Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Engine Electrical Control (4JA1) 1Z-1

Engine
Engine Electrical Control
(4JA1)
Table of Contents
QOS control module........................................................1Z-2
removal........................................................................1Z-2
installation...................................................................1Z-3
EGR control module........................................................1Z-4
removal........................................................................1Z-4
installation...................................................................1Z-5
1Z-2 Engine Electrical Control (4JA1)

QOS control module

removal
1. Preliminary and post procedures
1. Preliminary procedures
1) Disconnect the battery cable from the battery
negative terminal.
2. QOS control module removal
1) Disconnect the connector from the QOS control
module.
2) Remove the QOS control module from the bracket.
Engine Electrical Control (4JA1) 1Z-3

installation
1. QOS control module installation
1) Install the QOS control module to the bracket.
2) Connect the connector to the QOS control module.
2. Preliminary and post procedures
1. Post procedures
1) Connect the battery cable to the battery negative
terminal.
1Z-4 Engine Electrical Control (4JA1)

EGR control module

removal
1. Preliminary and post procedures
1. Preliminary procedures
1) Disconnect the battery cable from the battery
negative terminal.
2. EGR control module removal
1) Disconnect the connector from the EGR control
module.
2) Remove the EGR control module from the bracket.

Legend
1. EGR control module
Engine Electrical Control (4JA1) 1Z-5

installation
1. EGR control module installation
1) Install the EGR control module to the bracket.
2) Connect the connector to the EGR control module.

Legend
1. EGR control module

2. Preliminary and post procedures


1. Post procedures
1) Connect the battery cable to the battery negative
terminal.

You might also like