Subursaba Sdn Bhd (426851-A)

No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 30/12/2022
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 31/12/2022
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 04/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 05/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 06/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 07/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 09/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 11/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 12/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 13/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 14/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 16/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 17/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 18/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 19/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 25/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 26/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 27/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer
Subursaba Sdn Bhd (426851-A)
No. 33A Eastern Gateway Industrial Park Jalan Tun Hussein Onn,
P.O. Box 480, 97000 Bintulu Sarawak
Tel No.: +60105668025 Fax: 086-332575
Email: subursabasb@gmail.com

DAILY SAFETY REPORT


Project Name: Construction and Completion of Date: 28/01/2023
Reinforce Concrete Road (Package A)
Location: Lavang Estate Main Road, From Lavang Working Hour: 8am to 4pm
Estate Main Gate to Lavang Mill, Bintulu, Sarawak

Arrangement Yes No Arrangement Yes No


1 Toolbox / 12 Hot Work /
2 PPE / 13 Confined Space /
3 Housekeeping / 14 Chemical Handling /
4 Hand Tools Inspection / 15 Working at Height /
5 Machinery Inspection / 16 Signages/Barricade /
6 Excavation Work / 17 Facilities Usage /
7 Electrical Appliance / 18 CIDB Green Card /
8 Fire Protection / 19 Traffic Management /
9 Lighting / 20 Material Handling /
10 Horseplay / 21 PTW /
11 Unsafe Condition /
Details of Incidents / Near Miss/ Unsafe Conditions Which Have Occurred (If Any):

Action:

Prepared By Verified By

CYNTHIA CHUA OLYVIA MINA


Site Safety Supervisor Site Engineer