WPS1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

A - PROCEED / ACCEPTED

B - PROCEED AS NOTED, CHANGE AS


NOTED AND RESUBMIT
NOTES TO CONTRACTOR:
(1) Notification to proceed or receipt of information does C - DO NOT PROCEED, CHANGE AS
not constitute acceptance nor relieve Contractor of any NOTED AND RESUBMIT
liability. Acceptance is accomplished under the terms of
the Contract/Purchase Order.
(2) Changes or additions to any document must be D - INFORMATION ONLY, RECEIPT
reflected in its revision block by an appropriated revision ACKNOWLEDGED
indication.
(3) If the data being resubmitted by the Employer’s
Representative supersedes previously submitted data, Q – QUALITY IS BELOW STANDARDS,
indication of the replaced document number must CORRECT AND RESUBMIT
appear in or near the revision block or on the
Transmittal.
Contractor Ref: NSH-MAADEN-WPF-WPS-1 DS ALLOY-P2B Rev: Date Received:
Doc Title: WELDING PROCEDURE SPECIFICATION - NSH-MAADEN-WPF-WPS-1 DS ALLOY-P2B 01 04-JUL-2013
Reviewed by: Employer Document No:
AW – PROCEED / WITH COMMENTS ®

MD-402-K023-IK-Q10-00014
Authorization to proceed does not relieve Contractor/Supplier of its
Date: responsibility or liability under the Contract and or Purchase Order. Revision 02
By Justin Tuinstra (Justin.Tuinstra@Fluor.com) on Aug 12, 2013
CWP:
Tungsten Electrode Size and Type:
should be N/A for SMAW - JT