22 KAIG3-SI-CO-C-0009-00 Curing
Gate valve for Pipe Pre-insulated at valve box on the site can
86 KAIG3-SI-GN-M-0007-00
not apply to installed for Chilled and Heating water pipelines
104 KAIG3-SI-MB-E-0004-00 Installations of the cable tray and trunk supporting systems at
the maintaince building
109 KAIG3-SI-PT-A-0004-00-00 Setting out of grrooves for exterior elevation fpr toilet # 1
114 KAIG3-SI-SW-C-0028-00 Improper and Defective Concrete Works and pipe Utilities
125 KAIG3-SI-TT-A-0007-00 Lab Test for The Cement Plastering Works for Toilet in Tower 1
130 KAIG3-SI-WG-A-0038-00 S STEEL STEPS for wet well E&F at water gardens
DISCIPLINE
ARCHITECTURAL
CIVIL
ELECTRICAL
GENERAL
LOW CURRENT
LANDSCAPE
MECHANICAL
STRUCTURAL
TOTAL
STRUCTION LOGSHEET
Location
Discipline Status Reply Code Received Date Date Action
Area
Approved As
BO A Closed 23-Jun-20 10-Aug-20
Noted
Approved As
CO A Closed 9-Feb-22 6-Aug-22
Noted
CO A Open 16-Feb-22
CO A Open 15-Mar-22
Approved As
CO A Closed Noted 22-Mar-22 9-Aug-22
CO A Proposal Under Process 24-Apr-22 7-May-22
CO A Open 16-May-22
CO A Open 7-Sep-22
Approved As
CO C Closed 17-Jun-20 20-Jun-20
Noted
GN C Open 8-Dec-19
Approved As
GN C Closed 23-Jan-22 10-Mar-22
Noted
GN C Open 24-Feb-22
GN C Open 1-Aug-22
GN C Open 18-Aug-22
Approved As
GN E Closed 10-Mar-22 3-Apr-22
Noted
Approved As
GN G Closed 30-Nov-19 21-Jul-20
Noted
Approved As
GN G Closed 22-Mar-20 10-Sep-20
Noted
Approved As
GN HSE Closed 23-Dec-20 28-Dec-20
Noted
Approved As
GN HSE Closed 11-Nov-21 22-Nov-21
Noted
Approved As
GN HSE Closed 15-Nov-21 22-Nov-21
Noted
Approved As
GN HSE Closed 27-Jan-22 14-Feb-22
Noted
Approved As
GN HSE Closed 30-Oct-22 1-Nov-22
Noted
Approved As
GN LC Closed 24-Oct-22 14-Nov-22
Noted
GN LC Open 2-Nov-22
Approved As
GN M Closed 20-Sep-22 4-Oct-22
Noted
GN M Open 2-Oct-22
GN M Open 7-Nov-22
GN M Open 1-Jan-23
Approved As
GN S Closed 11-Jan-20 2-Jun-20
Noted
Approved As
FC S Closed 8-Feb-20 13-Feb-20
Noted
Approved As
GN S Closed 13-Aug-22 28-Sep-22
Noted
MB A Open 7-Jun-22
Approved As
MB A Closed 29-Aug-22 3-Sep-22
Noted
Approved As
MB E Closed 2-May-20 6-May-20
Noted
Approved As
MB S Closed 3-Jun-21 20-Jan-22
Noted
PG A Open 21-Dec-22
SW C Open 28-Apr-22
SW C Open 3-Oct-22
Approved As
TT A Closed 22-Jul-20 11-Aug-20
Noted
Approved As
TT A Closed 25-Aug-20 16-Sep-20
Noted
WG A Open 3-Nov-22
Approved As
GN A Closed 15-Dec-19 10-May-20
Noted
Approved As
GN HSE Closed 19-Nov-19 23-Dec-19
Noted
7 32 1
7 12 0
0 5 0
0 4 0
0 33 0
1 1 0
0 15 0
3 4 0
1 12 0
19 118 1
SITE INSTRUCTION LOGSHEET
Location
SN SI Reference# Title Subdescription Discipline Status Reply Code Received Date Date Action
Area
4 KAIG3-SI-CO-A-0036-00 Sealant for expansion joints at North Administration elevations CO A Open 7-Sep-22
6 KAIG3-SI-GN-C-0019-00 Unauthorized backfilling of Existing Excavation at Zone G GN C Open Under Process 26-Oct-21 12-Jan-22
11 KAIG3-SI-GN-M-0002-00 Thermal expansion joints - Chilled and heating water pipeline GN M Open 2-Oct-22
Gate valve for Pipe Pre-insulated at valve box on the site can
13 KAIG3-SI-GN-M-0007-00 GN M Reply to DAR Under Process 14-Nov-22 19-Nov-22
not apply to installed for Chilled and Heating water pipelines
19 KAIG3-SI-SW-C-0028-00 Improper and Defective Concrete Works and pipe Utilities SW C Reply to DAR Rejected 11-Dec-22 27-Nov-22
23 KAIG3-SI-WG-A-0038-00 S STEEL STEPS for wet well E&F at water gardens WG A Open 3-Nov-22
ARCHITECTURAL 7 32 1
CIVIL 7 12 0
ELECTRICAL 0 5 0
GENERAL 0 4 0
LOW CURRENT 1 1 0
LANDSCAPE 0 15 0
MECHANICAL 3 4 0
STRUCTURAL 1 12 0
TOTAL 19 118 1