SMARTFREN LTE ROLLOUT PROJECT

Quick SSV Report


Site Id : NPLB_1372

Technology : TDD

KPI SUMMARY

Test
Source
SN Test Target Achieved Pass/Fail
DL THROUGHPUT>5.0 Mbps
1 N/A 85.15% N/A DT Mobile
(%)
2 RSRP>-105.0 (%) N/A 99.65% N/A DT Mobile

3 SINR>3.0 (%) N/A 92.06% N/A DT Mobile


DL Peak Value (Single
4 N/A 58.87 Mbps N/A DT Mobile
Sample)
5 ERAB Drop Rate < 5% 2.04% PASS DT Mobile

6 Handover Success Rate > 95% 99.45% PASS DT Mobile

7 VoLTE Setup Success Rate >95% 100.0% PASS DT Mobile

8 VoLTE ERAB Drop Rate < 5% 3.0% PASS DT Mobile


Netvelocity DownLink Speed
9 >3 Mbps - N/A DT Mobile
Test
10 RRC Connection Success Rate >95% 100.0% PASS DT Mobile

Date : 2021-12-19
Atoll RSRP PLOT

Site Id:-NPLB_1372

Date : 2021-12-19
RSRP PLOT

Site Id:-NPLB_1372

Average RSRP : -85.89 dBm

Date : 2021-12-19
Site Id:-NPLB_1372

RSRP GRAPH
Mean Min Max count

-85.89 -108.27 -37.34 2277

From (dBm) To (dBm) Count PDF (%) CDF (%)


-40.0 -95.0 1873 82.260 82.260

-95.0 -105.0 396 17.390 99.650

-105.0 -110.0 8 0.350 100.000

-110.0 -120.0 0 0.000 100.000

-120.0 -140.0 0 0.000 100.000

Date : 2021-12-19
SINR PLOT

Site Id:-NPLB_1372

Average SINR : 11.0 dB

Date : 2021-12-19
Site Id:-NPLB_1372

SINR GRAPH
Mean Min Max count

11.0 -4.68 29.75 2279

From (dB) To (dB) Count PDF (%) CDF (%)


30.0 12.0 975 42.780 42.780

12.0 6.0 849 37.250 80.040

6.0 3.0 274 12.020 92.060

3.0 -3.0 177 7.770 99.820

-3.0 -20.0 4 0.180 100.000

Date : 2021-12-19
Downlink Throughput Plot

Site Id:-NPLB_1372

Average Throughput : 17.48 Mbps

Date : 2021-12-19
Site Id:-NPLB_1372

DL THROUGHPUT GRAPH
Mean Min Max count

17.48 0.16 58.87 2014

From (Mbps) To (Mbps) Count PDF (%) CDF (%)


100.0 20.0 708 35.150 35.150

20.0 10.0 751 37.290 72.440

10.0 5.0 256 12.710 85.150

5.0 3.0 67 3.330 88.480

3.0 0.0 232 11.520 100.000

Date : 2021-12-19
PCI Plot

Site Id:-NPLB_1372

Date : 2021-12-19
SMARTFREN LTE ROLLOUT PROJECT

CGI Plot Site Id:-NPLB_1372

Date : 2021-12-19
SMARTFREN LTE ROLLOUT PROJECT

Earfcn Plot Site Id:-NPLB_1372

Date : 2021-12-19
SMARTFREN LTE ROLLOUT PROJECT

Site Id:-NPLB_1372

EARFCN GRAPH

EARFCN CDF(%) Count PDF(%)


39194.0 13.479 308 13.479
39050.0 100.000 1977 86.521

Date : 2021-12-19
Site Id:-NPLB_1372

Sector 1 sector2 sector3

sector4

Date : 2021-12-19
Handover Analysis

Technology:-TDD Site Id:-NPLB_1372

Legend Event Name Count

Handover Initiate 182

Handover Failure 1

Handover Success 181

Date : 2021-12-19
RRC Information

Technology:-TDD Site Id:-NPLB_1372

RRC Request Success Rate : 100.0%

RRC Connection Attempt : 49

RRC Connection Connected : 49

Date : 2021-12-19
THANK YOU