Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

OBO.RED.L.

012

Republic of the Philippines


OFFICE OF THE CITY BUILDING OFFICIAL
City Hall Bldg., J.P. Rosales Ave., Doongan, Butuan City

CHECKLIST OF DOCUMENTARY REQUIREMENTS


AMENDATORY PERMIT

Note: For those with approved Building Permit who wish to amend plans
ATTACHED

LACKING

NO. OF
PARTICULARS FROM
SETS/COPIES

PLANS: Accomplished in NBC Standard Format


Registered and Licensed
ARCHITECTURAL PLANS(if
(if with amendments)
amendments 5
Architect
STRUCTURAL PLANS (if with amendments
amendments) 5 Licensed Civil/Structural Engineer
ELECTRICAL PLANS (if with amendments) 5 Professional Electrical Engineer
Master Plumber/Sanitary
PLUMBING/SANITARY PLANS (if with amendments)
amendments 5
Engineer
ELECTRONICS PLANS (if with amendments)
amendments 5 Professional Electronics Engineer
Professional Mechanical
MECHANICAL PLANS (if with amendments)) 5
Engineer
BUILDING PERMIT FORMS:
BUILDING PERMIT FORMS 3 Office of the Building Official
ARCHITECTURAL PERMIT FORMS (if with amendments
amendments) 2 Office of the Building Official
CIVIL / STRUCTURAL PERMIT FORMS (if with
2 Office of the Building Official
amendments)
ELECTRICAL PERMIT FORMS (if with amendments)
amendments 2 Office of the Building Official
PLUMBING/SANITARY PERMIT FORMS (if with
2 Office of the Building Official
amendments)
ELECTRONICS PERMIT FORMS (if with amendments)
amendments 2 Office of the Building Official
MECHANICAL PERMIT FORMS (if with amendments
amendments) 2 Office of the Building Official
CLEARANCES:
LOCATIONAL CLEARANCE (IfIf with major amendments) 2 City Planning Office
FIRE SAFETY CLEARANCE (IfIf with major amendments) 1 Bureau of Fire Protection
TECHNICAL DOCUMENTS:
Licensed Architect / Civil
GENERAL SPECIFICATIONS (IfIf with major amendments) 2
Engineer
Licensed Architect / Civil
BILL OF MATERIALS (IfIf with major amendments) 5
Engineer
ELECTRICAL DESIGN ANALYSIS(if
(if necessary) 2 Professional Electrical Engineer
OTHERS:
PHOTOCOPY OF PRC ID & PTR 1
SPECIAL POWER OF ATTORNEY FOR THE
PROCESSOR (IF APPLICABLE)
Checked by: PROJECT: _____________________________________________
_____________________________________________
OWNER: _____________________________________________
ADDRESS: _____________________________________________
__________________________ _____________________________________________
CITY BUILDING OFFICIAL

Note: *Please comply the lacking documents shown in the checklist. *Please follow the checklist for the general arrangement of the documents.

You might also like