Poor housekeeping was noted at the worksite, with unwanted materials concealing hazards. Workers were also observed erecting scaffolding together without an exclusion zone in place, which was unsafe. Disciplinary actions were recommended against supervisors for these issues, including a lack of adequate edge protection during lifting, to ensure exclusion zones and safety protocols are followed going forward.
Poor housekeeping was noted at the worksite, with unwanted materials concealing hazards. Workers were also observed erecting scaffolding together without an exclusion zone in place, which was unsafe. Disciplinary actions were recommended against supervisors for these issues, including a lack of adequate edge protection during lifting, to ensure exclusion zones and safety protocols are followed going forward.
Poor housekeeping was noted at the worksite, with unwanted materials concealing hazards. Workers were also observed erecting scaffolding together without an exclusion zone in place, which was unsafe. Disciplinary actions were recommended against supervisors for these issues, including a lack of adequate edge protection during lifting, to ensure exclusion zones and safety protocols are followed going forward.
Poor Housekeeping : Poor housekeeping could conceal hazards , Keep work
environment clean . Remove the unwanted materials with immediate effect. Very Unsafe Act/Unauthorized entry – Workforce were working/both working together Get rid-of the unwanted materials. while Scaffold erection is ongoing. Issue disciplinary action against the foreman/supervisor. (Evidence Required) No exclusion Zone : Still no improvement on lifting/Hoisting .Corden-off the area before commencing the lifting. Take disciplinary Missing adequate edge protection action against supervisor/engineer(evidence required ).