISH (2.75m HEIGHT)
W W
6 7 SIPHON VORTEX WATER
W W
4 5 CLOSET
1800
600
1200
3050
300mmX300mm UNGLAZED CERAMIC
TILES
1750
1500
900
900
900
1100
800
FINISHED FLOOR LINE
DESCRIPTION ALLUMINUM FRAMED FIX DESCRIPTION ALLUMINUM FRAMED FIX DESCRIPTION ALLUMINUM FRAMED SLIDING DESCRIPTION POWDER COATED FRAMED AWNING
WINDOW W/ 14" THK. GLASS S.798 WINDOW W/ 41" THK. GLASS WINDOW W/ 14" THK. GLASS
WINDOW W/ 14" THK. GLASS S. 798 S. 798 S.798 S E C T I O N T H R U "Y"
AREA 7.56 sq.m AREA 2.7sq.m AREA 2.33 sq.m AREA 1.08 sq.m
QUANTITY 2 QUANTITY 1 QUANTITY 1 QUANTITY 2
LOCATION ADMIN OFFICE LOCATION ADMIN OFFICE LOCATION WORK STATION LOCATION CR, DRESS ROOM
Do
Do
db
WHERE: W = TOTAL DEAD LOAD B. BEAMS AND COLUMNS (TO STIRRUPS AND TIES) 40mm
A
SIZE END HOOKS STIRRUP & TIE STIRRUP END HOOK
T = NATURAL PERIOD = Ct (hn)² ³ C. WALLS, SIDE OF FOOTIN-TIE BEAMS (CAST AGAINST FORMS) 40mm TIE A
OF
A
WHERE: C = NUMERICAL COEFFICIENT D. SUSPENDED SLAB 20mm BARS 180° 90° 90° 135° 135°
h = BUILDING HEIGHT 4.1.2 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER 10 125 150 100 100 125
I = IMPORTANCE FACTOR = 1.50 PLACEMENT OF ALL OPENINGS, SLEEVES, CURBS, CONDUITS, ETC. RELATING TO THE
D
db db
WORK. 12 150 200 113 113 163 db
R = NUMERICAL FACTOR = 8.50
4.2 REINFORCING BARS STIRRUP & TIE HOOK STIRRUP - TIE
16 175 250 150 138 200
SEISMIC COEFFICIENT Cv = 0.44Nv 4.2.1 ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER Do = 6 db for db < 30 D = 4 db for db < 20
Ca = 0.64N MATERIALS THAT WILL IMPAIR BOND. Do = 8.7 db for db > 30 D = 6 db for db > 30
4.2.2 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED
NEAR SOURCE FACTOR (10km) Nv = 1.2 BEFORE POURING CONCRETE OR APPLYING MORTAR OR GROUT.
Na = 1.0 4.2.3 LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE. 4.4 CONCRETE HOLLOW BLOCKS (CHB):
Z = SEISMIC ZONE = 0.4 (ZONE 4) 4.2.4 UNLESS OTHERWISE INDICATED, SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE
WITH ACI-318M, EXCEPT THAT THE MINIMUM LAP SPLICE SHALL BE 40 BAR DIAMETER BUT 4.4.1 UNLESS OTHERWISE INDICATED, CHB USED IN THIS WORK SHALL HAVE A MINIMUM
S = SOIL TYPE = 0 NOT LESS THAT 600mm. ULYIMATE COMPRESSIVE STRENGTH f'm = 3.45MPa (500psi)
2.1. DESIGN STRESSES 4.2.5 UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS: 4.4.2 ALL CHB CELLS SHALL BE FILLED SOLIDLY WITH GROUT.
A. CONCRETE A. INTERMEDIATE BEAMS: TOP BARS SHALL BE SPLICED AT MID-SPAN, BOTTOM BARS
COMPRESSIVE STRENGTH @ 28 DAYS fc' = 20.7 MPa (3,000 psi) AT THE SUPPORT.
B. BEAMS FRAMING TO COLUMNS: TOP BARS SHALL BE SPLICED AT MID-SPAN AND 5.0 CONSTRUCTION JOINT
B. REINFORCING BARS
BOTTOM BARS SHALL NOT BE SPLICED WITHIN THE COLUMN OR WITHIN A 5.1 CONSTRUCTION JOINT NOT INDICATED ON THE PLANS SHALL BE MADE SO AS TO LEAST OF
a. FOR BARS 16mmØ AND GREATER fy = 275 MPa (40,000 psi)
DISTANCE OF TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. THE THE IMPAIR THE STRENGTH OF THE STRUCTURE AND SHALL BE SUBJECT TO THE APPROVAL OF THE
b. FOR BARS LESS THAN 16mmØ fy = 230 MPa (33,000 psi) SPLICED LENGTH SHALL NOT BE LESS THAN 1.4 TIMES THE DEVELOPMENT LENGTH ENGINEER EXCEPT SLAB ON GRADE.
(Ld) IN 4.2.8
C. STRUCTURAL STEEL, ASTM-A36 5.2 UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS SPACED AT
C. COLUMNS: LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF OF HEIGHT AND
FOR TRUSSES, BRACINGS AND STRUTS fy = 248 MPa (36,000 psi) THE SPLICE SHALL NOT BE LESS THAN 30 BAR DIAMETER. WELDING OR THE USE OF 6000mm MAXIMUM CENTER TO CENTER.
D. PURLINS APPROVED MECHANICAL DEVICES MAY BE PERMITTED PROVIDED NOT MORE THAN 5.3 BEAM CONSTRUCTION JOINT SHALL BE LOCATED WITH IN THE MIDDLE THIRD SPAN. IT
ALTERNATE BARS ARE WELDED OR SPLICED AT ANY LEVEL AND THE MINIMUM SHALL BE PROVIDED WITH 3 EXTRA STIRRUPS @ 75mm O.C. ON EACH SIDE OF THE JOINT.
COLD FORMED LIGHT CAGE SHAPES fy = 248 MPa (36,000 psi) VERTICAL DISTANCE BETWEEN TWO ADJACENT BAR SPLICES SHALL BE 600mm.
E. MASONRY UNIT (CHB) D. CHB WALLS: VERTICAL BARS SHALL BE SPLICED AT THE TOP WALL FOOTINGS OR
NON-LOAD BEARING CHB WALLS fm' = 3.45 MPa (500 psi) FOOTING-TIE BEAMS AND AT THE BOTTOM OF REINFORCED CONCRETE LINTEL
BEAMS OR BEAMS.
F. WELDS-USED E-60xx ELECTRODE 4.2.6 UNLESS OTHERWISE INDICATED: ALL BEAMS TERMINATING AT A COLUMN SHALL HAVE
G. STRUCTURAL BOLTS, ASTM-A307 TOP AND BOTTOM BARS EXTENDING TO THE FAR FACE OF THE COLUMN, TERMINATING IN
A STANDARD 90 HOOK LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600mm.
a. Ft = 96.60 MPa (14,000 psi)
4.2.7 SHOP DRAWING FOR REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL OF THE
b. Fv = 69 MPa (10,000 psi)
1750
#16@225 C/C
#16@225 C/C
1250 1300 B4 CB4 S2 S3
#16@225 C/C
CB2
CB2
CB2
CB3 B3 B4 CB4
1750
1250
1300
3 3 3
C1 C1 C1 C1 C1 C1 C1 C1 C1
#16@225 C/C #16@225 C/C
#16@225 C/C
#16@225 C/C
#16@225 C/C
#16@225 C/C
FC2 FC3 S4 S1 S1
FC1 S4
3125
3125
3125
B2
B2
B2
B2
B2
1250 1250 1300
1250
1300
2 2 2 C1 C1 C1
C1 C1 C1 C1 C1 C1 1 4
#16@225 C/C #16@225 C/C
#16@225 C/C
#16@225 C/C
#16@225 C/C
#16@225 C/C
FC4 FC5 FC6 S4 S1 S1 S4
3125
3125
3125
B1
B1
B1
B1
B1
1300 1250 1350
#16@225 C/C
#16@225 C/C
CB3 B3 B4 CB4 S3 S2 S2 S3
1300
1250
1350
1 1 1 #16@225 C/C
C1 C1 #16@225 C/C
C1 C1 C1 C1 C1 C1
1000
CB1
#16@225 C/C #16@225 C/C
CB1
CB1
CB1
CB1
CB3 B3 B4 CB4
FC7 FC8 FC9
R.C. FOOTING
BLINDING
50mm.THK WELL COMPACTED CRUSHER FINE
300 150
A B C A B C 300 mm. DESERT FILL TYPE A
(WELL COMPACTED USING 20T VIBRO ROLLER )
3 TO 6 HARD CORE
300
(WELL COMPACTED USING 20T VIBRO ROLLER )
4000 4000 1000 4000 4000 1000
600
6 TO 9 HARD CORE
(WELL COMPACTED USING 20T VIBRO ROLLER )
1100 * THIS PROPOSAL OF STRUCTURAL FILLING ONLY APPLICABLE UNDER THIS CONDITION.
* BEARING CAPACITY FOR THE SOIL SHOULD BE VERIFIED BY THE CONTRACTOR
S2 S3
TO SATISFY HIMSELF AND ENGINEER APPROVAL .
CB2
GB2 GB2 CB3 B3 B4
3 3
C1 C1 C1 100mm THK. SLAB W/ 10mm C1 C1 C1
Ø TEMP. BARS SPACED @
400mm ON CENTER BOTHWAYS S4 S1 S1 S4
6 TYP. SEC. VARIOUS FILLING & THEIR LEVELS
3125
GB1
GB1
GB1
GB1
3125
B2
B2
B2
B2
B2
S 2 SCALE NTS
2 C1
GB2
C1
GB2
C1 1
S
3
2
CB3
C1
B3
C1
B4 CB4
C1
SLOPE SLOPE
S4 S1 S1 S4
0.25% CL 0.25%
3125
A
GB1
GB1
GB1
GB1
3125
A
B1
B1
B1
B1
B1
CB1
CB1
5000 5000
CB1
B3 B4
S
2 3
B
L=10000
1049.4(ANCHORAGE)
1049.4(ANCHORAGE)
350
350
350
A 1 2 3 B 1 2 3 C STP 2L-#10 STP 2L-#10 STP 2L-#10
2-#16 2-#16 2-#16
320 320 320
3680 3680
(LOC: 0 TO 920) (LOC: 920 TO 2760) (LOC: 2760 TO 3680)
920 920 920 920
SECTION 1-1 (GB2) SECTION 2-2 (GB2) SECTION 3-3 (GB2)
3-#16 3-#16 3-#16 3-#16 3-#16 3-#16
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)
1049.4(ANCHORAGE)
1049.4(ANCHORAGE)
2-#16 2-#16
38-2L-#10 38-2L-#10
@100 C/C @100 C/C
1 2 3 1 2 3
C1 C1 C1
GB2:250x350 GB2:250x350
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50)
1 TYP. GROUND BEAM SECTION A DETAIL
S 3 SCALE 1:80m
627(ANCHORAGE)
320 320 320
2805 2805 3-#16 3-#16 3-#16
350
350
350
STP 2L-#10 STP 2L-#10 STP 2L-#10
3-#16 2-#16 3-#16
3-#16 3-#16
(LOC: 0 TO 705) (LOC: 705 TO 2100) (LOC: 2100 TO 2805)
SECTION 1-1 (GB1) SECTION 2-2 (GB1) SECTION 3-3 (GB1)
627(ANCHORAGE)
627(ANCHORAGE)
3-#16 2-#16 3-#16 3-#16 2-#16 3-#16 (SCALE 1:25) (SCALE 1:25) (SCALE 1:25)
705 705 705
30-2L-#10 30-2L-#10
@100 C/C @100 C/C
C1 1 2 3 C1 1 2 C1
GB1:250x350 GB1:250x350
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50)
3-#16 3-#16
320 320 320 2-#16 2-#16 2-#16 3-#16
840 2805 2805 840
300
300
300
300
SFR 1-#16EF STP 2L-#10 STP 2L-#10 STP 2L-#10
840 705 705 840
3-#16 3-#16 2-#16 2-#16
3-#16 2-#16 3-#16 2-#16 3-#16
2-#16 CB1 (LOC: 0 TO 840) (LOC: 840 TO 2100) (LOC: 2100 TO 2805)
1 - T15.9 EF 1 - T9.5 EF 1 - T15.9 EF (SCALE 1:25) SECTION 1-1 (B1) SECTION 2-2 (B1) SECTION 3-3 (B1)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)
532(ANCHORAGE)
300
300
300
SFR 1-#16EF SFR 1-#16EF SFR 1-#16EF SFR 1-#16EF
CB1:250x300 B1:250x300 B2:250x300 CB2:250x300 2-#16 2-#16 2-#16 3-#16
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50)
(LOC: 0 TO 705) (LOC: 705 TO 1965) (LOC: 1965 TO 2805) CB2
SECTION 1-1 (B2) SECTION 2-2 (B2) SECTION 3-3 (B2) (SCALE 1:25)
(SCALE 1:25) (SCALE 1:25) (SCALE 1:25)
890.4(ANCHORAGE)
890.4(ANCHORAGE)
250 STP 2L-#10 250 250 250 250
320 320 320
840 3680 3680 840 3-#16 3-#16 3-#16 3-#16
920 920 920 920 2-#16 2-#16 2-#16 3-#16 2-#16
300
300
300
300
300
SFR 1-#16EF STP 2L-#10 STP 2L-#10 STP 2L-#10 STP 2L-#10
3-#16 3-#16 3-#16 3-#16 3-#16
2-#16 2-#16 2-#16 3-#16 2-#16 3-#16 3-#16 3-#16
1 - T15.9 EF 1 - T9.5 EF
CB3 (LOC: 0 TO 840) (LOC: 840 TO 920) (LOC: 920 TO 2760) (LOC: 2760 TO 3680)
SECTION 1-1 (B3) SECTION 2-2 (B3) SECTION 3-3 (B3) SECTION 4-4 (B3)
532(ANCHORAGE)
(SCALE 1:25)
3-#16 2-#16 3-#16 3-#16
430 840 (SCALE 1:25) (SCALE 1:25) (SCALE 1:25) (SCALE 1:25)
10-2L-#10 38-2L-#10 38-2L-#10 10-2L-#10
@100 C/C @100 C/C @100 C/C @100 C/C
1 C1 1 2 3 4 C1 1 2 3 C1 1
250 250 250 250
CB3:250x300 B3:250x300 B4:250x300 CB4:250x300 STP 2L-#10
(SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) (SCALE: H = 1:50 / V = 1:50) 3-#16 3-#16 3-#16
2-#16 3-#16 2-#16 2-#16
300
300
300
300
STP 2L-#10 STP 2L-#10 STP 2L-#10 SFR 1-#16EF
3-#16 3-#16 3-#16 3-#16
A
1 TYP.ROOFDECK BEAM SECTION A DETAIL B (SCALE 1:25) (SCALE 1:25) C (SCALE 1:25)
S 4 SCALE 1:80m
#16@225 C/C #16@225 C/C #16@225 C/C #16@225 C/C #16@225 C/C
#16@225 C/C #16@225 C/C #16@225 C/C #16@225 C/C #16@225 C/C
SECTION B-B
@125 C/C
(2),(3) #10
2 1.2M
750
(1) 8-#16
@150 C/C
(2),(3) #10
Z1 MAIN LINK Z1 OTHERS Z2 LINKS
425
1 1 TO
#10 @ 125 #10 @ 125 #10 @ 150
480
@150 C/C
(2),(3) #10
4.2M
320
955
#16
480
320
@150 C/C
(2),(3) #10 8-#16
320
(1) 8-#16
1350
C25 : COVER = 50MM
425
CONFINING ZONE = FULL HEIGHT
@125 C/C
(2),(3) #10
EL. 1.200
320
450
0M
TOC
@125 C/C
(2),(3) #10
SECTION 1-1 TO
Z1 MAIN LINK Z1 OTHERS Z2 LINKS
@150 C/C
(2),(3) #10
EL. 0 1.2M
230
1 1 BOF
320
#16
320
8-#16
REINFORCEMENT NOTES
COLUMN LINKS
COLUMN LINKS
A 100mm THK. CHB W/ 2-12mmØ VERTICAL
1-16mmØ VERTICAL DEFORMED BAR
BARS SPACED @ 0.60m AND HORIZONTAL
BARS @ EVERY THREE LAYER OF CHB
LD
LD
100mm THK. CHB W/ 2-12mmØ VERTICAL
BARS SPACED @ 0.60m AND HORIZONTAL BARS
@ EVERY THREE LAYER OF CHB
100mm X 200mm LINTEL BEAM W/
2-12mmØ CONTINUOUS BARS W/ 10mmØ
TIES SPACED @ 100mm O.C.
varies
BOF BOF
L B
200
DETAIL OF FOOTING FC DETAIL OF FOOTING FC OPENING
OPENING
2
100
#16 RSB
S E C T I O N T H R U "A"
4 L I N T E L B E A M DETAILS
#16 RSB
S 6 SCALE 1:10m
1 1
L
VERIFY
300
B DOWELS TO MATCH CHB
300 HORIZONTAL BARS
TOP AND BOOTOM CONTINOUS BARS TEMP. BARS SPACED AT 200mm O.C.
PROVIDES SHEAR RODS WHERE
JOINT IS @ POINT OF STRESS 10mmØ TEMPERATURE BARS SPACED
AT 200 mm O.C.
COMFORT ROOM
VERIFY
GB2 250 350 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 8-2L-#10@100 C/C 22-2L-#10@100 C/C 8-2L-#10@100 C/C - - -
SLAB SCHEDULE
BOTTOM REINFORCEMENT TOP REINFORCEMENT
SLAB SLAB ALONG SHORT SPAN ALONG LONG SPAN OVER LONG SUPPORT OVER SHORT SUPPORT REMARKS
MARKED THICKNESS DISTRIBUTION
FULL LENGTH CURTAILED FULL LENGTH CURTAILED CONTINUOUS END CONTINUOUS END
SUPPORT SUPPORT SUPPORT SUPPORT
S2,S4 150 #16 @ 225 C/C --- #16 @ 225 C/C --- #16 @ 225 C/C #16 @ 225 C/C --- #16 @ 225 C/C #16 @ 225 C/C ---
S3 150 #16 @ 225 C/C --- #16 @ 225 C/C --- #16 @ 225 C/C #16 @ 225 C/C #16 @ 225 C/C #16 @ 225 C/C #16 @ 225 C/C ---
S1 150 #16 @ 225 C/C --- #16 @ 225 C/C --- #16 @ 225 C/C --- #16 @ 225 C/C --- #16 @ 225 C/C ---
COLUMN MARKED C1
CB3,CB1 250 300 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 4-2L-#10@100 C/C 2-2L-#10@100 C/C 4-2L-#10@100 C/C 1-#16EF - CANTILEVERED
+ + +
2-#16 2-#16 2-#16
B3 250 300 2-#16 3-#16 3-#16 3-#16 3-#16 3-#16 7-2L-#10@100 C/C 24-2L-#10@100 C/C 7-2L-#10@100 C/C - - -
+ +
2-#16 2-#16
B4 250 300 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 7-2L-#10@100 C/C 24-2L-#10@100 C/C 7-2L-#10@100 C/C - - -
+ +
2-#16 2-#16
CB4 250 300 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 4-2L-#10@100 C/C 2-2L-#10@100 C/C 4-2L-#10@100 C/C 1-#16EF - CANTILEVERED
+ + +
2-#16 2-#16 2-#16
B1 250 300 3-#16 2-#16 2-#16 3-#16 2-#16 3-#16 7-2L-#10@100 C/C 16-2L-#10@100 C/C 7-2L-#10@100 C/C - - -
+
2-#16
B2 250 300 2-#16 2-#16 2-#16 3-#16 2-#16 3-#16 7-2L-#10@100 C/C 16-2L-#10@100 C/C 7-2L-#10@100 C/C 1-#16EF - -
1049.4(ANCHORAGE)
A B C
320 320 320 ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS
3680 3680
MARK NOS. DIA. SHAPE LENGTH
(MM) A B C D E F G R
920 T2-3NOS-T16 920 920 920
B
T1-3NOS-T16 T3-3NOS-T16 T4-3NOS-T16 T5-3NOS-T16 GB2 T1 3 16 A 1650 516 1173 48
D
T2 3 16 C
A B F
G
E 2145 150 97 16 1650 16 97 150
1049.4(ANCHORAGE)
1049.4(ANCHORAGE)
A
B6-2NOS-T16 B7-2NOS-T16 T3 3 16 2160 2160
S8-38NOS-T10-@100 S9-38NOS-T10-@100 D
T4 3 16 C
A B F
G
E 2145 150 97 16 1650 16 97 150
B
T5 3 16 1650 516 1173 48
GB2:250x350 GB2:250x350 A
1 2 3
627(ANCHORAGE)
627(ANCHORAGE)
320 320 320
2805 2805 ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS
MARK NOS. DIA. SHAPE LENGTH
705 (MM) A B C D E R
T1-3NOS-T16 T2-3NOS-T16 B
GB1 T1 3 16 A C
E
D 5835 228 5423 58 10 150 30
B
T2 3 16 1165 228 961 30
627(ANCHORAGE)
627(ANCHORAGE)
A
B3+B4-3NOS-T16 B5-1NOS-T16 B6-1NOS-T16 B7-1NOS-T16
A
705 705 705 B3 1 16 1235 322 935 30
B
S8-30NOS-T10-@100 S9-30NOS-T10-@100 A
B4 2 16 4185 322 3887 30
B
A
B5 1 16 4360 322 4060 30
B10:250x350 B11:250x350 B
A
B7 1 16 1235 322 935 30
B
A
S8 30 10 B 1185 170 270 30
A
S9 30 10 B 1185 170 270 30
S9DL-T10-@125
B
C1 B1 1 4 16 A C
E
D 3300 300 1153 97 16 1827 48
S7DL-T10-@125 B
B2 1 4 16 A C
E
D 2825 300 1153 97 16 1350 48
EL. 4.200
S5DL-T10-@125 TOC
B
S8DL TO S10DL
B3 2 4 16 D
E C A 1875 300 1028 97 16 477 48
B
B4 2 4 16 D 2350 300 1505 97 16 477 48
750
E C A
8-#16
S8L TO S10L
A
S5DL 1 7 10 B 1200 220 220 30
S10DL-T10-@125
425
2 2 A
S6DL 1 7 10 375 220 30
S8DL TO S10DL
S8DL-T10-@125
A
S7DL 1 7 10 350 204 30
955
B3
B3
A
S8L 2 4 10 B 1125 220 220 30
S8L TO S10L
B4
B1
B1
B2
S8DL TO S10DL
S8DL 2 18 10 1200 220 220 30
425
B
8-#16
B4 B4
8-#16 EL. 1.200 S9L 2 4 10
A
375 220 30
450
B2 B2
TOC
S5DL TO S7DL
B4
S9DL 2 18 10 375 220 30
B3
B3
B2
A
B1
B1
EL. 0 S10DL 2 18 10
A
350 204 30
230
1 1 BOF
¶
150
#16@225 C/C
150 THK
3150.00
/C
15
0C
20
0.0
6@
00
#1
0
C /C
25
6 @2
#1
0
45 SECTION
#16@225 C/C
#16@225 C/C
#16@225 C/C
1000
0
150
45
#16@225 C/C
450
6000.00
#16@225 C/C
PLAN
1000.00
2 RAMP DETAIL
S 10 SCALE NTS
REPUBLIC OF THE PHILIPPINES CONSTRUCTION OF ONE-STOREY TYPICAL COLUMN BAR CUTTING LIST
DEPARTMENT OF TRADE AND INDUSTRY WITH ROOFDECK RICE RAMP DETAIL
CORDILLERA ADMINISTRATIVE REGION PROCESSING CENTER 10 14
CEDRICK MAR A. KIMPALONG BOB JOHN A. BONGNGAT ANTONIO CALADING LINO D. CUNGIHAN MYRNA P. PABLO ANGGACAN, TANUDAN, KALINGA
STRUCTURAL DESIGNER
MANAGER, ROCKWELL BUILDERS
RIZAL PARK, SALVOSA DRIVE, BAGUIO CITY 2600
PO PRESIDENT/REPRESENTATIVE PROVINCIAL DIRECTOR, DTI KALINGA REGIONAL DIRECTOR, DTI CAR S-13 20
PRC. NO: 0140412 TIN. NO:326376510
PTR. NO:2854865 PRC VALIDITY: 04/23/2024
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS
A B C MARK NOS. DIA. SHAPE LENGTH
(MM) A B C D E F G R
320 320 320
840 3680 3680 840
B
920 920 920 920 CB3, T1 3 16 A 2285 263 2060 48
T1-3NOS-T16 T3-3NOS-T16 T4-3NOS-T16 T6-3NOS-T16 T7-3NOS-T16 B3, B
A
B10 1 16 1030 263 792 30
B
A
B11 2 16 5745 5745
A
B12 1 16 4055 4055
D
B13 3 16 C
A B 4535 891 97 16 3547
E C A
B14 3 16 D 1035 263 164 97 16 532 30
B
A
S15 10 10 B 1170 210 260 30
A
S16 38 10 B 1245 210 260 30
A
S17 38 10 B 1245 210 260 30
A
S18 10 10 B 1170 210 260 30
B
F19 2 16 A 2565 150 2451 48
A
F20 2 16 820 820
A
SB21 1 16 230 230
A
SB22 2 16 230 230
A
SB23 2 16 230 230
A
SB24 1 16 230 230
A
B8 1 16 1695 1695
A
B9 2 16 4870 4870
D
B10 2 16 C
A B 3660 891 97 16 2672
A
B11 1 16 1565 263 1324 30
B
E C A
B12 2 16 D 1035 263 164 97 16 532 30
B
A
S13 10 10 B 1170 210 260 30
A
S14 30 10 B 1245 210 260 30
A
S15 30 10 B 1245 210 260 30
A
S16 10 10 B 1170 210 260 30
B
F17 2 16 A 2565 150 2451 48
A
F18 2 16 2785 2785
A
F19 2 16 820 820
A
SB20 1 16 230 230
A
SB21 1 16 230 230
SUMMARY : FC2
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL
MARK NOS. DIA. SHAPE LENGTH
(MM) A B C D E R LGT (M) 18 18
A C
FC2 B1 7 16 1305 150 1085 150 48 WT (KG) 28 28
B
B2 7 16 A C
1305 150 1085 150 48 SUMMARY : FC7
B
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL
MARK NOS. DIA. SHAPE LENGTH
(MM) A B C D E R LGT (M) 18 18
SUMMARY : FC3
A C
FC7 B1 7 16 1355 150 1135 150 48 WT (KG) 29 29
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL B
MARK NOS. DIA. SHAPE LENGTH A C
B2 7 16 1355 150 1135 150 48
(MM) A B C D E R LGT (M) 18 18 B
A C
FC3 B1 7 16 1355 150 1135 150 48 WT (KG) 29 29
B
A C
B2 7 16 1355 150 1135 150 48
B
SUMMARY : FC4
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL
MARK NOS. DIA. SHAPE LENGTH
SUMMARY : FC8
(MM) A B C D E R LGT (M) 18 18
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL
FC4 B1 7 16 A C
1305 150 1085 150 48 WT (KG) 28 28 MARK NOS. DIA. SHAPE LENGTH
B (MM) A B C D E R LGT (M) 18 18
A C
B2 7 16 1305 150 1085 150 48 A C
B FC8 B1 7 16 1305 150 1085 150 48 WT (KG) 28 28
B
A C
B2 7 16 1305 150 1085 150 48
B
SUMMARY : FC5
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL
MARK NOS. DIA. SHAPE LENGTH
(MM) A B C D E R LGT (M) 18 18
A C
FC5 B1 7 16 1305 150 1085 150 48 WT (KG) 28 28
B
B2 7 16 A C
1305 150 1085 150 48
SUMMARY : FC9
B
ELEMENT BAR BAR BAR BAR CUTTING DIMENSIONS BAR DIA 16 TOTAL
MARK NOS. DIA. SHAPE LENGTH
(MM) A B C D E R LGT (M) 20 20
A C
FC9 B1 7 16 1405 150 1185 150 48 WT (KG) 30 30
B
A C
B2 7 16 1405 150 1185 150 48
B
TOTAL QUANTITY
BAR DIA 16 TOTAL
S 12 SCALE NTS
R
PCKT-04 PCKT-05
10. ALL ELECTRICAL EQUIPMENT AND MATERIALS SHALL CONFORM TO THE APPLICABLE REQUIREMENTS, MAIN CIRCUIT
V
E
UNDERWRITER'S LABORATORY (UL), NATIONAL FIRE FIRE PROTECTION (NTFA), NATIONAL ELECTRICAL LCKT-02 15 AT 30 AT PCKT-06 BREAKER PCKT-03 PCKT-06
PANEL BOX
I
V
MANUFACURER'S ASSOCIATION (NEMA) AND OTHER RELATED PUBLICATIONS.
R
I
11. WORKMANSHIP SHALL BE EQUAL TO THE BEST STANDARD PRACTICE RECOGNIZED AND ADOPTED FOR CIRCUIT RUN ON CEILING OR WALLS (PVC PIPE) LCKT-02 SPARE
THIS TRADE. R PCKT-03 20 AT 20AT SPARE
O
C2
D
LOWER MANGALI
MALLANGO
UPPER 4 L E G E N D GROUND WIRE
A
ANGGACAN GUIMMA
BANGAD
E 1 SCALE NTS
T
BABBANOY
AMBATO UPPER LUBO LOWER LUBO
A B C A B C
TINGLAYAN
PROPER TANUDAN
R
4000 4000
4000 4000
E
V
LUPLUPA
I
SITE 1000
C
1000
I
COORDINATE,17.33835,121.22709 DACALAN
C
2 LOCATION MAP 1 1 RG D
a b
E 1 SCALE NTS
LCKT-01
a
PCKT-05
3125
3125
ABBREVIATIONS:
PCKT-06
Sa a a b
A A, AMP AMPERE
AF AMPERE FRAME
2 2
AT AMPERE TRIP PB MPVS
b
C C CONDUIT Sb
CB CIRCUIT BREAKER
3125
PCKT-03
PCKT-04
c d
3125
H HZ HERTZ Sd,c
3 3 CBS
1000
P P POLE c c
1000
LCKT-02
PVC POLYVINYL CHLORIDE
V V VOLT
Ø PHASE, DIA.
4. MINIMUM SLOPE FOR SEWERAGE SHALL BE 2% AND DRAIN 1%. 1300 1500 1300
5. ALL CO'S SHALL BE FLUSHED MOUNTED TO WALL AND PROVIDE WITH 1
2" Ø PVC PIPE
POLISHED COVER CAPS. DO NOT INSTALL CLEAN OUTS EXCEPT AT LINE 4100
ON GRADE AND SERVICE NOT SUBJECTED TO TRAFFIC FLOWS.
6. ALL UNDERGROUND G.I. PIPES IN DIRECT CONTAT WITH THE SOIL SHALL BE
PROVIDED WITH TWO COATS OF PROTECTIVE TAR COVERED AND
2000
9. PROVIDE WATER PRESSURIZED TANK TO MEET THE WATER DEMAND FROM
11. ALL ELECTRICAL WORKS SHALL BE DONE
UNDER THE DIRECT AND IMMEDIATE
SUPERVISION OF A DULY REGISTERED
ELECTRICAL ENGINEER.
WC
2000
1ST TO 3RD FLOOR. FD
10. ALL PLUMBING WORKS SHALL BE UNDER THE DIRECT SUPERVISION OF A
R
R
F
DULY LICENCED SANITARY ENGINEER OR A MASTER PLUMBER. SEPTIC TANK
E
E
WATER SUPPLY
V
V
I
500
R
P 1 SCALE NTS
ANGGACAN, TANUDAN, KALINGA
O
COORDINATE,17.33835, 121.22709
N
C
UPPER DALNACAN
MABONGTOT
A
I
TALOCTOC
500
MANANGOL
H
LICUTAN
C2 SITE MATTELED
C
GUMBOWOY
MANGALI CENTRO ANGGACAN SUR
BANGAD BAKKUNG
4 WATER LINE LAYOUT PLAN 5 SEWERAGE LAYOUT PLAN
CABUGAO
CENTRO POBLACION
P 1 SCALE 1:25m
P 1 SCALE 1:50m
BABBANOY
AMBATO UPPER LUBO LOWER LUBO
TINGLAYAN
PROPER TANUDAN
LUPLUPA
GA-ANG
DACALAN
2 LOCATION MAP LA
V
P 1 SCALE NTS
CO
V
V LA
LA WC FD
BRANCH/SUPPLY SIZE
ABBREVIATION SYMBOLS DESCRIPTION
SP WP DP CWL
SP
CB CATCH BASIN E-
PIP
CO CLEAN OUT 100mmØ 50mmØ AV VC
L uP
3 1 F mØ
CWL COLD WATER LINE (PVC) 4"Ø, 2"Ø
WC 10
0m
DP DRAINAGE PIPE (uPVC) 100mmØ
IPE 2 "1Ø
DS DOWN SPOUT (uPVC) 75mmØ CP PV
C
PV PIP
FD FLOOR DRAIN 50mmØ 1 2"Ø E
3
GV GATE VALVE 4"Ø
3
KS KITCHEN SINK 4"Ø
4 "3Ø
1 PV
LAV LAVATORY 50mmØ 2"Ø C
3 1 PIP
PVC POLYVINYL CHLORIDE 4"Ø, 2"Ø E
SDP STORM DRAIN PIPE(uPVC) 100mmØ
SP SOIL PIPE (uPVC) 100mmØ
LY
PP
uPVC UNPLASTICIZED POLYVINYL CHLORIDE 100mmØ 50mmØ SU
TE
R NK
VP VENT PIPE 50mmØ WA TA
IC
WC WATER CLOSET 100mmØ 3
4"Ø
PT
SE
WP WASTE PIPE 50mmØ
PVC P-TRAP
1000
510
800
510
395
CO
150
130
PLAN FINISHED FLOOR LINE FINISHED FLOOR LINE
CONCRETE MANHOLE COVER WITH 8-10mmØ
REBARS EQUALLY SPACED BOTHWAYS
PROVIDED WITH 12mmØ LIFT BAR
150mm THK. PLASTERED 100mm CHB WALL W/ 6 TOILET FIXTURE MOUNTING DETAILS
10mmØ VERTICAL REBARS SPACED @ 600mm O.C.,
560 560 560 10mmØ HORIZONTAL REBARS SPACED @ EVERY 3 LAYERS OF CHB P 2 SCALE 10:m
PIPE CAP
510 510 510
4"Ø SANITARY TEE
AIR SPACE
300
300
4"Ø uPVC INLET 4" Ø PVC PIPE DRAINAGE LINE BARS AT 300mm O.C.B.W.
50
INCREASER
75
INLET
50
3
4"Ø PVC PIPE NIPPLE
100
1800
OUTLET
500
CHAMBER 1 CHAMBER 2
400
200
OUTLET OUTLET
12mmØ REBARS SPACED
OUTLET
@ 200mm O.C.B.W. 1
2"Ø PVC SUPPLY PIPE
75
1:10 slope 1:10 slope TEE
1:10 slope
200
MANHOLE
SECTION
7 CATCH BASIN DETAILS 8 AIR CHAMBER DETAIL
2 SEPTIC TANK DETAILS P 2 SCALE 1:10m
P 2 SCALE 1:10m
P 2 SCALE NTS