Professional Documents
Culture Documents
CABACUNGAN ESTIMATES Lgu
CABACUNGAN ESTIMATES Lgu
BILL OF QUANTITIES
SUMMARY
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST
1 Design and General Requirements 1 lot 1,500,000.00 ₱ 1,500,000.00
2 Reconstruction of Rentable Stalls 1 lot 14,500,000.00 ₱ 14,500,000.00
3 Construction of Bagsakan 1 lot 4,000,000.00 ₱ 4,000,000.00
TOTAL COST ₱ 20,000,000.00
Recommending Approval:
Approved by: