Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

CBIM 2021 Form A-13

Bill of Quantities and Estimated Contract Cost

KALAHI-CIDSS NCDDP Additional Financing

RURAL INFRASTRUCTURE COMPONENT

BILL OF QUANTITIES AND ESTIMATED CONTRACT COST*

Name of proposed subproject:_________________________________________________________


Location :__________________________________________________________________________

Quantity Unit of Rate/ Estimated Estimated Total


Item No. Description Measure Unit Direct Cost Indirect Cost Cost
(1) (2) (3) (4) (5) (6) = (3) x (5) (7) (8) = (6) + (7)

 Total Contract Cost

*To be prepared in an MS Excel Spreadsheet

1
CBIM 2021 Form A-13
Bill of Quantities and Estimated Contract Cost

Prepared by: Reviewed and Checked by:

(Signature Over Printed Name) (Signature Over Printed Name)


MCT Technical Facilitator ACT Technical Facilitator

Noted by:

(Signature Over Printed Name)


Municipal Engineer

You might also like