Professional Documents
Culture Documents
Form Open Closed Vetting Pertamina Spob Elisabeth 03
Form Open Closed Vetting Pertamina Spob Elisabeth 03
2. Oil record Book part 2 was found not update,last record on year 2021
Root Cause 1. The completion of recording on oil record book part 1 was found not meeting with
(Akar Masalah) the requirements of MEPC.1/Cicr. 736/Rev. 2;
2. Oil record Book part 2 was found not update,last record on year 2021
Corrective Action 1. Provides the completion of recording on oil record book part 1
(Tindakan Perbaikan)
2. Provides oil record Book part 2
Preventive Action 1. Provides the completion of recording on oil record book part 1
(Tindakan Pencegahan)
2. Provides oil record Book part 2
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 1 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
4.12 A sample charts used for voyage was found not being corrected. Operators wasn’t
provided Indonesia Notice to Mariners to the vessel for chart correction guide
Root Cause A sample charts used for voyage was found not being corrected. Operators wasn’t
(Akar Masalah) provided Indonesia Notice to Mariners to the vessel for chart correction guide
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 2 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
5.9 Ship/shore safety cheklist was found not being prefared during cargo activity
Root Cause Ship/shore safety cheklist was found not being prefared during cargo activity
(Akar Masalah)
Corrective Action Provides ship/shore cheklist
(Tindakan Perbaikan)
Preventive Action Provides ship/shore cheklist
(Tindakan Pencegahan)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 3 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
5.13 There is no evidence that emergency drills has been conducted onboard by crews staf
Root Cause There is no evidence that emergency drills has been conducted onboard by crews staf
(Akar Masalah)
Corrective Action Provides evidence that emergency drills has been conducted onboard by crews staf
(Tindakan Perbaikan)
Preventive Action Provides evidence that emergency drills has been conducted onboard by crews staf
(Tindakan Pencegahan)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 4 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
5.35 Operating instruction of fixed CO2 system onboard was found not cleary displayed near the
system
Root Cause Operating instruction of fixed CO2 system onboard was found not cleary displayed near the
(Akar Masalah) system
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 5 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
6.6 Manifolds spill containers in place under the cargo manifolds located main deck was found
not provided with drainage arrangement
Root Cause Manifolds spill containers in place under the cargo manifolds located main deck was found
(Akar Masalah) not provided with drainage arrangement
Corrective Action Provides spill containers in place under the cargo manifolds loacted main deck
(Tindakan Perbaikan)
Preventive Action Provides spill containers in place under the cargo manifolds loacted main deck
(Tindakan Pencegahan)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 6 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
Root Cause Information on maximun loading rate onboard was found not clearly marked
(Akar Masalah)
Corrective Action Provides information on maximum loading rate onboard
(Tindakan Perbaikan)
Preventive Action Provides information on maximum loading rate onboard
(Tindakan Pencegahan)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 7 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
10.1 Operating instruction of diesel engine located at engine room was found not clearly displayed near
the engine
Root Cause Operating instruction of diesel engine located at engine room was found not clearly displayed near
(Akar Masalah) the engine
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
MAIN ENGINE
AXULIARY ENGINE
Page 8 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
10.12 Planned maintenance system of engine department was found not avalble onboard
Root Cause Planned maintenance system of engine department was found not avalble onboard
(Akar Masalah)
Corrective Action Provides planned maintenance system of engine departmen
(Tindakan Perbaikan)
Preventive Action Provides planned maintenance system of engine departmen
(Tindakan Pencegahan)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
Page 9 of 10
INSPECTION CLOSED-OUT FORM
Ships Name SPOB ELISABETH 03
(Nama Kapal)
Ship Owner/Operator PT. ELISABETH BERKAT ENERGI
(Pemilik/Pengelola Kapal)
Date | Port of Inspection 26 JANUARI 2023 GANDUS, PANGKALAN PALEMBANG
(Tanggal | Pelabuhan Inspeksi) SUMATERA SELATAN
10.19 Fuel delivery pipes of diesel engine located at angine room was found not provided with “anti splash
tape”
Root Cause Fuel delivery pipes of diesel engine located at angine room was found not provided with “anti splash
(Akar Masalah) tape”
Corrective Action Provides “pita anti cipratan” on pipe diesel engine fuel lines
(Tindakan Perbaikan)
Preventive Action Provides “pita anti cipratan” on pipe diesel engine fuel lines
(Tindakan Pencegahan)
Close-Out evidence might be; documents, procedures, photos, certificate, service report, delivery order, etc.)
(Bukti tindak lanjut dapat berupa; dokumen, prosedur, poto, sertifikat, laporan kerja, bukti pengiriman, dll.)
MAIN ENGINE
AXULIARY ENGINE
Page 10 of 10