AIP C3100000175 CONM 14 Material Inspection Review Request Report
AIP C3100000175 CONM 14 Material Inspection Review Request Report
MIRR No : Punch List with IRN: Yes / No (attach a copy if available) (Note. 1)
Drawing Number
MIRR Date :
(Where applicable):
Quantity Accepted
Heat No / Material Test Qty Rejected Remarks
Sl No. Item Description / MESC / SAP UOM Signature
Lot No Certificate No. (Note: Qty (Note.3)
PO Qty Offered Qty
2,4 & 5)
Note. 1: Raise a COM to resolve all outstanding Punchlist items recorded on the Punchlist received with the IRN / Shipment.
Note. 2: Only specify the quantities that are accepted fully under this column. Any material found with non-complaint or with un-resolved issues or with missing supporting documents shall be considered as non-compliant and shall be subjected to COM by
submitting UOSD / SQ / Punchlist / NCR (refer note. 3 below).
Note. 3: Provide reference to UOSD / SQ / Punchlist / NCR numbers on this report, If any issued (AIP QA/QC Coast team to be consulted in case any clarification required).
Note 4: Other than Bulk items shall be inspected for Visual /Dimensions / design features /MTC review with reference to MTO/PEFS/ISO/GAD/DATA Sheets regardless of TPI/Majan inspections
Note 5: MIRR shall be completed within week days from receipt at site and raise COM, if any Non compliance.
Note 6: MIRR register/Log to be maintained for archive of MTC, in case of failures from manufacturers during projects execution.
AIP-C3100000175-CONM-14 Rev 2