BILL NO. 8
ANCILLARY BUILDINGS
1. Pump House
2. Electrical Building
Notes:
The preambles and notes contained in the
previous Bills shall apply equally to the relevant
works contained in this Bill.
C/C… RM
Excavation
Note:-
Hardcore As Described
C/C… RM
Concrete Works
C/C… RM
FRAME
Concrete Works
F Column M3 2
G Roof beam M3 1
Note:-
In Column
In Roof Beam
C/C… RM
In Roof Beam
A 12 mm Diameter bar Kg 22
B 16 mm Diameter bar Kg 39
C Sides of column M2 16
Roof Covering
C/C… RM
ROOF (CONT'D)
Notes:-
C/C… RM
ROOF (CONT'D)
Notes:- (Cont'd)
C/C… RM
ROOF (CONT'D)
Notes:- (Cont'd)
Rates to incude
C/C… RM
ROOF (CONT'D)
Sawn Hardwood
EXTERNAL WALLS
C/C… RM
DOORS
Notes:-
Roller Shutter
WINDOWS
Notes:-
C/C… RM
WINDOWS (CONT'D)
C/C… RM
WINDOWS (CONT'D)
Painting As Described
Glazing As Described
FLOOR FINISHES
Note:-
C Floor M2 10
C/C… RM
Waterproofing System
A Floor M2 10
WALL FINISHES
Notes:-
D Sides of column M2 8
C/C… RM
B Sides of column M2 8
Painting As Described
C/C… RM
CEILING FINISHES
Notes:-
C/C… RM
Painting As Described
C/C… RM
PLUMBING SYSTEM
Notes:-
C/C… RM
Notes:-
C/C… RM
Amount (RM)
COLLECTION
Amount (RM)
Excavation
Note:-
Hardcore As Described
C/C… RM
Sandfilling
Concrete Works
H Stump M3 2
C/C… RM
C Trench wall M3 40
Note:-
In Stump
In Raft Foundation
In Stump
In Trench Wall
In Apron
C/C… RM
In Ramp
MISCELLANEOUS TEST
Note:-
C/C… RM
FRAME
Concrete Works
A Column M3 6
B Roof beam M3 9
Note:-
In Column
In Roof Beam
H Sides of column M2 68
C/C… RM
ROOF
Concrete Works
Waterproofing System
C/C… RM
ROOF (CONT'D)
Notes:-
C/C… RM
ROOF (CONT'D)
Notes:- (Cont'd)
Rates to incude
C/C… RM
ROOF (CONT'D)
Note:-
C/C… RM
ROOF (CONT'D)
Roof Covering
C/C… RM
ROOF (CONT'D)
C/C… RM
ROOF (CONT'D)
Rainwater Goods
Note:-
C/C… RM
EXTERNAL WALLS
Concrete Works
A Window coping M3 1
B Coping M3 9
Note:-
In Window Coping
C 12 mm Diameter bar Kg 42
In Coping
C/C… RM
DOORS
Notes:-
C/C… RM
DOORS (CONT'D)
Roller Shutter
C/C… RM
DOORS (CONT'D)
Painting As Described
C/C… RM
DOORS (CONT'D)
IRONMONGERY
Notes:-
C/C… RM
WINDOWS
Notes:-
Glazing As Described
C/C… RM
FLOOR FINISHES
Note:-
A Floor M2 158
Waterproofing System
E Floor M2 158
F Apron slab M2 54
C/C… RM
WALL FINISHES
Notes:-
Painting As Described
C/C… RM
Painting As Described
CEILING FINISHES
Notes:-
C/C… RM
Notes:- (Cont'd)
Ceiling Insulation
Insulation Blanket
C/C… RM
Painting As Described
Notes:-
C/C… RM
Notes:-
C/C… RM
Amount (RM)
COLLECTION
Carried Forward … RM -
Amount (RM)
BILL NO. 8
ANCILLARY BUILDINGS
SUMMARY
Amount
From Page No. Section
(RM)