Professional Documents
Culture Documents
Ut Report - 031 - Etihad Rail DB - 22.11.2017
Ut Report - 031 - Etihad Rail DB - 22.11.2017
Drawing No: N/A Procedure No : L4-UAE-048L (Rev 4) Applicable Code: ASME SEC-V
Knuckles
ID: 043-B
1. ID: 180-B 04 Nos N/A N/A NRI Acceptable
ID: 214-A
ID: 102-A
REMARKS: - UT was carried out on the above mentioned items to check the sub-surface discontinuity.
Drawing No: N/A Procedure No : L4-UAE-048L (Rev 4) Applicable Code: ASME SEC-V
Knuckles
ID: 102-B
2. ID: 001 04 Nos N/A N/A NRI Acceptable
ID: 002
ID: 003
REMARKS: - UT was carried out on the above mentioned items to check the sub-surface discontinuity.