PIT.

PM
PLAN ACTUAL BY SURVEY ACTUAL BY TRUCK COUNT Achievement
TANGGAL
OB Coal SR OB Coal SR OB Coal SR OB Caol
(Bcm) (Ton) Cont. (Bcm) (Ton) Cont. (Bcm) (Ton) Cont. (%) (%)
05/02/2023 3000 1.2 0
06/02/2023 3000 1.2 0
07/02/2023 3000 1.2 0
08/02/2023 3000 1.2 0
09/02/2023 3000 613.8 1.2 20.46
10/02/2023 3000 1.2 0
11/02/2023 3000 1.2 0
12/02/2023 3000 1.2 0
13/02/2023 3000 1.2 0
14/02/2023 3000 1.2 0
15/02/2023 3000 1.2 0
16/02/2023 3000 1.2 0
17/02/2023 3000 1.2 0
18/02/2023 3000 1.2 0
19/02/2023 3000 1.2 0
20/02/2023 3000 1.2 0
21/02/2023 3000 1.2 0
22/02/2023 3000 1.2
23/02/2023 3000 1.2
24/02/2023 3000 1.2
TOTAL

613.8