Customer : PT. Geo Struktur Indonusa Date of Received : March 29th 2022
Made on behalf of : - Date of Test : April 1st 2022
Address : Jl. Kapten Soemarsono No. 66, Helvetia Deli Serdang, Medan - Indonesia Date of Analysis : April 4th 2022
Project : Proyek Pembangunan Bangunan Penagrah Bendungan Rukoh Kab. Pidie (MYC) Tested By Sudibyo, Sugito
Location : Kabupaten Pidie, Aceh : Kurnia, Nurman
Test Report : GMK-008/III/2022_PT.GSI Prepared By : Rian Guhya
Standard Method : ISRM 2007 Checked By : Yudhi
σc = Compressive Strength
E = Young's Modulus
u = Poisson's Ratio
Note :
1. The results of the test are ONLY valid for the samples tested with the codes, depths, and litologies appeared in the above table
2. The laboratory allows a maximum of 30-day limit from the date of test report submission for the client to file complaints regarding the test results