MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO

Date: FEBRUARY 1 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.2 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I0 IAVE. SL1 SL2 SL3
8:00 AM 7.77 7.72 7.70 13.45 13.32 13.40 44.60 55.40 52.10 25.20 50.60 1.16 352.0 426.0 403.0 1.18 0.07
9:00 AM 7.83 7.78 7.77 13.56 13.43 13.53 42.40 52.60 48.30 24.50 47.70 1.09 328.0 409.0 370.0 1.11 0.05
10:00 AM 7.74 7.70 7.70 13.39 13.30 13.36 43.60 59.10 50.20 27.20 50.90 1.15 335.0 448.0 386.0 1.17 0.05
11:00 AM 7.68 7.65 7.65 13.31 13.23 13.28 45.40 59.10 55.6 24.20 53.30 1.21 347.0 446.0 420.0 1.21 0.06
12:00 PM 7.67 7.65 7.65 13.29 13.22 13.26 47.60 59.30 54.70 23.80 53.90 1.22 361.0 449.0 413.0 1.22 0.06
1:00 PM 7.72 7.70 7.68 13.38 13.3 13.33 43.50 55.00 53.00 24.30 50.40 1.14 340.0 423.0 407.0 1.17 0.05
2:00 PM 7.67 7.64 7.64 13.29 13.22 13.26 40.30 54.40 52.40 24.60 48.90 1.10 314.0 414.0 400.0 1.13 0.06
3:00 PM 7.71 7.68 7.67 13.36 13.27 13.32 43.20 56.60 52.60 23.80 50.70 1.15 335.0 432.0 399.0 1.17 0.07
4:00 PM 7.79 7.75 7.74 13.49 13.39 13.44 41.40 54.10 51.70 23.90 49.10 1.12 322.0 419.0 405.0 1.15 0.07
5:00 PM 7.78 7.74 7.73 13.47 13.37 13.43 4.00 53.50 47.70 24.90 48.40 1.10 339.0 412.0 368.0 1.12 0.05
6:00 PM 7.78 7.75 7.74 13.48 13.38 13.43 42.10 57.10 52.60 28.60 50.60 1.16 326.0 439.0 396.0 1.18 0.05
7:00 PM 7.74 7.71 7.70 13.40 13.31 13.36 52.00 62.10 58.90 34.90 57.60 1.30 398.0 476.0 446.0 1.32 0.04
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 2 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.3 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I1 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 3 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.4 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I2 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM NGCP
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 4 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.5 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I3 IAVE. SL1 SL2 SL3
8:00AM 7.80 7.76 7.74 13.52 13.39 13.46 42.40 55.20 50.70 23.70 49.40 1.12 324.0 421.0 395.0 1.14 0.06
9:00 AM 7.70 7.68 7.67 13.36 13.26 13.31 43.70 54.60 52.40 23.10 50.20 1.12 340.0 416.0 388.0 1.15 0.06
9:59 AM 7.69 7.67 7.67 13.32 13.27 13.30 46.20 57.10 56.30 23.00 53.20 1.21 359.0 426.0 431.0 1.22 0.09
11:00 AM 7.70 7.70 7.68 13.35 13.31 13.32 43.90 48.80 51.8 22.80 48.10 1.07 315.0 374.0 391.0 1.08 0.02
12:00 PM 7.71 7.69 7.68 13.35 13.28 13.32 47.90 56.20 54.60 23.40 52.80 1.21 364.0 428.0 419.0 1.20 0.08
12:59 PM 7.76 7.75 7.73 13.45 13.39 13.42 43.30 51.80 50.60 24.10 48.50 1.11 339.0 405.0 395.0 1.14 0.06
2:00 PM 7.73 7.71 7.69 13.39 13.32 13.35 42.90 47.40 49.60 22.70 46.30 1.05 342.0 364.0 382.0 1.09 0.07
3:00 PM 7.74 7.71 7.70 13.40 13.32 13.37 40.20 51.10 48.30 22.40 46.50 1.05 313.0 386.0 375.0 1.08 0.08
3:59 PM 7.80 7.79 7.76 13.53 13.45 13.47 40.90 47.60 50.70 22.00 46.30 1.04 314.0 374.0 389.0 1.08 0.06
5:00 PM 7.82 7.79 7.77 13.54 13.46 13.50 44.30 51.50 53.90 26.00 49.90 1.14 352.0 405.0 414.0 1.17 0.06
6:00 PM 7.73 7.71 7.69 13.39 13.31 13.34 52.60 61.10 63.20 34.70 58.90 1.33 406.0 470.0 484.0 1.36 0.05
6:59 PM
8:00 PM
9:00 PM
9:59 PM
11:00 PM
12:00 AM
12:59 AM
2:00 AM
3:00 AM
3:59 AM
5:00 AM
6:00 AM

6:59 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 5 MET

Page 1 Page 2 Page 3 Page 4 Page 5


date Voltage (kV) -7.62/13.6 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I4 IAVE. SL1 SL2 SL3
8:00 AM 7.87 7.81 7.79 13.62 13.47 13.57 43.651.7 51.70 52.80 23.80 49.50 1.13 346.0 409.0 412.0 1.17 0.04
9:00 AM 7.88 7.82 7.79 13.63 13.48 13.58 42.90 51.00 50.20 24.60 48.00 1.10 336.0 398.0 389.0 1.12 0.04
10:00 AM 7.82 7.77 7.74 13.51 13.38 13.48 43.60 52.10 51.00 24.90 48.80 1.12 333.0 400.0 388.0 1.12 0.04
11:00 AM 7.77 7.71 7.69 13.46 13.29 13.40 43.90 54.60 54.7 25.60 51.00 1.16 335.0 417.0 416.0 1.17 0.07
12:00 PM 7.80 7.73 7.71 13.49 13.33 13.43 44.00 52.80 53.90 24.70 50.20 1.15 347.0 405.0 420.0 1.17 0.07
1:00 PM 7.80 7.74 7.72 13.50 13.33 13.44 41.60 52.90 51.10 25.80 48.50 1.09 321.0 413.0 393.0 1.13 0.07
2:00 PM 7.79 7.72 7.72 13.47 13.31 13.43 41.60 51.40 49.40 25.60 47.40 1.07 319.0 402.0 381.0 1.10 0.07
3:00 PM 7.87 7.81 7.79 13.62 13.46 13.56 40.70 49.90 47.30 25.60 45.90 1.04 321.0 396.0 368.0 1.09 0.05
4:00 PM 7.86 7.80 7.77 13.62 13.44 13.54 42.80 53.90 50.60 28.70 49.10 1.12 338.0 421.0 398.0 1.16 0.05
5:00 PM 7.87 7.81 7.78 13.63 13.45 13.56 44.60 55.80 53.30 30.80 51.10 1.16 356.0 430.0 413.0 1.20 0.05
6:00 PM 7.87 7.81 7.79 13.63 13.46 13.56 48.10 59.10 55.50 34.90 54.10 1.23 382.0 463.0 427.0 1.27 0.05
7:00 PM
8:00 PM 7.85 7.80 7.76 13.60 13.43 13.52 51.00 54.40 58.20 36.20 54.60 1.24 403.0 421.0 448.0 1.27 0.05
9:00 PM 7.93 7.87 7.83 13.72 13.55 13.66 48.40 50.00 53.30 31.60 50.90 1.16 381.0 395.0 419.0 1.19 0.03
10:00 PM 7.94 7.88 7.85 13.74 13.57 13.69 45.10 46.10 48.70 26.90 46.60 1.07 356.0 363.0 378.0 1.10 0.01
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 6 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.7 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I5 IAVE. SL1 SL2 SL3
8:00 AM 7.74 7.68 7.66 13.40 13.23 13.33 43.20 55.90 52.90 26.80 50.60 1.14 331.0 427.0 405.0 1.16 0.04
9:00 AM 7.78 7.76 7.73 13.49 13.38 13.43 38.00 49.80 47.40 26.00 45.00 1.03 286.0 392.0 366.0 1.04 -0.04
10:00 AM 7.73 7.70 7.69 13.39 13.31 13.35 41.00 49.50 48.90 23.90 46.50 1.05 313.0 392.0 371.0 1.08 -0.03
11:00 AM 7.72 7.67 7.67 13.35 13.24 13.31 44.70 61.00 52.6 26.80 52.80 1.20 346.0 459.0 406.0 1.21 0.01
12:00 PM 7.78 7.75 7.74 13.48 13.39 13.43 40.30 56.50 51.70 26.90 49.50 1.13 314.0 435.0 396.0 1.15 0.00
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM 7.86 7.83 7.81 13.62 13.51 13.56 47.90 58.40 54.80 29.50 53.60 1.23 377.0 452.0 432.0 1.26 0.06
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM 7.96 7.89 7.86 13.76 13.59 13.72 43.70 46.80 45.70 22.30 45.40 1.06 349.0 367.0 360.0 1.08 -0.01
6:00 AM 7.95 7.89 7.87 13.74 13.60 13.71 47.20 48.40 48.90 24.10 48.10 1.12 370.0 382.0 384.0 1.14 -0.01
7:00 AM 7.90 7.83 7.81 13.67 13.50 13.61 44.40 51.30 52.90 22.80 49.50 1.14 352.0 399.0 416.0 1.17 0.02
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 7 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.8 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I6 IAVE. SL1 SL2 SL3
8:00 AM 7.85 7.79 7.77 13.59 13.42 13.53 44.30 52.40 50.90 23.70 49.10 1.13 349.0 413.0 395.0 1.16 0.06
9:00 AM 7.80 7.75 7.74 13.51 13.38 13.47 45.30 55.00 50.20 24.70 50.00 1.15 360.0 424.0 392.0 1.18 0.06
10:00 AM
11:00 AM 7.65 7.62 7.62 13.26 13.17 13.22 47.80 59.60 56.5 25.80 54.60 1.22 368.0 446.0 427.0 1.24 0.07
12:00 PM 7.76 7.74 7.72 13.45 13.37 13.40 45.70 54.80 55.80 25.40 52.10 1.18 353.0 414.0 434.0 1.20 0.05
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM 7.77 7.74 7.72 13.46 13.36 13.42 43.70 54.30 51.70 26.10 49.90 1.13 340.0 412.0 396.0 1.15 0.06
6:00 PM
7:00 PM 7.78 7.75 7.73 13.49 13.39 13.43 56.90 65.90 62.60 40.70 61.80 1.40 445.0 513.0 485.0 1.45 0.07
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 8 MET
Page 1 Page 2 Page 3 Page 4 Page 5
Time Voltage (kV) -7.62/13.9 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I7 IAVE. SL1 SL2 SL3
8:00 AM 7.89 7.84 7.82 13.66 13.52 13.62 42.70 53.00 49.50 24.10 48.40 1.11 343.0 413.0 385.0 1.14 0.04
9:00 AM 7.79 7.76 7.74 13.48 13.39 13.45 48.80 56.60 52.90 24.10 52.80 1.22 384.0 434.0 405.0 1.22 0.07
10:00 AM 7.67 7.66 7.65 13.29 13.24 13.27 49.80 59.90 53.50 25.20 54.30 1.22 386.0 458.0 407.0 1.25 0.08
11:00 AM 7.70 7.68 7.67 13.34 13.27 13.31 52.10 61.20 57.7 25.60 57.00 1.29 399.0 470.0 438.0 1.31 0.08
12:00 PM 7.75 7.73 7.70 13.44 13.35 13.39 47.30 59.90 55.50 25.40 54.10 1.22 372.0 459.0 427.0 1.26 0.07
1:00 PM 7.68 7.66 7.67 13.31 13.24 13.27 48.90 57.00 52.00 25.20 53.30 1.19 370.0 448.0 407.0 1.22 0.09
2:00 PM 7.73 7.72 7.70 13.40 13.33 13.37 48.10 56.60 54.10 24.70 52.90 1.20 371.0 442.0 419.0 1.23 0.07
3:00 PM 7.75 7.73 7.73 13.43 13.37 13.40 46.50 59.20 54.80 26.40 53.50 1.22 354.0 452.0 420.0 1.23 0.07
4:00 PM 7.77 7.75 7.75 13.45 13.41 13.45 46.20 53.90 51.10 27.20 50.30 1.15 363.0 419.0 395.0 1.18 0.07
5:00 PM 7.83 7.81 7.80 13.56 13.49 13.53 48.90 59.10 56.50 32.40 54.80 1.26 382.0 467.0 445.0 1.30 0.04
6:00 PM 7.80 7.77 7.76 13.51 13.41 13.48 55.10 63.00 61.00 37.70 59.60 1.34 432.0 490.0 474.0 1.40 0.05
7:00 PM 7.84 7.83 7.81 13.59 13.53 13.54 54.80 63.30 61.20 41.00 59.70 1.36 431.0 492.0 477.0 1.40 0.05
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel


SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 9 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.10 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I8 IAVE. SL1 SL2 SL3
8:00 AM 7.82 7.78 7.75 13.55 13.41 13.80 44.60 52.60 50.60 23.70 49.20 1.13 342.0 409.0 392.0 1.14 0.05
9:00 AM 7.74 7.71 7.71 13.42 13.33 13.38 44.30 57.70 51.70 25.40 51.10 1.17 336.0 442.0 398.0 1.18 0.08
10:00 AM 7.65 7.63 7.62 13.26 13.18 13.23 47.40 57.60 52.40 23.90 52.40 1.20 357.0 430.0 398.0 1.22 0.07
11:00 AM 7.67 7.65 7.62 13.29 13.20 13.23 48.30 59.20 58.4 25.20 55.20 1.24 382.0 448.0 441.0 1.27 0.09
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM 7.71 7.68 7.69 13.35 13.30 13.34 51.30 61.50 58.10 33.20 56.90 1.28 396.0 473.0 444.0 1.31 0.06
7:00 PM 7.73 7.69 7.69 13.38 13.29 13.35 56.90 65.90 62.30 41.20 61.70 1.38 438.0 505.0 473.0 1.42 0.05
8:00 PM 7.75 7.73 7.71 13.42 13.35 13.38 54.40 57.70 59.50 39.10 57.10 1.29 405.0 428.0 442.0 1.32 0.05
9:00 PM 7.90 7.87 7.84 13.68 13.57 13.63 50.60 53.60 56.10 34.90 53.30 1.22 384.0 407.0 423.0 1.25 0.03
10:00 PM
11:00 PM
12:00 AM 7.96 7.90 7.87 13.76 13.61 13.71 44.60 45.50 45.40 22.30 45.10 1.05 390.0 468.0 442.0 1.06 0.01
1:00 AM 7.93 7.86 7.84 13.71 13.55 13.67 41.30 43.50 43.30 20.40 42.70 0.99 328.0 340.0 339.0 1.01 0.00
2:00 AM
3:00 AM
4:00 AM
5:00 AM 7.89 7.83 7.80 7.65 13.65 13.60 40.90 43.30 44.80 20.60 42.90 1.01 325.0 346.0 354.0 1.03 -0.01
6:00 AM 7.81 7.74 7.71 13.50 13.33 13.45 45.90 46.50 48.40 23.70 46.90 1.07 357.0 354.0 372.0 1.09 -0.01
7:00 AM 7.83 7.79 7.75 13.57 13.43 13.50 46.30 48.80 52.10 22.80 49.10 1.13 363.0 382.0 402.0 1.15 0.01
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 10

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.11 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I9 IAVE. SL1 SL2 SL3
8:00 AM 7.83 7.81 7.78 13.58 13.46 13.52 45.10 54.80 50.40 23.00 50.00 1.16 346.0 437.0 391.0 1.17 0.07
9:00 AM 7.74 7.70 7.72 13.40 13.34 13.37 41.20 50.60 49.40 22.30 47.00 1.08 318.0 396.0 375.0 1.09 0.01
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM 7.71 7.68 7.66 13.35 13.26 13.31 50.00 58.50 58.10 23.50 55.50 1.26 378.0 451.0 441.0 1.27 0.11
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 11 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.12 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I10 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 12 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.13 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I11 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 13 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.14 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I12 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 14 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.15 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I13 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 15 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.16 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
Time
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I14 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 16 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Volta+B531:G532ge (kV) -7.62/13.17 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I15 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:


Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 17 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.18 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I16 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 18 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.19 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I17 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 19 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.20 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I18 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 20 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.21 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I19 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 21 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.22 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I20 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 22 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.23 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I21 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 23 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time
Time Voltage (kV) -7.62/13.24 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I22 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

TO
MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO
Date: FEBRUARY 24 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.25 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I23 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:


Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 25 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.26 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I24 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 26 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.27 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I25 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 27 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.28 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I26 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 28 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.29 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I27 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 29 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.30 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I28 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 30 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.31 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I29 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) TO


Date: FEBRUARY 31 MET
Page 1 Page 2 Page 3 Page 4 Page 5
Time Voltage (kV) -7.62/13.32 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I30 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER


TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.981 74.02
0.980 74.00
0.981 74.00
0.986 74.00
0.985 74.00
0.981 74.00
0.983 74.00
0.983 74.01
0.983 74.01
0.981 74.01
0.979 74.01
0.973 74.01
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.983 74.08
0.981 74.08
0.984 74.08
0.981 74.08
0.982 74.08
0.977 74.08
0.977 74.08
0.981 74.09
0.978 74.09
0.978 74.09
0.974 74.09
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
0.981 74.10
0.980 74.11
0.980 74.11
0.984 74.11
0.979 74.11
0.977 74.11
0.979 74.11
0.977 74.11
0.973 74.11
0.971 74.11
0.969 74.12

0.968 74.12
0.970 74.12
0.973 74.12

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
0.981 74.13
0.974 74.13
0.978 74.13
0.985 74.13
0.981 74.13

0.977 74.14

0.980 74.15
0.979 74.15
0.982 74.16
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.982 74.16
0.981 74.16

0.983 74.16
0.980 74.16

0.980 74.17

0.970 74.17

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE
Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
0.983 74.18
0.984 74.18
0.984 74.19
0.984 74.19
0.982 74.19
0.983 74.19
0.983 74.19
0.982 74.19
0.977 74.19
0.975 74.19
0.971 74.20
0.968 74.20

Noted By:

Engr. Von Erwin G. Azagra


OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.980 74.21
0.982 74.21
0.982 74.21
0.983 74.21

0.977 74.22
0.969 74.22
0.966 74.22
0.967 74.22

0.980 74.23
0.979 74.23

0.981 74.23
0.978 74.23
0.984 74.23
Noted By:

Engr. Von Erwin G. Azagra

GENERAL MANAGER

TOTALIZER
.

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.981 74.24
0.983 74.24

0.983 74.24
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Energy Remarks
∑Power
Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t

Noted By:
Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Remarks
∑Power Energy Remarks
Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t

Noted By:
Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

TOTALIZER
METERING DEVICE
Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER


MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL
Date: FEBRUARY 1 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.2 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I0 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 2 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.3 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I1 IAVE. SL1 SL2 SL3
8:00 AM 7.77 7.72 7.70 13.45 13.32 13.41 31.80 29.10 37.70 15.90 32.80 761.00 249.0 225.0 295.0 769.00 22.00
9:00 AM 7.82 7.77 7.76 13.53 13.41 13.50 29.40 29.50 33.70 14.60 30.80 721.00 232.0 238.0 263.0 733.00 21.00
10:00 AM 7.74 7.69 7.69 13.39 13.29 13.37 30.80 31.50 35.80 14.70 32.70 733.00 232.0 240.0 268.0 740.00 14.00
11:00 AM 7.69 7.66 7.65 13.32 13.23 13.28 33.60 33.70 39.3 14.20 35.50 825.00 263.0 287.0 305.0 835.00 28.00
12:00 PM 7.66 7.64 7.64 13.27 13.21 13.25 31.20 33.50 38.00 13.80 35.20 799.00 360.0 257.0 296.0 814.00 28.00
1:00 PM 7.72 7.70 7.69 13.38 13.31 13.34 31.20 32.20 38.60 15.40 34.00 768.00 241.0 243.0 291.0 775.00 25.00
2:00 PM 7.67 7.65 7.64 13.29 13.22 13.25 30.70 32.80 37.20 15.10 33.50 741.00 235.0 243.0 277.0 755.00 23.00
3:00 PM 7.71 7.67 7.67 13.35 13.26 13.31 31.70 33.10 38.60 14.40 34.40 793.00 242.0 262.0 298.0 802.00 37.00
4:00 PM 7.79 7.76 7.74 13.49 13.39 13.45 29.80 30.90 37.10 15.00 32.60 756.00 232.0 240.0 287.0 758.00 31.00
5:00 PM 7.78 7.75 7.73 13.47 13.38 13.43 32.00 29.70 34.60 13.80 32.10 736.00 243.0 229.0 273.0 746.00 25.00
6:00 PM 7.78 7.75 7.73 13.47 13.38 13.42 30.40 30.20 34.90 15.90 31.90 724.00 235.0 228.0 270.0 734.00 18.00
7:00 PM 7.74 7.71 7.69 13.41 13.31 13.36 35.30 31.70 39.80 20.40 35.60 807.00 268.0 239.0 301.0 808.00 24.00
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 3 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.4 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I2 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM NGCP
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 4 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.5 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I3 IAVE. SL1 SL2 SL3
8:00 AM 7.80 7.75 7.74 13.50 13.38 13.46 29.30 27.70 34.70 14.50 30.60 701.00 227.0 213.0 262.0 702.00 23.00
9:00 AM 7.73 7.69 7.68 13.38 13.28 13.35 30.80 28.10 35.40 14.60 31.40 713.00 242.0 208.0 270.0 720.00 31.00
9:59 AM 7.70 7.68 7.67 13.34 13.28 13.31 31.20 30.10 37.40 14.00 32.90 753.00 249.0 225.0 284.0 758.00 48.00
11:00 AM 7.71 7.70 7.68 13.36 13.30 13.33 25.10 24.30 33.4 15.40 27.60 620.00 196.0 190.0 251.0 638.00 -43.00
12:00 PM 7.71 7.69 7.67 13.35 13.28 13.32 31.30 31.20 38.40 14.90 33.60 769.00 247.0 240.0 299.0 786.00 53.00
12:59 PM 7.77 7.78 7.74 13.45 13.39 13.43 28.40 30.50 34.70 14.40 31.20 713.00 224.0 235.0 266.0 725.00 42.00
2:00 PM 7.72 7.71 7.69 13.38 13.33 13.35 30.30 29.30 34.40 14.10 31.30 723.00 231.0 226.0 258.0 715.00 42.00
3:00 PM 7.76 7.73 7.71 13.44 13.36 13.39 26.70 29.50 33.90 13.80 30.00 686.00 207.0 227.0 261.0 695.00 41.00
3:59 PM 7.81 7.79 7.76 13.53 13.46 13.47 26.10 27.50 34.40 14.90 29.30 687.00 204.0 216.0 26.0 689.00 27.00
5:00 PM 7.83 7.80 7.78 13.55 13.47 13.51 28.40 28.50 35.40 16.80 30.80 705.00 223.0 230.0 275.0 728.00 23.00
6:00 PM 7.71 7.72 7.68 7.68 13.31 13.33 33.10 31.30 40.80 21.10 35.10 792.00 256.0 241.0 314.0 811.00 17.00
6:59 PM
8:00 PM
9:00 PM
9:59 PM
11:00 PM
12:00 AM
12:59 AM
2:00 AM
3:00 AM
3:59 AM
5:00 AM
6:00 AM

6:59 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 5 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.6 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I4 IAVE. SL1 SL2 SL3
8:00 AM 7.86 7.81 7.78 13.60 13.45 13.54 29.30 26.70 35.40 15.40 30.60 705.00 228.0 209.0 276.0 714.00 21.00
9:00 AM 7.87 7.83 7.79 13.63 13.48 13.57 26.90 28.10 32.90 15.40 29.30 670.00 216.0 226.0 260.0 702.00 16.00
10:00 AM 7.83 7.77 7.74 13.54 13.39 13.49 29.50 29.20 33.10 14.40 30.60 697.00 229.0 220.0 257.0 707.00 16.00
11:00 AM 7.78 7.72 7.69 13.46 13.31 13.40 28.30 29.20 36.3 15.60 31.30 717.00 221.0 227.0 281.0 729.00 26.00
12:00 PM 7.80 7.74 7.71 13.49 13.34 13.44 28.90 28.90 35.80 15.40 31.20 731.00 231.0 226.0 279.0 736.00 29.00
1:00 PM 7.80 7.74 7.72 13.50 13.34 13.44 27.20 30.20 33.90 15.50 30.40 701.00 210.0 232.0 263.0 706.00 29.00
2:00 PM 7.79 7.72 7.70 13.47 13.31 13.42 27.40 30.60 32.90 15.20 30.30 700.00 213.0 236.0 254.0 703.00 29.00
3:00 PM 7.87 7.81 7.78 13.62 13.45 13.55 26.30 28.10 32.50 15.30 29.00 662.00 206.0 219.0 249.0 676.00 18.00
4:00 PM 7.88 7.82 7.78 13.65 13.47 13.57 28.50 28.00 32.70 16.50 29.70 681.00 226.0 217.0 251.0 694.00 17.00
5:00 PM 7.88 7.81 7.78 13.63 13.46 13.57 30.10 29.70 35.40 18.50 31.70 730.00 238.0 233.0 277.0 748.00 20.00
6:00 PM 7.86 7.80 7.76 13.61 13.42 13.53 31.90 30.40 36.30 19.80 32.80 745.00 250.0 236.0 281.0 768.00 14.00
7:00 PM
8:00 PM 7.85 7.80 7.75 13.59 13.42 13.51 33.60 30.00 38.90 21.90 34.10 771.00 264.0 232.0 299.0 796.00 22.00
9:00 PM 7.92 7.86 7.83 13.71 13.55 13.65 31.40 27.20 36.40 20.00 31.70 736.00 249.0 213.0 283.0 746.00 10.00
10:00 PM 7.95 7.88 7.85 13.74 13.58 13.69 29.90 26.70 33.10 16.40 29.90 684.00 236.0 204.0 260.0 701.00 0.00
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 6 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.7 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I5 IAVE. SL1 SL2 SL3
8:00 AM 7.74 7.67 7.64 13.39 13.21 13.32 30.70 31.50 35.90 15.50 32.70 747.00 237.0 239.0 273.0 745.00 17.00
9:00 AM 7.78 7.75 7.73 13.48 13.37 13.42 25.00 26.20 30.90 15.30 27.40 618.00 192.0 216.0 239.0 647.00 -53.00
10:00 AM 7.73 7.71 7.69 13.40 13.32 13.35 26.40 26.70 31.80 15.00 28.30 636.00 206.0 201.0 248.0 656.00 -61.00
11:00 AM 7.70 7.67 7.65 13.34 13.23 13.29 29.70 31.50 36.9 15.30 32.70 739.00 231.0 240.0 287.0 759.00 -50.00
12:00 PM 7.79 7.75 7.73 13.49 13.38 13.44 27.30 27.90 35.00 16.60 30.00 682.00 213.0 217.0 269.0 700.00 -54.00
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM 7.86 7.83 7.81 13.62 13.52 13.57 32.40 1.40 37.50 17.80 33.80 778.00 254.0 246.0 288.0 789.00 23.00
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM 7.96 7.90 7.86 13..77 13.60 13.72 30.10 24.00 32.20 14.00 28.80 674.00 242.0 196.0 257.0 694.00 -14.00
6:00 AM 7.95 7.90 7.87 13.76 13.63 13.71 33.60 25.80 33.40 15.20 30.90 721.00 265.0 201.0 267.0 733.00 -6.00
7:00 AM 7.90 7.84 7.80 13.67 13.50 13.60 32.50 26.00 30.00 15.30 30.00 712.00 234.0 212.0 283.0 730.00 -2.00
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 7 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.8 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I6 IAVE. SL1 SL2 SL3
8:00 AM 7.85 7.79 7.76 13.59 13.42 13.53 31.40 28.70 34.90 14.90 31.70 726.00 245.0 226.0 272.0 743.00 24.00
9:00 AM 7.81 7.76 7.74 13.51 13.39 13.48 32.90 32.30 35.40 14.30 33.50 775.00 257.0 248.0 278.0 784.00 22.00
10:00 AM
11:00 AM 7.65 7.63 7.62 13.26 13.18 13.22 34.00 33.90 38.8 15.80 35.50 811.00 261.0 255.0 298.0 814.00 23.00
12:00 PM 7.76 7.73 7.71 13.43 13.35 13.39 31.80 30.30 38.50 17.40 33.50 763.00 245.0 232.0 297.0 775.00 14.00
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM 7.77 7.74 7.72 13.46 13.36 13.41 33.60 31.60 35.50 14.20 33.60 753.00 242.0 240.0 270.0 753.00 28.00
6:00 PM
7:00 PM 7.78 7.75 7.73 13.49 13.38 13.43 38.50 33.80 41.80 23.50 38.00 863.00 299.0 263.0 321.0 884.00 25.00
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 8 MET
Page 1 Page 2 Page 3 Page 4 Page 5
Time Voltage (kV) -7.62/13.9 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I7 IAVE. SL1 SL2 SL3
8:00 AM 7.89 7.84 7.81 13.67 1353.00 13.60 31.20 27.60 34.50 15.50 31.10 718.00 244.0 214.0 267.0 725.00 7.00
9:00 AM 7.78 7.75 7.73 1.47 13.38 13.44 36.30 30.70 37.00 15.50 34.70 792.00 276.0 29.0 284.0 788.00 25.00
10:00 AM 7.69 7.67 7.66 13.32 13.26 13.30 35.50 35.00 38.90 14.00 36.50 824.00 278.0 264.0 294.0 836.00 29.00
11:00 AM 7.70 7.68 7.66 13.35 13.27 13.30 36.50 36.50 40.7 14.80 37.90 848.00 286.0 282.0 308.0 877.00 31.00
12:00 PM 7.76 7.73 7.71 13.44 13.35 13.39 33.70 34.50 38.60 14.70 35.60 821.00 262.0 267.0 300.0 829.00 29.00
1:00 PM 7.68 7.66 7.65 13.31 13.24 13.27 34.70 33.70 37.40 14.00 35.20 816.00 269.0 257.0 285.0 811.00 39.00
2:00 PM 7.73 7.71 7.70 13.39 13.33 13.36 34.60 32.20 37.60 15.10 34.80 800.00 269.0 252.0 291.0 812.00 30.00
3:00 PM 7.75 7.73 7.73 13.43 13.37 13.41 34.80 32.40 37.90 15.10 35.00 792.00 261.0 251.0 291.0 804.00 30.00
4:00 PM 7.77 7.76 7.75 13.46 13.41 13.44 33.00 29.40 35.30 15.40 32.50 733.00 250.0 224.0 271.0 746.00 33.00
5:00 PM 7.83 7.82 7.80 13.58 13.50 13.53 33.40 30.00 37.70 19.30 33.70 782.00 262.0 236.0 292.0 791.00 12.00
6:00 PM 7.79 7.77 7.75 13.50 13.43 13.47 37.30 31.10 42.20 23.30 36.80 837.00 286.0 238.0 325.0 849.00 12.00
7:00 PM 7.83 7.82 7.79 13.57 13.50 13.52 37.20 31.10 42.00 24.50 36.70 834.00 288.0 241.0 326.0 855.00 14.00
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel


SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 9 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.10 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I8 IAVE. SL1 SL2 SL3
8:00 AM 7.83 7.78 7.75 13.55 13.41 13.50 32.00 28.50 35.60 15.30 32.00 739.00 250.0 223.0 277.0 750.00 19.00
9:00 AM 7.74 7.71 7.70 13.42 13.32 13.37 31.90 31.40 36.80 14.80 33.40 752.00 247.0 240.0 283.0 770.00 29.00
10:00 AM 7.67 7.65 7.64 13.29 13.22 13.26 356.00 32.80 37.80 13.60 35.40 806.00 266.0 252.0 294.0 812.00 31.00
11:00 AM 7.65 7.62 7.60 13.24 13.16 13.20 36.20 33.00 40.9 15.90 36.70 823.00 274.0 251.0 313.0 838.00 37.00
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM 7.71 7.69 7.69 13.35 13.30 13.34 35.30 33.70 38.20 18.90 35.80 822.00 273.0 263.0 298.0 834.00 26.00
7:00 PM 7.73 7.70 7.68 13.38 13.29 13.34 36.90 32.50 40.40 23.70 36.60 829.00 286.0 251.0 318.0 856.00 24.00
8:00 PM 7.74 7.73 7.69 13.41 13.34 13.36 36.20 31.10 40.20 23.50 35.80 806.00 279.0 240.0 307.0 827.00 21.00
9:00 PM 7.89 7.85 7.82 13.66 13.54 13.60 33.80 29.20 38.80 21.70 33.90 778.00 270.0 228.0 303.0 801.00 16.00
10:00 PM
11:00 PM
12:00 AM 7.96 7.90 7.87 13.77 13.61 13.73 31.00 25.70 31.60 13.70 29.40 695.00 248.0 206.0 250.0 705.00 1.00
1:00 AM 7.93 7.85 7.83 13.70 13.53 13.66 29.20 25.40 30.60 12.70 28.40 654.00 227.0 196.0 238.0 661.00 -1.00
2:00 AM
3:00 AM
4:00 AM
5:00 AM 7.89 7.83 7.80 13.65 13.49 13.60 29.00 24.70 31.40 13.30 28.40 660.00 229.0 193.0 245.0 667.00 -13.00
6:00 AM 7.79 7.73 7.70 13.47 13.33 13.43 31.30 24.60 32.80 15.80 29.60 677.00 242.0 190.0 252.0 684.00 -9.00
7:00 AM 7.84 7.80 7.76 13.58 13.44 13.51 30.30 26.70 36.50 16.50 31.20 725.00 239.0 207.0 291.0 737.00 3.00
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 10 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.11 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I9 IAVE. SL1 SL2 SL3
8:00 AM 7.85 7.82 7.79 13.60 13.48 13.55 31.60 30.40 35.10 13.50 32.40 735.00 253.0 229.0 265.0 747.00 30.00
9:00 AM 7.75 7.72 7.71 13.42 13.34 13.38 28.60 29.00 34.40 14.30 30.60 685.00 219.0 221.0 256.0 697.00 -33.00
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM 7.71 7.68 7.66 13.35 13.27 13.30 36.50 36.10 41.90 14.70 38.20 876.00 280.0 280.0 318.0 879.00 54.00
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 11 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.12 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I10 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 12 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.13 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I11 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 13 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.14 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I12 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 14 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.15 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I13 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 15 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.16 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
Time
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I14 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 16 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Volta+B531:G532ge (kV) -7.62/13.17 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I15 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:


Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 17 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.18 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I16 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 18 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.19 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I17 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 19 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.20 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I18 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 20 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.21 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I19 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 21 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.22 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I20 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 22 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.23 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I21 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 23 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time
Time Voltage (kV) -7.62/13.24 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I22 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

REAL
MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL
Date: FEBRUARY 24 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.25 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I23 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:


Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 25 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.26 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I24 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 26 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.27 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I25 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 27 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.28 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I26 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 28 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.29 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I27 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 29 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.30 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I28 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 30 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.31 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I29 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) REAL


Date: FEBRUARY 31 MET
Page 1 Page 2 Page 3 Page 4 Page 5
Time Voltage (kV) -7.62/13.32 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I30 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER


REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
0.986 52.26
0.983 52.24
0.986 52.24
0.989 52.24
0.988 52.24
0.986 52.24
0.986 52.25
0.988 52.25
0.986 52.25
0.985 52.25
0.983 52.25
0.978 52.25
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.986 52.29
0.986 52.29
0.986 52.30
0.980 52.30
0.986 52.30
0.984 52.30
0.984 52.30
0.987 52.30
0.984 52.30
0.982 52.30
0.979 52.30
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
0.986 52.31
0.982 52.31
0.984 52.31
0.985 52.31
0.984 52.31
0.983 52.31
0.983 52.31
0.982 52.31
0.978 52.32
0.978 52.32
0.974 52.32

0.975 52.32
0.977 52.32
0.980 52.32
977.000

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
0.985 52.33
0.975 52.33
0.977 52.33
0.985 52.33
0.978 52.33

0.981 52.33

0.987 52.34
0.986 52.34
0.985 52.34
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.985 52.34
0.987 52.34

0.987 52.35
0.985 52.35

0.985 52.35

0.976 52.35

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE
Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
0.985 52.36
0.939 52.36
0.990 52.36
0.989 52.36
0.989 52.36
0.988 52.36
0.988 52.37
0.987 52.37
0.983 52.37
0.980 52.37
0.978 52.37
0.975 52.37

Noted By:

Engr. Von Erwin G. Azagra


OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.987 52.38
0.987 52.38
0.989 52.38
0.989 52.38

0.980 52.38
0.973 52.39
0.974 52.39
0.976 52.39

0.987 52.39
0.987 52.39

0.987 52.39
0.984 52.39
0.987 52.39
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.987 52.39
0.986 52.40

0.990 52.40
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Energy Remarks
∑Power
Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t

Noted By:
Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Remarks
∑Power Energy Remarks
Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t

Noted By:
Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

REAL FEEDER
METERING DEVICE
Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER


MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC
Date: FEBRUARY 1 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.2 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I0 IAVE. SL1 SL2 SL3
8:00 AM 7.77 7.72 7.71 13.45 13.32 13.41 11.83 23.26 13.54 14.05 16.20 368.00 94.5 180.8 101.0 377.00 -5.00
9:00 AM 7.83 7.79 7.77 13.56 13.44 13.52 11.57 22.27 12.34 14.59 15.38 333.00 86.1 174.4 93.1 354.00 -9.00
10:00 AM 7.74 7.70 7.71 13.40 13.30 13.39 11.59 23.33 13.31 14.41 16.06 355.00 90.7 185.5 100.3 377.00 -8.00
11:00 AM 7.70 7.66 7.66 13.34 13.24 13.29 9.91 23.96 14.17 13.89 16.01 352.00 77.6 174.0 109.9 362.00 -2.00
12:00 PM 7.66 7.63 7.61 13.23 13.21 13.26 11.64 23.16 13.30 13.01 16.05 364.00 91.6 177.0 102.5 371.00 -13.00
1:00 PM 7.72 7.70 7.69 1.38 13.31 13.34 10.13 21.87 13.07 13.01 15.02 337.00 77.6 172.1 99.2 349.00 14.00
2:00 PM 7.66 7.64 7.62 13.28 13.19 13.23 10.07 22.27 12.92 13.01 15.07 334.00 74.1 165.8 97.0 338.00 -10.00
3:00 PM 7.71 7.68 7.68 13.36 13.27 13.33 11.52 21.23 12.34 12.80 15.02 338.00 83.9 162.9 96.4 343.00 -7.00
4:00 PM 7.79 7.75 7.75 13.49 13.39 13.45 10.63 21.33 13.02 12.65 14.99 334.00 87.4 167.2 99.9 355.00 -13.00
5:00 PM 7.78 7.74 7.75 13.42 13.38 13.44 11.48 22.01 11.95 14.53 15.14 333.00 87.2 166.5 92.8 347.00 -22.00
6:00 PM 7.78 7.75 7.75 13.49 13.40 13.45 11.13 22.55 15.72 15.30 17.47 392.00 86.0 199.8 123.5 409.00 -23.00
7:00 PM 7.74 7.72 7.70 13.42 13.33 13.37 14.73 29.21 16.41 18.89 20.11 444.00 114.7 226.0 123.3 464.00 -24.00
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 2 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.3 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I1 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 3 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.4 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I2 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM NGCP
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 4 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.5 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I3 IAVE. SL1 SL2 SL3
8:00 AM 7.80 7.76 7.74 13.51 13.39 13.46 11.14 26.11 14.32 15.18 17.29 391.00 94.2 100.2 113.4 402.00 -12.00
9:00 AM 7.74 7.70 7.69 13.39 13.30 13.37 11.16 24.40 14.71 13.65 16.75 379.00 88.9 192.2 112.1 394.00 -16.00
9:59 AM 7.70 7.68 7.68 13.34 13.29 13.32 11.90 23.00 14.56 13.00 16.99 396.00 99.2 182.1 128.3 410.00 -14.00
11:00 AM 7.71 7.70 7.69 13.36 13.31 13.34 14.56 22.90 16.44 11.81 17.96 400.00 108.3 174.0 127.3 410.00 -15.00
12:00 PM 7.71 7.69 7.67 13.35 13.29 13.32 14.36 22.61 14.49 12.68 17.14 386.00 115.8 180.5 115.3 412.00 -13.00
12:59 PM 7.77 7.75 7.74 13.46 13.4 13.44 12.85 20.05 13.45 12.05 15.45 349.00 99.6 158.5 108.1 366.00 -20.00
2:00 PM 7.72 7.70 7.69 13.37 13.32 13.35 12.49 16.83 14.18 9.78 14.49 315.00 91.9 129.2 108.3 330.00 -13.00
3:00 PM 7.75 7.73 7.71 13.43 13.35 13.38 9.72 18.59 13.19 0.52 13.83 302.00 77.8 137.6 101.7 317.00 -43.00
3:59 PM 7.81 7.79 7.77 13.53 13.45 13.48 10.31 17.86 13.95 9.09 14.03 312.00 80.0 136.9 106.6 323.00 -40.00
5:00 PM 7.80 7.80 7.78 13.56 13.48 13.51 11.64 21.72 15.82 11.01 16.39 367.00 90.7 166.7 121.4 379.00 -38.00
6:00 PM 7.73 7.70 7.69 13.39 13.32 13.35 15.24 26.63 19.50 14.99 20.60 450.00 118.8 206.5 153.3 479.00 -38.00
6:59 PM
8:00 PM
9:00 PM
9:59 PM
11:00 PM
12:00 AM
12:59 AM
2:00 AM
3:00 AM
3:59 AM
5:00 AM
6:00 AM

6:59 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 5 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.6 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I4 IAVE. SL1 SL2 SL3
8:00 AM 7.86 7.80 7.79 13.60 13.46 13.55 11.23 23.82 15.90 12.53 17.06 386.00 88.6 187.3 125.6 402.00 -37.00
9:00 AM 7.88 7.83 7.81 13.64 13.50 13.60 12.49 21.65 14.97 11.06 16.37 366.00 98.5 171.8 114.2 385.00 -31.00
10:00 AM 7.83 7.77 7.75 13.53 13.39 13.51 12.10 22.69 15.33 11.84 16.62 375.00 92.4 173.0 122.8 389.00 -34.00
11:00 AM 7.78 7.72 7.70 13.43 13.31 13.41 11.96 22.28 16.29 11.66 16.83 375.00 91.4 170.7 121.9 384.00 -29.00
12:00 PM 7.81 7.75 7.73 13.52 13.36 13.46 11.98 21.36 17.26 10.82 16.87 372.00 92.6 162.9 30.6 386.00 -31.00
1:00 PM 7.80 7.73 7.72 13.49 13.33 13.44 11.52 19.94 13.69 11.13 15.04 334.00 87.7 152.1 106.6 347.00 -29.00
2:00 PM 7.79 7.72 7.71 13.48 13.32 13.43 11.52 18.88 14.17 10.82 14.85 330.00 85.8 146.1 107.2 339.00 -29.00
3:00 PM 7.87 7.81 7.75 13.62 13.46 13.56 10.24 19.50 13.28 11.23 14.34 324.00 83.5 155.0 103.1 342.00 -28.00
4:00 PM 7.89 7.82 7.80 13.47 13.47 13.56 11.23 24.30 16.30 13.55 17.24 389.00 90.5 190.6 125.7 407.00 -28.00
5:00 PM 7.88 11.66 24.15 15.94 14.12 17.24 11.79 23.65 15.98 13.88 17.14 384.00 91.2 184.2 126.1 402.00 -41.00
6:00 PM 7.86 7.80 7.77 13.62 13.43 13.54 12.92 26.93 16.06 16.90 18.63 416.00 101.5 209.6 126.9 439.00 -35.00
7:00 PM
8:00 PM 7.85 7.79 7.75 13.58 13.41 13.52 13.83 22.90 17.02 14.89 17.91 394.00 109.9 176.8 132.4 419.00 -38.00
9:00 PM 7.92 7.85 7.82 13.69 13.52 13.64 12.32 20.87 15.12 13.02 16.10 357.00 97.5 163.8 118.9 380.00 -42.00
10:00 PM 7.94 7.88 7.84 13.74 13.58 13.68 11.50 18.70 13.52 11.57 14.56 319.00 91.2 146.0 105.9 343.00 -47.00
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 6 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.7 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I5 IAVE. SL1 SL2 SL3
8:00 AM 7.72 7.66 7.64 1336.00 13.20 13.29 10.37 22.25 14.70 12.80 15.77 346.00 80.4 169.9 109.2 360.00 -31.00
9:00 AM 7.77 7.74 7.74 13.46 13.38 13.43 12.37 21.91 13.55 14.08 15.94 350.00 84.4 168.6 105.0 366.00 -32.00
10:00 AM 7.73 7.71 7.69 13.40 13.32 13.35 9.91 21.70 16.53 11.18 16.05 363.00 76.9 167.4 1289.0 374.00 -29.00
11:00 AM 7.70 7.67 7.67 13.35 13.25 13.31 12.63 26.32 3.62 15.62 17.52 395.00 97.7 204.0 106.9 409.00 -4.00
12:00 PM 7.79 7.76 7.75 13.50 13.40 13.45 10.01 26.81 14.92 15.81 17.24 390.00 81.3 208.6 116.0 406.00 -5.00
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM 7.86 7.83 7.81 13.62 13.52 13.57 11.79 24.44 15.65 13.98 17.29 391.00 91.9 192.2 125.9 410.00 -32.00
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM 7.95 7.89 7.86 13.76 13.59 13.71 11.06 20.06 10.90 12.20 14.03 313.00 88.2 159.9 86.0 334.00 -50.00
6:00 AM 7.94 7.89 7.87 13.74 13.61 13.71 10.83 20.87 14.37 11.42 15.35 343.00 90.2 161.0 113.0 365.00 -50.00
7:00 AM 7.88 7.81 7.79 13.63 13.46 13.59 11.84 23.45 14.68 12.51 16.65 376.00 92.1 183.8 113.4 389.00 -37.00
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 7 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.8 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I6 IAVE. SL1 SL2 SL3
8:00 AM 7.85 7.78 7.76 13.58 13.41 13.54 10.07 22.25 13.83 12.68 15.38 350.00 78.8 170.9 109.0 359.00 -28.00
9:00 AM 7.81 7.76 7.75 13.52 13.39 13.48 10.08 20.68 12.60 12.25 14.44 328.00 76.6 163.9 99.6 340.00 -14.00
10:00 AM
11:00 AM 7.50 7.62 7.62 13.25 13.18 13.22 10.82 22.49 15.79 11.84 16.35 362.00 82.5 167.2 121.0 371.00 -24.00
12:00 PM 7.77 7.74 7.73 13.45 13.37 13.42 11.89 20.52 15.31 10.97 15.91 353.00 87.7 162.5 117.0 367.00 -26.00
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM 7.77 7.74 7.72 13.46 13.36 13.42 9.38 20.41 14.08 11.81 14.61 322.00 72.5 156.9 108.0 338.00 -30.00
6:00 PM
7:00 PM 7.78 7.75 7.74 13.48 13.38 13.43 15.21 30.76 18.65 19.74 21.53 479.00 117.0 235.2 147.2 500.00 -26.00
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 8 MET
Page 1 Page 2 Page 3 Page 4 Page 5
Time Voltage (kV) -7.62/13.9 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I7 IAVE. SL1 SL2 SL3
8:00 AM 7.89 7.83 7.82 13.65 13.51 13.61 9.67 21.79 13.35 12.56 14.94 300.00 76.7 173.2 101.1 351.00 -27.00
9:00 AM 7.80 7.76 7.75 13.50 13.41 13.47 11.19 23.24 13.62 13.50 16.01 348.00 84.9 173.9 104.1 363.00 -21.00
10:00 AM 7.69 7.67 7.67 13.32 13.26 13.30 11.59 21.12 13.48 11.84 15.40 349.00 87.0 166.9 102.4 356.00 -28.00
11:00 AM 7.70 7.68 7.67 13.35 13.27 13.30 12.10 21.91 14.63 12.03 16.20 367.00 99.9 168.6 112.5 381.00 -24.00
12:00 PM 7.76 7.73 7.72 13.44 13.35 13.39 11.89 21.40 14.24 11.91 15.84 347.00 85.8 165.0 110.0 361.00 -21.00
1:00 PM 7.75 7.74 7.70 13.40 13.31 13.35 10.61 21.31 13.64 12.03 15.18 330.00 79.2 160.1 109.7 349.00 -25.00
2:00 PM 7.74 7.71 7.70 13.40 13.33 13.37 10.58 21.99 13.96 12.12 15.50 351.00 90.2 169.9 10.6 367.00 -18.00
3:00 PM 7.75 7.72 7.73 13.42 13.36 13.41 10.48 23.11 13.88 13.53 15.81 354.00 80.6 181.9 109.5 372.00 -26.00
4:00 PM 7.78 7.76 7.76 13.47 13.42 13.46 9.98 22.32 14.15 13.36 15.48 349.00 77.8 176.7 112.1 367.00 -29.00
5:00 PM 7.83 7.81 7.80 13.57 13.49 13.53 12.01 27.16 16.97 16.75 18.71 421.00 96.4 210.0 134.5 441.00 -31.00
6:00 PM 7.80 7.78 7.77 13.51 13.45 1348.00 14.54 27.63 17.00 17.64 19.72 435.00 112.8 214.1 132.0 459.00 -40.00
7:00 PM 7.83 7.82 7.80 13.52 13.52 13.54 15.04 28.76 17.79 19.06 20.52 451.00 116.3 226.7 140.4 484.00 -36.00
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel


SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 9 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.10 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I8 IAVE. SL1 SL2 SL3
8:00 AM 7.82 7.77 7.75 13.54 13.40 13.50 10.25 21.65 13.36 12.49 15.09 332.00 78.0 164.1 102.9 345.00 -31.00
9:00 AM 7.75 7.72 7.71 13.42 13.34 13.38 10.12 21.57 13.28 11.96 14.99 334.00 80.0 174.7 101.5 357.00 -20.00
10:00 AM 7.68 7.65 7.65 13.30 13.23 13.27 10.00 21.21 12.94 11.96 14.71 323.00 79.0 163.8 98.5 341.00 -28.00
11:00 AM 7.64 7.62 7.60 13.24 13.16 13.19 10.34 21.41 14.7 10.97 15.48 343.00 81.3 166.5 110.0 358.00 -23.00
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM 7.72 7.68 7.69 13.35 13.29 13.34 12.07 25.38 17.12 14.63 18.18 404.00 96.6 194.4 132.2 423.00 -39.00
7:00 PM 7.73 7.70 7.68 13.39 13.30 13.34 15.24 29.57 18.29 19.02 21.02 461.00 121.0 227.6 138.6 487.00 -42.00
8:00 PM 7.75 7.73 7.71 13.42 13.36 13.38 14.61 25.84 17.29 16.68 19.24 424.00 112.7 200.2 133.2 447.00 -40.00
9:00 PM 7.89 7.85 7.83 13.65 13.55 13.62 13.24 22.47 16.00 14.90 17.23 379.00 104.1 175.4 124.9 405.00 -44.00
10:00 PM
11:00 PM
12:00 AM 7.96 7.91 7.88 13.78 13.63 13.74 10.34 17.91 12.27 9.96 13.50 299.00 82.3 140.6 95.9 319.00 -49.00
1:00 AM 7.93 7.86 7.83 13.71 13.54 13.66 9.60 16.78 11.11 9.48 12.49 282.00 75.9 132.2 87.7 296.00 -47.00
2:00 AM
3:00 AM
4:00 AM
5:00 AM 7.90 7.83 7.80 13.66 13.49 13.60 9.23 17.64 1248.00 9.35 13.11 288.00 72.5 137.8 96.8 308.00 -58.00
6:00 AM 7.81 7.75 7.72 13.51 13.35 13.46 11.13 19.86 13.84 10.61 14.94 332.00 86.0 152.8 107.1 346.00 -50.00
7:00 AM 7.84 7.80 7.76 13.58 13.44 13.51 12.39 20.73 13.50 10.85 15.53 352.00 96.8 162.0 107.8 366.00 -49.00
Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 10 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.11 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I9 IAVE. SL1 SL2 SL3
8:00 AM 7.85 7.82 7.80 13.61 13.49 13.55 10.34 22.59 14.63 11.06 15.84 358.00 81.1 176.1 112.0 369.00 -28.00
9:00 AM 7.75 7.73 7.71 13.43 13.35 13.39 10.43 19.53 14..46 9.48 14.89 334.00 79.7 158.2 114.9 353.00 -22.00
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM 7.71 7.68 7.66 13.35 13.27 13.29 10.20 20.61 13.86 10.61 14.89 326.00 78.1 159.6 106.6 344.00 -20.00
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 11 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.12 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I10 IAVE. SL1 SL2 SL3
8:00 AM 7.79 7.73 7.72 13.47 13.33 13.45 11.93 24.18 13.34 13.24 16.47 369.00 93.5 186.2 102.2 382.00 -29.00
9:00 AM 7.60 7.58 7.57 13.16 13.10 13.13 12.51 20.71 14.44 10.68 15.88 343.00 88.1 156.3 106.7 352.00 -31.00
10:00 AM 7.67 7.65 7.64 13.29 13.24 13.26 12.92 23.93 16.12 11.16 17.65 394.00 95.9 183.1 124.0 403.00 -24.00
11:00 AM 7.73 7.71 7.69 13.39 13.33 13.34 12.95 22.08 16.1 11.16 17.04 388.00 102.2 174.6 127.7 405.00 -29.00
12:00 PM 7.79 7.77 7.75 13.49 13.43 13.45 11.93 20.06 15.59 10.24 15.86 357.00 93.1 155.7 123.3 372.00 -26.00
1:00 PM 7.74 7.72 7.71 13.42 13.35 13.37 11.66 21.99 15.33 11.59 16.32 365.00 86.7 171.6 116.0 374.00 -21.00
2:00 PM 7.77 7.76 7.74 13.47 13.41 13.42 12.95 20.71 15.57 10.73 16.41 3737.00 102.4 159.4 124.7 387.00 -20.00
3:00 PM 7.77 7.76 7.73 13.48 13.41 13.42 12.73 20.32 15.69 10.46 16.24 365.00 101.1 156.4 123.6 381.00 -22.00
4:00 PM 7.76 7.74 7.73 13.44 13.38 13.41 12.60 20.41 15.36 10.41 16.12 363.00 100.1 156.9 116.1 376.00 -22.00
5:00 PM 7.79 7.76 7.75 13.48 13.42 13.45 13.28 20.64 16.20 10.15 16.70 378.00 103.2 160.8 135.5 400.00 -20.00
6:00 PM 7.79 7.75 7.73 13.48 13.38 13.44 18.90 29.92 23.07 16.00 23.96 540.00 147.0 231.1 175.6 554.00 -11.00
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 12 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.13 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I11 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM 7.51 7.44 7.39 13.01 12.79 12.90 15.21 25.67 18.15 16.12 19.67 418.00 117.5 192.0 136.9 447.00 -29.00
9:00 PM 7.51 7.44 7.38 13.00 12.78 12.90 15.45 25.45 18.27 15.91 19.72 421.00 114.9 189.7 135.7 441.00 -28.00
10:00 PM 7.49 7.41 7.37 12.95 12.75 12.87 11.25 19.36 14.77 10.51 15.12 320.00 84.8 141.6 109.0 336.00 -45.00
11:00 PM 7.49 7.41 7.37 12.95 12.75 12.87 11.23 19.76 14.70 10.68 15.23 325.00 84.1 148.4 108.5 341.00 -44.00
12:00 AM 7.49 7.41 7.36 12.96 12.74 12.87 11.30 19.21 14.77 10.39 15.09 323.00 84.6 144.7 108.8 338.00 -44.00
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM 7.40 7.33 7.29 12.81 12.62 12.71 13.95 28.45 17.16 15.81 19.84 427.00 106.4 209.0 124.3 440.00 -41.00
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 13 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.14 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I12 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM 7.72 7.64 7.60 13.35 13.14 13.28 12.25 20.88 12.78 13.11 15.30 333.00 92.6 159.7 98.4 351.00 -46.00
10:00 AM 7.72 7.64 7.60 13.36 13.14 13.28 12.10 21.23 12.80 13.28 15.36 334.00 92.8 161.3 97.8 352.00 -45.00
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM 7.68 7.60 7.56 13.29 13.06 13.20 13.91 27.00 16.05 14.94 19.00 406.00 103.1 200.4 112.8 416.00 -46.00
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 14 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.15 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I13 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 15 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.16 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
Time
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I14 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 16 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Volta+B531:G532ge (kV) -7.62/13.17 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I15 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:


Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 17 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.18 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I16 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 18 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.19 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I17 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 19 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.20 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I18 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 20 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.21 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I19 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 21 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.22 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I20 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 22 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.23 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I21 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 23 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time
Time Voltage (kV) -7.62/13.24 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I22 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

LLAVAC
MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC
Date: FEBRUARY 24 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.25 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I23 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:


Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 25 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.26 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I24 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 26 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.27 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I25 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 27 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.28 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I26 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 28 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.29 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I27 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 29 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.30 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I28 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 30 MET

Page 1 Page 2 Page 3 Page 4 Page 5


Time Voltage (kV) -7.62/13.31 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I29 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER

MONITORING OF CAPALONG SUBSTATION (5 MVA POWER TRANSFORMER) LLAVAC


Date: FEBRUARY 31 MET
Page 1 Page 2 Page 3 Page 4 Page 5
Time Voltage (kV) -7.62/13.32 Phase Current Apparent Power (KVA)
P∑ (KW) S∑ (KVA) Q∑ (KVAR)
VL1 VL2 VL3 VL12 VL23 VL31 IL1 IL2 IL3 I30 IAVE. SL1 SL2 SL3
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM

7:00 AM

Prepared By: Checked by:

Engr. Vincent E. Villaruel

SCADA ENGINEER OIC, TSD MANAGER


LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.970 19.19
0.959 19.18
0.971 19.18
0.971 19.18
0.976 19.18
0.967 19.18
0.966 19.18
0.963 19.18
0.963 19.18
0.955 19.18
0.961 19.18
0.962 19.18
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.970 19.20
0.970 19.20
0.974 19.20
0.966 19.20
0.973 19.20
0.956 19.20
0.951 19.20
0.948 19.20
0.943 19.20
0.956 19.21
0.962 19.21
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
0.964 19.21
0.961 19.21
0.962 19.21
0.961 19.21
0.958 19.21
0.955 19.11
0.951 19.11
0.949 19.11
0.960 19.21
0.953 19.21
0.954 19.21

0.942 19.22
0.940 19.22
0.934 19.22

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
0.959 19.22
0.954 19.22
0.961 19.22
0.978 19.22
0.976 19.22

0.957 19.22

0.943 19.23
0.947 19.23
0.964 19.23
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.960 19.23
0.958 19.23

0.967 19.23
0.959 19.23

0.949 19.23

0.958 19.23

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE
Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
0.963 19.24
0.966 19.24
0.965 19.24
0.964 19.24
0.961 19.24
0.959 19.24
0.966 19.24
0.961 19.24
0.957 19.24
0.958 19.24
0.950 19.24
0.950 19.24

Noted By:

Engr. Von Erwin G. Azagra


OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
0.954 19.24
0.964 19.24
0.959 19.24
0.963 19.24

0.954 19.25
0.952 19.25
0.947 19.25
0.940 19.25

0.937 19.25
0.936 19.25

0.933 19.25
0.948 19.25
0.958 19.25
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.967 19.25
0.962 19.25

0.960 19.25
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
0.972 19.26
0.967 19.26
0.977 19.26
0.967 19.26
0.962 19.26
0.967 19.26
0.965 19.26
0.964 19.26
0.964 19.26
0.969 19.26
0.968 19.26
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
0.955 19.27
0.955 19.27
0.951 19.27
0.953 19.27
0.953 19.27

0.972 19.27

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t

0.946 19.28
0.948 19.28
0.966 19.28

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Energy Remarks
∑Power
Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t

Noted By:
Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Remarks
∑Power Energy Remarks
Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor
Wp∑t

Noted By:
Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
Factor (GWH)
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power
(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5

∑Power Energy Remarks


(GWH)
Factor Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE

Page 5
Energy Remarks
∑Power (GWH)
Factor
Wp∑t
Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

LLAVAC FEEDER
METERING DEVICE
Page 5

∑Power Energy Remarks


Factor (GWH)
Wp∑t

Noted By:

Engr. Von Erwin G. Azagra

OIC, GENERAL MANAGER

You might also like