Professional Documents
Culture Documents
Master Infrastructure 25 November 2021
Master Infrastructure 25 November 2021
Physical Availability
Actual
Site Model Plan BMB CP8
Today MTD
89% 90% 90% 90% 90% 90% 89% 90% 89% 90% 90% 89% 89%
Tower Lamp 85% 100% 89% 80% 80% 87% 80% 80% 80% 80% 79% 86% 80% 87%
Dump Truck FM260 85% 100% 100%
BMB CP8
Dump Truck ZS 85% 73% 75%
All Unit 85% 89% 86% 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01
Series1 Actual
Plan Actual
BMB CK
100% 96% 100% 95% 100% 95% 100% 98% 98% 100% 97% 100%100%100% 99% 100%100% 99% 100%100%100% 98% 100%100%
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01
Plan Actual
Pareto Problem
Status BMB CP8 BMB JABARU BMB SP0 BMB CK Total BMB CP8 IN WM BMBWFJABARU
WM IN PV BMB SP0 WF
WP
PV
IN WM BMB CK
WM; IN; -
0% 0% 0% 0% 0% 0% 0%
0%
6% 0%
WAITING MECHANIC - - - - - WF; -
PM -
PROGRESS MECHANIC 209,5 418,9 588,2 30,0 1.246,6 26%
WP PV; -
WP 35%
WAITING PART 24,0 230,0 38,0 - 292,0 3%
WAITING FABRIKASI - - - - - PV PM
WF PM WP;
71% 65% PM;
PROGRESS VENDOR 576,0 - - - 576,0 0% 94% -
30,0
INVESTIGASI (ACCIDENT) - - - - -
PICA
WT226 HOIST CYL DUMP PROBLEM TROUBLESHOOT HOIST CYLINDER DUMP (INDIKASI ROD CYLINDER BENDING) WAITING PART
WE144 UCR PROGRAM REPLACE FINAL DRIVE RH ( WAITING FINAL DRIVE, PR 5352) WAITING PART
NOICE AREA GARDAN REMOVE SUPPORT JOINT REAR DIFFRENTIAL AND CHECK
WL61 SUPPORT JOINT GARDAN WORN OUT ANOTHER COMPONENT) WAITING PART
(WAITING PART MR23119 )
Progress
HOSE INDIKASI KEBOCORAN CHECK HOSE PINGGANG & O-RING 13.00
Mechanic