COMMISSIONING REPORT
Manufacturer: Address: ABB Tellhow generators Ltd. 3088 Zi Yang Avenue High-Tech Development Zone 330096 Nanchang Jiangxi, P.R.China +86 791 835 0800 +86 791 835 0814
Commissioning Report - 1
Comissioning report
1 Transportation
General: Arrival date of the machine: Inspection date and location: Signature of consignee: Open box inspection: Damages: Packing list: Machine: Package: Accessories: Spare parts + tools: Actions Taken in Response to Damages: Photographed: Reported to the transportation company: Reported to the supplier: Reported to the insurance company: Method of Transportation: Railway Other: Comments: Airfreight Truck Mail Shipped by M/S____________ no no no no yes, date: yes, to whom: yes, to whom: yes, to whom: date: date: date: no no no no no yes, missing items: yes, what kind of: yes, what kind of: yes, what kind of: yes, what kind of: no yes, done by
Commissioning Report - 2
Comissioning report
2 Storage
General: Storage: Storage Time Longer than 6 Months: Person Responsible for Storage: Storage Place: indoors in packing case outdoors protected by a waterproof cover Humidity:______% no no yes, begin:__________________ end: __________________ yes
Daily temperature: min/max. ______ - ______C Damages: Transportation package is ventilated: External heating/fan is used: Machine space heaters are used: Bearings are flushed: Shaft end anti-corrosion protection checked: Shaft end anti-corrosion protection renewed: The rotor is turned 10 revolutions every two months: There are vibrations in the storage place: There are corrosive gases in the air: Machine documents are saved and protected for future use: Comments: no no no no no no no no no no yes
yes, type:__________________________________________ yes, voltage: _______________________________________ yes, oil type: _______________________________________ yes, type:__________________________________________ yes, date: __________________________________________ yes yes, type:_________ mm/s, rms yes, what kind of:___________________________________ yes, location:_______________________________________
Commissioning Report - 3
Comissioning report
3 Mechanical Installation
Foundation is checked according to machine drawing: Possible foundation anchor bolts or sole plates are mounted according to instructions: For alignment of the coupling, use either values 1-4 or values A-D 1_____________ 2_____________ 3_____________ 4_____________ A_____________ B_____________ C_____________ D_____________ Crankshaft deflection is checked: Foundations bolts are tightened with torque wrench: Bolt lubrication: Transport locking device is removed: Rotor rotates without noise or scraping: no no dry no no yes yes, bolt size: ______________ torque: ______________Nm oil, yes yes MoS2 no no yes, drawing number:________________________________ yes Angular alignment of coupling top
D 4 C 3 1 A 2 B
Commissioning Report - 4
Comissioning report
4 Lubrication check
Grease: The grease quality is the same as recommended on the lubrication plate: The first greasing has been done: Comments: Manufacturer:_____________________ Type: _____________________ no yes
Date:_______________ Quantity:________ g
Commissioning Report - 5
Comissioning report
5 Electrical installation
Network variation: Space heater operation: no yes, voltage:______-______ V, frequency: ______-______Hz no manual automatic, controlled by:____________________
Commissioning Report - 6
Comissioning report
Commissioning Report - 7
Comissioning report
7 Test Run
7.1 First start (a few seconds only)
Direction of rotation (viewed from D-end): Are there abnormal noises? no CW yes, from: CCW
D-end:__________ mm/s, rms; N-end:_________ mm/s, rms machine run OK operation stops, why:
Checking schedule and information Time Bearing temperature Bearing vibration levels D-end h:min 0:00 0:05 0:10 0:15 0:20 Comments: C N-end C D-end mm/s rms N-end mm/s rms Current A
Observations:
Commissioning Report - 8
Comissioning report
no
yes, from:
__________ s.
Commissioning Report - 9
Synchronous Machine A M G / A M Z
jne.
9 Machine approval
Machine approved for use Commissioning done by: Approved by: Date:
Commissioning Report - 10
Comissioning report
Email:
Number of Pages: Message: 1 + 9 + _________