© Scaled Agile, Inc.

ART Capacity Allocation specifies the planned


effort for each type of activity in a PI. The
Capacity Allocation default is New Features, Enablers and
Tech Debt and Maintenance.
10% About this report:

20% Instructions:
New Features Enter the desired capacity allocation in
the cells below (yellow). Change the
Enablers column titles as needed. If you need an
additional capacity allocation type,
Tech Debt and simply insert a new column to the left of
Maintenance
the last type.
70%

New Features Enablers Tech Debt and Maintenance Total


Capacity Allocation 70% 20% 10% 100%

© Scaled Agile, Inc. Page 1 of 5


© Scaled Agile, Inc.

Capacity Allocation specifies the planned effort for


Team 1 each type of activity in a PI. The default is User
Capacity Allocation Stories, Refactors+ (refactors, redesigns, and
technology upgrades), and Maintenance.
20% About this report:
Instructions:
10%
Enter the desired capacity allocation in the cells below
User Stories (yellow). Change the column titles as needed. If you
need an additional capacity allocation type, simply
Refactors+ insert a new column to the left of the last type.

Maintenance

60%

User Stories Refactors+ Maintenance Total


Capacity Allocation 70% 20% 10% 100%

© Scaled Agile, Inc. Page 2 of 5


© Scaled Agile, Inc.

Capacity Allocation specifies the planned effort for


Team 2 each type of activity in a PI. The default is User
Capacity Allocation Stories, Refactors+ (refactors, redesigns, and
technology upgrades), and Maintenance.
20% About this report:
Instructions:
10%
Enter the desired capacity allocation in the cells below
User Stories (yellow). Change the column titles as needed. If you
need an additional capacity allocation type, simply
Refactors+ insert a new column to the left of the last type.

Maintenance

60%

User Stories Refactors+ Maintenance Total


Capacity Allocation 70% 20% 10% 100%

© Scaled Agile, Inc. Page 3 of 5


© Scaled Agile, Inc.

Capacity Allocation specifies the planned effort for


Team 3 each type of activity in a PI. The default is User
Capacity Allocation Stories, Refactors+ (refactors, redesigns, and
technology upgrades), and Maintenance.
20% About this report:
Instructions:
10%
Enter the desired capacity allocation in the cells below
User Stories (yellow). Change the column titles as needed. If you
need an additional capacity allocation type, simply
Refactors+ insert a new column to the left of the last type.

Maintenance

60%

User Stories Refactors+ Maintenance Total


Capacity Allocation 70% 20% 10% 100%

© Scaled Agile, Inc. Page 4 of 5


© Scaled Agile, Inc.

Capacity Allocation specifies the planned effort for


Team 4 each type of activity in a PI. The default is User
Capacity Allocation Stories, Refactors+ (refactors, redesigns, and
technology upgrades), and Maintenance.
20% About this report:
Instructions:
10%
Enter the desired capacity allocation in the cells below
User Stories (yellow). Change the column titles as needed. If you
need an additional capacity allocation type, simply
Refactors+ insert a new column to the left of the last type.

Maintenance

60%

User Stories Refactors+ Maintenance Total


Capacity Allocation 70% 20% 10% 100%

© Scaled Agile, Inc. Page 5 of 5