PART 1 - GENERAL
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and related Specification Sections, apply to this Section.
1. Thermal wheels.
B. Seismic Performance: Air-to-air energy recovery equipment shall withstand the effects of
earthquake motions determined according to ASCE/SEI 7.
1. The term "withstand" means "the unit will remain in place without separation of any parts
from the device when subjected to the seismic forces specified and the unit will be
fully operational after the seismic event."
D. Supply, deliver, install and warrant the work in strict compliance with the materials and
workmanship requirements of the Specification.
E. Where required to prepare Shop Drawings, these shall be limited to final detailing of
components, systems indicated on the Design Drawings, necessary to demonstrate their
safe installation.
F. Where products are offered by the Contractor for acceptance by the Engineer, provide full
supporting documentation in respect of the complete system or installation.
A. Product Data: For each type of product indicated. Include rated capacities, operating
characteristics, furnished specialties, and accessories.
B. Shop Drawings: For air-to-air energy recovery equipment. Include plans, elevations,
sections, details, and attachments to other work.
D. Supplementary Product Literature: Include a statement from the manufacturer for the design
life of the system and compliance with the Specification requirements.
I. Method Statement.
J. Quality Plan.
A. Coordination Drawings: Plans, elevations, and other details, drawn to scale, on which the
following items are shown and coordinated with each other, using input from Installers of the
items involved:
1. Basis for Certification: Indicate whether withstand certification is based on actual test
of assembled components or on calculation.
A. General: Comply with the requirements of General Requirements Division and submit the
following.
1. Warranties.
2. Operation and Maintenance (O&M) Manuals: Include component list with manufac-
turer's reference numbers, descriptions of materials and procedures for repairing and
cleaning of finishes and cleaning frequency.
A. Furnish extra materials that match products installed and that are packaged with protective
covering for storage and identified with labels describing contents.
2. Fan Belts: One set of belts for each belt-driven fan in energy recovery units.
B. ASHRAE Compliance:
2. Capacity ratings for air-to-air energy recovery equipment shall comply with
ASHRAE 84, "Method of Testing Air-to-Air Heat Exchangers."
2. Electric coils shall comply with requirements in UL 1995, "Heating and Cooling
Equipment."
D. AHRI Compliance:
1. AHRI 1060 Performance Rating of Air to-Air Exchangers for Energy Recovery
Ventilation Equipment
F. All Heat recovery devices shall either AHRI certified or Eurovent Certified.
G. Provide testing and inspections in accordance with General Requirements Division, and
Quality Control Section.
2. The provision of testing data or the carrying-out of tests does not relieve the Contractor
of his responsibilities regarding the performance requirements, durability or service life
requirements.
A. Heat recovery equipment shall be used to collect heat in the extract discharge and deliver it
into the supply air system.
B. Systems shall be selected for minimum air and water-side pressure drops. Where possible
they shall be located to collect heat provided by the exhaust fans. Full details of all heat
recovery equipment proposed including inlet and outlet conditions, controls and recovery
efficiency shall be submitted with the Tender.
C. A panel filter shall be provided before any heat recovery device. Where condensation is
likely in the duct, adequate drainage facilities as described for coils shall be provided.
A. Coordinate layout and installation of air-to-air energy recovery equipment and suspension
system with other construction that penetrates ceilings or is supported by them, including
light fixtures, HVAC equipment, fire-suppression system, and partition assemblies.
B. Coordinate sizes and locations of concrete bases with actual equipment provided.
C. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations
with actual equipment provided.
1.11 WARRANTY
2.1 MANUFACTURERS
Air-to-Air Energy Recovery Ventilators shall be fully assembled at the factory and consist of
a fixed-plate cross- flow heat exchanger with no moving parts, an insulated single wall G90
galvanized 20-gauge steel cabinet, filter assemblies for both intake and exhaust air, en-
thalpy core, with all specified components and internal accessories factory installed and
tested. Entire unit with the exception of field-installed components shall be assembled and
test operated at the factory.
2.3 CABINET
A. Materials: Formed single wall insulated metal cabinet, fabricated to permit access to
internal components for maintenance.
B. Outside casing: 20 gauge, galvanized (G90) steel meeting ASTM A653 for compo-
nents that do not receive apainted finish.
C. Access doors shall be hinged with airtight closed cell foam gaskets. Door pressure
taps, with captive plugs, shall be provided for cross-core pressure measurement al-
lowing for accurate airflow measurement.
D. Unit shall have factory-installed duct flanges on all duct openings.
ERV shall have 2" thick [MERV 8][MERV 13] disposable pleated filters located in the out-
door air and exhaust airstreams. All filters shall be accessible from the exterior of the unit.
2PART 3 – EXECUTION
3.1 EXAMINATION
A. Prior to start of installation, examine area and conditions to verify correct location for
compliance with installation tolerances and other conditions affecting unit perfor-
mance. See unit IOM.
B. Examine roughing-in of plumbing, electrical and HVAC services to verify actual loca-
tion and compliance with unit requirements. See unit IOM.
C. Proceed with installation only after all unsatisfactory conditions have been cor-
rected.
3.2 INSTALLATION
3.3 CONNECTIONS
In all cases, industry Best Practices shall be incorporated. Connections are to be made sub-
ject to the installation requirements shown above.
Duct installation and connection requirements are specified in Division 23 of this document.
Contractor to inspect field assembled components and equipment installation. Report results
to Architect/Engineer in writing. Inspection must include a complete startup checklist to in-
clude (as a minimum) the following: Completed Start-Up Checklists as found in manufac-
turer’s IOM. Insert any other requirements here.
Contractor to perform startup service. Clean entire unit, comb coil fins as necessary, and in-
stall clean filters. Refer to Division 23 “Testing, Adjusting and Balancing” and comply with
provisions therein.
Contractor to train owner’s maintenance personnel to adjust, operate and maintain the entire
Make-Up Air unit. Refer to Division 01 Section Closeout Procedures and Demonstration and
Training.
END OF SECTION