WEEKLY MAINTENANCE SCHEDULE

TEAM : PEMELIHARAAN LISTRIK BLOK 1 SUPERVISOR : AGUNG PIKANANDRA W

Senin Selasa
WEEK : 51 20-Dec-21 21-Dec-21
1 AGUNG PIKANANDRA WIBAWA SP 2:00:00 APW 0:30 0:30
2 NUR CAHYA ADI TS 40:00:00 ADI 8:00 8:00
3 ARI PURNAMA AJI TS 32:00:00 ARI CT 8:00
4 M. RIFKY FAISAL TS 0:00:00 MRF RESOURCE TRANSFER to BLOK
5 AGA DIA AMU 40:00:00 AGA 8:00 8:00
6 RICHARDO OKTAVIANUS LENGKEY T 40:00:00 ROL 8:00 8:00
NORMAL AVAILABILITY MANHOURS 154:00:00 82.03% 24:30:00 32:30:00

JOB LOADING 82% 81%

Line Clock Senin Selasa


Item WO NUM Job Description Crew Size
Hours
Man Hours Assigned Crew
20-Dec-21 21-Dec-21
PREVENTIVE MAINTENANCE
1 PM-LTL10018 202137543 3 LR-STG 1.0 Pemeliharaan Battery Diesel Emergency 400V (1W) 1 2:00 2:00 2:00
2 PM-LTL14037 202137572 3 LR-STG 1.0 Pemeliharaan motor hydrazine feed pump A dan B (4M) 1 1:00 1:00 1:00
3 PM-LTL11053 202133491 3 LR-HRSG 1.1 PM Pemeriksaan Rutin Panel Box MCC HRSG (2W) 1 1:00 1:00 1:00
4 PM-LTL12039 202137544 3 LR-GTG 1.2 Pemeliharaan ST. BATTERY  GTG  (2, 4, 12W) 1 2:00 2:00 2:00
5 PM-LTL12052 202133494 3 LR-GTG 1.2 PM Pemeriksaan Rutin Panel Box MCC 2 (2W) 1 1:30 1:30 1:30
6 PM-LTL12051 202133493 3 LR-GTG 1.2 PM Pemeriksaan Rutin Panel Box MCC 1 (2W) 1 1:30 1:30 1:30
7 PM-LTL12053 202133495 3 LR-HRSG 1.2 PM Pemeriksaan Rutin Panel Box MCC HRSG (2W) 1 1:00 1:00 1:00
8 PM-LTL12111 202133496 3 Pemeliharaan Panel & Motor Damper HRSG 1.2 1 1:30 1:30 1:30
9 PM-LTL13039 202137561 3 LR-GTG 1.3 Pemeliharaan ST. BATTERY  GTG  (2, 4, 12W) 1 2:00 2:00 2:00
10 PM-LTL13051 202133517 3 LR-GTG 1.3 PM Pemeriksaan Rutin Panel Box MCC 1 (2W) 1 1:30 1:30 1:30
11 PM-LTL13052 202133518 3 LR-GTG 1.3 PM Pemeriksaan Rutin Panel Box MCC 2 (2W) 1 1:30 1:30 1:30
12 PM-LTL11027 202135448 3 FDT RCFA : LR-GTG 1.1 Pemeliharaan  breaker dan motor cranking ( 88 CR - 1 )  (12W)-(4W) 1 1:30 1:30
13 PM-LTL13050 202133516 3 LR-GTG 1.3 REGREASING BEARING STARTING AIR MOTOR (4W) 1 0:40 0:40
14 PM-LTL13040 202137562 3 LR-GTG1.3 Pemeliharaan Generator Transformer (4W) 1 1:00 1:00
15 PM-LTL13054 202137571 3 LR-GTG 1.3 Pemeliharaan Transformer UAT GTG 1.3   ( 4W ) 1 1:00 1:00
16 PM-LTL13003 202137545 3 LR-GTG 1.3 Pemeliharaan Generator  (4M) 1 1:30 1:30
17 PM-LTL13004 202137546 3 LR-GTG 1.3 Pemeliharaan  Exciter  (4W) 1 1:00 1:00
18 PM-LTL13013 202137547 3 LR-GTG 1.3 Pemeliharaan Motor Blower Turbine Sheel & Exhaust Frame (88 TK-1)  (4M) 1 1:30 1:30
19 PM-LTL13014 202137548 3 LR-GTG 1.3 Pemeliharaan Motor Blower Turbine Sheel & Exhaust Frame (88 TK-2)  (4M) 1 1:30 1:30
20 PM-LTL13015 202137549 3 LR-GTG 1.3 Pemeliharaan  Motor Cooling Water Pump (88 WC - 1)  (4M) 1 1:00 1:00
21 PM-LTL13016 202137550 3 LR-GTG 1.3 Pemeliharaan  Motor Cooling Water Pump (88 WC - 2)  (4M) 1 1:00 1:00
22 PM-LTL13017 202137551 3 LR-GTG 1.3 Pemeliharaan  Motor Fan Cooling Water (88 FC1, 88FC2, 88FC3, 88FC4)  (4M) 1 2:00 2:00
23 PM-LTL13022 202133504 3 LR-GTG 1.3 Pemeliharaan  CO2 Refrigeration System  (4M) 1 1:00 1:00
24 PM-LTL13025 202137552 3 LR-GTG 1.3 Pemeliharaan Motor Fuel Forwarding Pump 88 FD-1 & 88 FD-2 (4W) 1 2:00 2:00
25 PM-LTL13053 202133519 3 LR-HRSG 1.3 PM Pemeriksaan Rutin Panel Box MCC HRSG (2W) 1 1:00 1:00
26 PM-LTL13031 202137553 3 LR-HRSG 1.3 Pemeliharaan Motor High Pressure Transfer Pump 1  (4M) 1 2:00 2:00
27 PM-LTL13032 202137554 3 LR-HRSG 1.3 Pemeliharaan Motor High Pressure Transfer Pump 2  (4M) 1 2:00 2:00
28 PM-LTL13033 202137555 3 LR-HRSG 1.3 Pemeliharaan Motor High Pressure Circulating Pump 3B1  (4W) 1 1:00 1:00
29 PM-LTL13034 202137556 3 LR-HRSG 1.3 Pemeliharaan Motor High Pressure Circulating Pump 3B2  (4W) 1 1:00 1:00
30 PM-LTL13035 202137557 3 LR-HRSG 1.3 Pemeliharaan Motor Low Pressure Circulating Pump 1  (4M) 1 1:45 1:45
31 PM-LTL13036 202137558 3 LR-HRSG 1.3 Pemeliharaan Motor Low Pressure Circulating Pump 2  (4M) 1 1:45 1:45
32 PM-LTL13037 202137559 3 LR-HRSG 1.3 Pemeliharaan Motor Condensate Circulating Pump 1  (4M) 1 1:00 1:00
33 PM-LTL13038 202137560 3 LR-HRSG 1.3 Pemeliharaan Motor Condensate Circulating Pump 2  (4M) 1 1:00 1:00
34 PM-LTL13042 202137563 3 LR-HRSG 1.3 PM Pengecekan Motor MBV LP Steam Line HRSG (4 W) 1 1:30 1:30
35 PM-LTL13043 202137564 3 LR-HRSG 1.3 PM Pengecekan Motor MBV HP Drum HRSG (4 W) 1 1:45 1:45
36 PM-LTL13044 202137565 3 LR-HRSG 1.3 PM Pengecekan Motor MBV HP Steam Line HRSG (4 W) 1 0:50 0:50
37 PM-LTL13045 202137566 3 LR-HRSG 1.3 PM Pengecekan Motor MBV LP Economizer HRSG (4 W) 1 1:00 1:00
38 PM-LTL13046 202137567 3 LR-HRSG 1.3 PM Pengecekan Motor MBV HP Economizer HRSG (4 W) 1 1:00 1:00
39 PM-LTL13047 202137568 3 LR-HRSG 1.3 PM Pengecekan Motor MBV HP Circulation Pump 1 HRSG (4 W) 1 1:15 1:15
40 PM-LTL13048 202137569 3 LR-HRSG 1.3 PM Pengecekan Motor MBV HP Circulation Pump 2 HRSG (4 W) 1 1:15 1:15
41 PM-LTL13049 202137570 3 LR-HRSG 1.3 PM Pengecekan Motor MBV HP Superheater 2 HRSG (4 W) 1 0:50 0:50

Total 41 TOTAL PM MANHOURS 55:05:00 35.77% 7:30 9:00

Clock
WO NUM Priority Type Job Description Crew Size Hours Man Hours Assigned Crew Senin Selasa

PLANNED MAINTENANCE
1 202139379 3 CD BLOK 1 GTG Pendampingan pekerjaan penggantian part kontrol & brake crane 1 7:30 7:30 1:30 1:30
2 202016897 3 CD [WSERV] STG 1.0 Kalibrasi KWH Meter PLTU-PLTGU Tahun 2021 1 3:00 3:00 3:00
3 202134231 3 CD STG 1.0 Perbaikan Sump Pump inlet condensor ( 3" ) dua buah tidak siap (short), dan pembuatan sistem kontrol aut 1 8:00 8:00 4:00 4:00
o sump pump 10"
4 202138806 3 CD STG 1.0 : Mixer Tangki Ammonia tidak bisa beroperasi 1 3:00 3:00 3:00
5 202138807 3 CD STG 1.0 MBV 3002 kabel keluar asap 1 4:00 4:00 4:00
[TUG] [WO FU] HRSG 1.1 Penambahan Heater terkait HRSG trip dari breaker MCC 1A1 trip (Material telah
6 202139378 3 CD 1 3:00 3:00
tersedia : hetaer "CONHEAT")
7 201930028 3 CD [Spec not OK] [WO FU] GTG 1.1 Penggantian Digital Volt Meter di Charger karena pembacaan tegangan battery tidak 1 1:00 1:00
 normal (lebih rendah dari yang terbaca di Local battery)
8 202046361 3 CD [WSERV] [WO FU] GTG 1.1 Perbaikan Volt Meter ST. BATTERY karena rusak 1 1:00 1:00
9 202028713 3 CD [spec belum ada] [WO FU] GTG 1.1 Penggantian Volt meter battery rusak 1 1:00 1:00
10 202138826 3 CD GTG 1.1 Ciller CO2 vent belt lepas 1 2:30 2:30
11 202135109 3 CD [WO FU] GTG 1.1 Penggantian Carbon Brush Generator temuan 4 buah tipis 1 2:30 2:30
12 202138227 3 CD STG 1.0 Saat blackout, lampu penerangan emergency tidak ada yang menyala 1 2:00 2:00
13 202139330 3 CD [WO FU] GTG 1.1 Perbaikan lampu excitasi compartement mati 1 2:00 2:00
14 202138287 3 CD [WO FU] STG 1.0 Perbaikan lampu penerangan ruang Diesel 400 V banyak yang padam 1 2:00 2:00
15 202138360 3 CD GTG 1.2 Lampu penerangan panel PECC mati 2 buah 1 2:00 2:00
16 202137199 3 CD [WO FU] lampu ruang BATTERY Control Building PLTGU BLOK 1 mati 1 2:00 2:00
17 202133751 3 CD GTG 1.2 Lampu penerangan sisi timur mati semua 1 2:00 2:00
18 202136132 3 CD [WO FU] GTG 1.3 Perbaikan lampu penerangan excitation compartement mati (order KT lampu) 1 2:00 2:00
19 202133878 3 CD [WO FU] STG 1.0 COntinues perbaikan Lampu penerangan di  area IPC 2 titik dan mezanine floor 8 titik (order KT) 1 2:00 2:00
20 202132773 3 CD HRSG 1.2 Perbaikan lampu penerangan di MCC HRSG mati (2 lampu belum menyala) 1 2:00 2:00

Total 20 TOTAL PLANNED MAINTENANCE MANHOURS 54:30:00 35.39% 8:30 12:30

UN-PLANNED MAINTENANCE
Urgent 0:00

TOTAL URGENT 0 0.00% 0:00 0:00


Emergency

TOTAL EMERGENCY 0 0.00% 0:00 0:00


TOTAL UN-PLANNED WORK. MANHOURS 0 0.00% 0:00:00 0:00:00
PROACTIVE MAINTENANCE/PREDICTIVE MAINTENANCE

Total 0 TOTAL PROACTIVE MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00

PROJECT MAINTENANCE / WO OUTAGE / OH

Total 0 TOTAL PROJECT MAINTENANCE MANHOURS 0:00:00 0.00% 0:00:00 0:00:00

OTHER PLANNED ACTIVITIES


1 Inventarisasi Asset Tetap 2 2:30 5:00 AGA,ROL 1:00 1:00
2 Briefing Pagi Area 4 0:45 3:00 ALL 3:00
3 COC 5 0:45 3:45 ALL 3:45
4 Kegiatan Senam Bersama 5 1:00 5:00 ALL

Total 4 TOTAL OTHER PLANNED ACTVITIES. MANHOURS 16:45:00 10.88% 4:00 4:45

TOTAL MANHOURS SCHEDULED 126:20:00 82.03% 20:00:00 26:15:00


82% 81%

TOTAL SCHEDULED

TOTAL WO SCHEDULED
Rabu Kamis Jum'at Sabtu Minggu Actual
22-Dec-21 23-Dec-21 24-Dec-21 25-Dec-21 26-Dec-21 Hours %
0:00 0:00 1:00 2:00:00 100.00
8:00 8:00 8:00 40:00:00 100.00
8:00 8:00 8:00 32:00:00 100.00
RESOURCE TRANSFER to BLOK 2 0:00:00 #DIV/0!
8:00 8:00 8:00 40:00:00 100.00
8:00 8:00 8:00 40:00:00 100.00
32:00:00 32:00:00 33:00:00 0:00:00 0:00:00 154:00:00 100.00
85% 83% 80% 82.03%
Rabu Kamis Jum'at Sabtu Minggu Actual Rencana
Completed Man
Review Problem
Assigned Tindak
Hours
Crew Failure
Lanjut
22-Dec-21 23-Dec-21 24-Dec-21 25-Dec-21 26-Dec-21

1:30
0:40
1:00
1:00
1:30
1:00
1:30
1:30
1:00
1:00
2:00
1:00
2:00
1:00
2:00
2:00
1:00
1:00
1:45
1:45
1:00
1:00
1:30
1:45
0:50
1:00
1:00
1:15
1:15
0:50

13:40 6:00 18:55 #REF! #REF! #REF! #REF!

Rabu Kamis Jum'at Sabtu Minggu

1:30 1:30 1:30

3:00
1:00
1:00
1:00
2:30
2:30
2:00
2:00
2:00
2:00
2:00
2:00
2:00
2:00
2:00

12:30 19:30 1:30 #REF! #REF! 0:00

0:00 0:00 0:00 0:00 0:00 0

0:00 0:00 0:00 0:00 0:00 0


0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0

0:00 0:00 0:00 0:00 0:00 0:00

0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00

1:00 1:00 1:00

5:00

1:00 1:00 6:00 0:00 0:00 #REF!


27:10:00 26:30:00 26:25:00 #REF! #REF! TOTAL ACTUAL MAN HOURS
85% 83% 80% #REF! #REF! #REF!

126:20:00

82.03% PLANNING
COMPLIANCE #REF! 109:35:00 0.7115801

61
WEEKLY MAINTENANCE SCHEDULE
TEAM : PEMELIHARAAN LISTRIK BLOK 2 SUPERVISOR : EKO KUSNIANTO

Senin Selasa Rabu Kamis Jum'at


WEEK : 51 20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
1 EKO KUSNIANTO SP 4:15:00 EKO 0:30 0:45 1:00 1:00 1:00
2 M. RIFKY FAISAL TS 24:00:00 MRF CT CT 8:00 8:00 8:00
3 SURYA JATI PAMUNGKAS T 32:00:00 SJP CT 8:00 8:00 8:00 8:00
4 INDRA YOGASWARA T 40:00:00 IND 8:00 8:00 8:00 8:00 8:00
NORMAL AVAILABILITY MANHOURS 100:15:00 82.21% 8:30:00 16:45:00 25:00:00 25:00:00 25:00:00

JOB LOADING 88% 79% 80% 87% 80%

Line Senin Selasa Rabu Kamis Jum'at


WO NUM Job Description Crew Size Clock Hours Man Hours Assigned Crew
Item
20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
PREVENTIVE MAINTENANCE
1 PM-LTL20018 202137508 3 LR-STG 2.0 Pemeliharaan ST. BATTERY  SUDEG 6,3KV ( 1W ) 1 2:00 2:00 2:00
2 PM-LTL24008 202131137 3 LR-STG 2.0 Pemeliharaan Motor Vacuum Primming Pump 1B  ( 6W ) 1 1:00 1:00 1:00
3 PM-LTL24044 202131138 3 LR-STG 2.0 PM PEMELIHARAAN TRAFO UAT 21 RUTIN (12 WEEKS ) 1 1:00 1:00 1:00
4 PM-LTL24045 202131139 3 LR-STG 2.0 PM PEMELIHARAAN TRAFO SAT 1.1 RUTIN (12 WEEKS ) 1 1:00 1:00 1:00
5 PM-LTL24047 202131140 3 LR-STG 2.0 PM PEMELIHARAAN TRAFO SAT 1.2 RUTIN (12 WEEKS ) 1 1:00 1:00 1:00
6 PM-LTL21001 202137509 3 LR-GTG 2.1 Pemeliharaan  Spark Plug Untuk Chamber No  13 dan 14 (1M) 1 3:00 3:00 3:00
7 PM-LTL22039 202137516 3 LR-GTG 2.2 Pemeliharaan ST. BATTERY  GTG  ( 2,4,12W ) 1 2:00 2:00 2:00
8 PM-LTL22059 202137518 3 LR-GTG 2.2 Pemeliharaan Eksitasi OVATION ( 2W ) 1 2:00 2:00 2:00
9 PM-LTL22006 202133524 3 LR-GTG 2.2 Pemeliharaan Motor Cooling Air Fan Turbin Compartment   88 BT-1  (8W) 1 2:00 2:00 2:00
10 PM-LTL22027 202137513 3 FDT RCFA : LR-GTG 2.2 Pemeliharaan  breaker dan motor cranking ( 88 CR - 1 ) (12W)-(4W) 1 1:30 1:30 1:30
11 PM-LTL23039 202137531 3 LR-GTG 2.3 Pemeliharaan ST. BATTERY  GTG  ( 2,4,12.W ) 1 2:00 2:00 2:00
12 PM-LTL23059 202137542 3 LR-GTG 2.3 Pemeliharaan Eksitasi OVATION ( 2W ) 1 2:00 2:00 2:00
13 PM-LTL23040 202137532 3 LR-GTG 2.3 Pemeliharaan Generator Transformer GTG 2.3   ( 4W ) 1 1:00 1:00 1:00
14 PM-LTL23015 202131091 3 LR-GTG 2.3 Pemeliharaan Motor Cooling Water Pump 88 WC - 1 ( 4W ) 1 1:00 1:00 1:00
15 PM-LTL23016 202131093 3 LR-GTG 2.3 Pemeliharaan Motor Cooling Water Pump 88 WC - 2 ( 4W ) 1 1:00 1:00 1:00
16 PM-LTL23013 202137519 3 LR-GTG 2.3 Pemeliharaan Motor Blower Turbine Sheel & Exhaust Frame (88 TK-1)   (4W) 1 1:30 1:30 1:30
17 PM-LTL23014 202137520 3 LR-GTG 2.3 Pemeliharaan Motor Blower Turbine Sheel & Exhaust Frame (88 TK-2)   (4W) 1 1:30 1:30 1:30
18 PM-LTL23017 202137521 3 LR-GTG 2.3 Pemeliharaan  Motor Fan Cooling Water (88 FC1, 88FC2, 88FC3, 88FC4)  (4M) 1 2:00 2:00 2:00
19 PM-LTL23052 202131133 3 LR-GTG 2.3 REGREASING BEARING STARTING AIR MOTOR (4W) 1 0:40 0:40 0:40
20 PM-LTL23027 202137523 3 FDT RCFA : LR-GTG 2.3 Pemeliharaan  breaker dan motor cranking  ( 88 CR - 1 ) (12W)-(4W) 1 1:30 1:30 1:30
21 PM-LTL23010 202131084 3 LR-GTG 2.3 Pemeliharaan Motor Axiliary Lube Oil Pump 88 QA - 1 (12W) 1 1:00 1:00 1:00
22 PM-LTL23031 202137524 3 LR-HRSG 2.3 Pemeliharaan Motor HP Transfer Pump  3A1  ( 4W ) 1 2:00 2:00 2:00
23 PM-LTL23032 202137525 3 LR-HRSG 2.3 Pemeliharaan Motor HP Transfer Pump  3A2  ( 4W ) 1 2:00 2:00 2:00
24 PM-LTL23033 202131115 3 LR-HRSG 2.3 Pemeliharaan Motor HP Circulating Pump  3B1  ( 4W ) 1 1:00 1:00 1:00
25 PM-LTL23034 202137526 3 LR-HRSG 2.3 Pemeliharaan Motor HP Circulating Pump  3B2  ( 4W ) 1 1:00 1:00 1:00
26 PM-LTL23037 202137529 3 LR-HRSG 2.3 Pemeliharaan Motor Condensate Circulating Pump 3D1  (4W ) 1 1:00 1:00 1:00
27 PM-LTL23038 202137530 3 LR-HRSG 2.3 Pemeliharaan Motor Condensate Circulating Pump 3D2  ( 4W ) 1 1:00 1:00 1:00
28 PM-LTL23043 202137534 3 LR-HRSG 2.3 : PM Pengecekan Motor MBV LP Steam Line HRSG (4 W) 1 1:00 1:00 1:00
29 PM-LTL23045 202137536 3 LR-HRSG 2.3 : PM Pengecekan Motor MBV HP Steam Line HRSG (4 W) 1 1:00 1:00 1:00
30 PM-LTL23046 202137537 3 LR-HRSG 2.3 : PM Pengecekan Motor MBV LP Economizer HRSG (4 W) 1 1:00 1:00 1:00
31 PM-LTL23048 202137539 3 LR-HRSG 2.3 : PM Pengecekan Motor MBV HP Circulation Pump 1 HRSG (4 W) 1 1:15 1:15 1:15
32 PM-LTL23050 202137541 3 LR-HRSG 2.3 : PM Pengecekan Motor MBV HP Superheater 2 HRSG (4 W) 1 1:00 1:00 1:00
33 PM-LTL23035 202137527 3 LR-HRSG 2.3 Pemeliharaan Motor LP Circulating Pump 3C1  ( 4W ) 1 1:45 1:45 1:45
34 PM-LTL23111 202133528 3 Pemeliharaan Motor & Panel Damper HRSG 2.3 1 1:30 1:30 1:30

Total 34 TOTAL PM MANHOURS 48:10:00 48.05% 3:00 6:00 11:30 13:10 14:30

WO NUM Priority Type Job Description Crew Size Clock Hours Man Hours Assigned Crew Senin Selasa Rabu Kamis Jum'at
PLANNED MAINTENANCE
1 202138818 3 CD [WO FU] STG 2.0 Penggantian Silica gel trafo SST 2 1 2:30 2:30 2:30
2 202123365 3 CD [WO FU] STG 2.0 Perbaikan Display Meter Listrik di GCP karena terdapat selisih pembacaan  dengan Ovation - PUNCHLIST 1 4:00 4:00 4:00
3 202138821 3 CD [WO FU] STG 2.0 Continue Identifikasi kabel charging battery kontrol short to ground, perlu pengecekan kabel yg short - Bers 1 4:00 4:00 4:00
ama HKI
GTG 2.2 : Breaker 23-HA (Access compt Humidity Heater) bergetar
4 202139369 3 CD 1 3:00 3:00 3:00
5 202131285 3 CD [WO FU] GTG 2.3 Continue Identifikasi muncul alarm battery 125V DC Ground 1 4:00 4:00 4:00
6 202139361 3 CD [ GTG 2.3 ] fan blower tambahan motor cranking patah & lepas 1 3:00 3:00 3:00

Total 6 TOTAL PLANNED MAINTENANCE MANHOURS 20:30:00 20.45% 2:30:00 4:00:00 7:00:00 7:00:00 0:00:00

UN-PLANNED MAINTENANCE
Urgent
2 0
TOTAL URGENT 0 0.00% 0:00 0:00 0:00 0:00 0:00
Emergency
1 0
TOTAL EMERGENCY 0 0.00% 0:00 0:00 0:00 0:00 0:00
TOTAL UN-PLANNED WORK. MANHOURS 0 0.00% 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00

PROACTIVE MAINTENANCE/PREDICTIVE MAINTENANCE

Total 0 TOTAL PROACTIVE MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

PROJECT MAINTENANCE / WO OUTAGE

Total 0 TOTAL PROJECT MAINTENANCE MANHOURS 0:00:00 0.00% 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00

OTHER PLANNED ACTIVITIES


1 Inventarisasi Asset Tetap 3 2:00 6:00 MRF,SJP,IND 0:30 1:00 1:30 1:30 1:30
2 Briefing Pagi Area 2 0:45 1:30 ALL 1:30
3 COC 3 0:45 2:15 ALL 2:15
4 Kegiatan Senam Bersama 4 1:00 4:00 ALL 4:00

Total 4 TOTAL OTHER PLANNED ACTVITIES. MANHOURS 13:45:00 13.72% 2:00 3:15 1:30 1:30 5:30

TOTAL MANHOURS SCHEDULED 82:25:00 82.21% 7:30:00 13:15:00 20:00:00 21:40:00 20:00:00
88% 79% 80% 87% 80%

TOTAL SCHEDULED 82:25:00

82.21%
TOTAL WO SCHEDULED 40
Sabtu Minggu Actual
25-Dec-21 26-Dec-21 Hours %
4:15:00 100.00
24:00:00 100.00
32:00:00 100.00
40:00:00 100.00
0:00:00 0:00:00 100:15:00 2400:00:00

82.21%
Sabtu Minggu Problem Rencana
Completed Man Actual
Hours Assigned Crew Review Failure Tindak
Lanjut
25-Dec-21 26-Dec-21

0:00 0:00 0:00 0:00

Sabtu Minggu

0:00:00 0:00:00 0:00

0:00 0:00 0
0:00 0:00 0
0:00:00 0:00:00 0

0:00 0:00 0:00

0:00:00 0:00:00 0:00

#REF! #REF! #REF! #REF!

#REF! #REF! TOTAL ACTUAL MAN HOURS


#REF! #REF! #REF!

82.21% PLANNING
COMPLIANCE #REF! 68:40:00 0.6849543
WEEKLY MAINTENANCE SCHEDULE
TEAM : PEMELIHARAAN LISTRIK PLTU SUPERVISOR : MARNO SISWANTO
Senin Selasa Rabu Kamis Jum'at
WEEK : 51
20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
1 MARNO SISWANTO SP 20:05:00 MS 3:00 5:50 5:00 2:30 3:45
2 NUR CAHYA ADI TS 0:00:00 ADI 0:00 0:00 0:00 0:00 0:00

NORMAL AVAILABILITY MANHOURS 20:05:00 80.91% 3:00:00 5:50:00 5:00:00 2:30:00 3:45:00
JOB LOADING 83% 81% 80% 80% 80%

Line Crew Clock Senin Selasa Rabu Kamis Jum'at


Item WO NUM Job Description Size Hours Man Hours Assigned Crew
20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
PREVENTIVE MAINTENANCE
1 PM-76943 202137498 3 LR-Performance Test Fire Pump PLTU 1 1:00 1:00 1:00
2 PM-66304 202137497 3 LR-PLTU 3 PEMELIHARAAN DIESEL EMERGENCY ( 1W ) 1 1:00 1:00 1:00
3 PM-LTL03025 202048097 3 LR-PLTU 3 Pemeliharaan  Generator (24W) 1 1:00 1:00 1:00
4 PM-LTL03045 202137500 3 LR-PLTU 3 Pemeliharaan Generator Transformer 3 PLTU 3 (4W) 1 1:00 1:00 1:00
5 PM-LTL03071 202123555 3 LR-PLTU 3 Pemeliharaan  Power Panel TS - 2 PLTU 3 (12W) 1 1:00 1:00 1:00
6 PM-LTL03074 202123558 3 LR-PLTU 3 Pemeliharaan  MDCP 3 PLTU 3 (12W) 1 1:00 1:00 1:00
7 PM-LTL03079 202116829 3 LR-PLTU 3 Pemeliharaan Control Air Compressor Motor (12W) 1 1:00 1:00 1:00
8 PM-LTL03054 202137501 3 LR-PLTU 3 Pemeliharaan Switch Gear 3A PLTU 3 (24W) 1 1:00 1:00 1:00
9 PM-LTL03055 202137502 3 LR-PLTU 3 Pemeliharaan Switch Gear 3B PLTU 3 (24W) 1 1:00 1:00 1:00
10 PM-LTL03076 202045682 3 LR-PLTU 3  Pemeliharaan Inverter  PLTU 3 (24W) 1 1:00 1:00 1:00

Total 10 TOTAL PM MANHOURS 10:00:00 49.79% 2:00 2:00 2:00 2:00 2:00
12
WO NUM Priority Type Job Description Crew Clock Man Hours Assigned Crew Senin Selasa Rabu Kamis Jum'at
Size Hours
PLANNED MAINTENANCE
1 202123655 3 CD PLTU 3 : Sootblower System: Sootblower 6A indikasi motor overload 1 2:00 2:00 2:00
2 202134223 3 CD PLTU 3 : Lampu stack tidak nyala 1 2:00 2:00 2:00

Total 2 TOTAL PLANNED MAINTENANCE MANHOURS 4:00:00 19.92% 0:00 2:00 2:00 0:00 0:00

UN-PLANNED MAINTENANCE
Urgent
2 0
TOTAL URGENT 0 0.00% 0:00 0:00 0:00 0:00 0:00
Emergency
1 0
TOTAL EMERGENCY 0 0.00% 0:00 0:00 0:00 0:00 0:00
TOTAL UN-PLANNED WORK. MANHOURS 0 0.00% 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00
PROACTIVE MAINTENANCE/PREDICTIVE MAINTENANCE

Total 0 TOTAL PROACTIVE MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

PROJECT MAINTENANCE / WO OUTAGE

Total 0 TOTAL PROJECT MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

OTHER PLANNED ACTIVITIES


1 Briefing Pagi Area 1 0:30 0:30 ALL 0:30
2 COC 1 0:45 0:45 ALL 0:45
3 Kegiatan Senam Bersama 1 1:00 1:00 ALL 1:00

Total 3 TOTAL OTHER PLANNED ACTVITIES. MANHOURS 2:15:00 11.20% 0:30 0:45 0:00 0:00 1:00

TOTAL MANHOURS SCHEDULED 16:15:00 80.91% 2:30:00 4:45:00 4:00:00 2:00:00 3:00:00
83% 81% 80% 80% 80%
TOTAL SCHEDULED 16:15:00

80.91
TOTAL WO SCHEDULED 12
Sabtu Minggu Actual

25-Dec-21 26-Dec-21 Hours


20:05:00
0:00:00

0:00:00 0:00:00 20:05:00


80.91%
Sabtu Minggu Completed Man
Hours
25-Dec-21 26-Dec-21

0:00 0:00 #REF!

Sabtu Minggu

0:00 0:00 0:00

0:00 0:00 0

0:00 0:00 0
0:00:00 0:00:00 0

0:00 0:00 0:00:00

0:00 0:00 0:00:00

0:00 0:00 #REF!


0:00:00 0:00:00 TOTAL ACTUAL MAN HOURS
#DIV/0! #DIV/0! #REF!
80.91% PLANNING
COMPLIANCE
Actual

%
100.00
#DIV/0!

100.00
80.91%
Actual Problem Rencana
Assigned Review Tindak
Crew Failure
Lanjut

#REF!

0:00

0
0

0:00:00

0:00:00

#REF!
CTUAL MAN HOURS
#REF!
#REF!
WEEKLY MAINTENANCE SCHEDULE
TEAM: PEMELIHARAAN LISTRIK BBT BOP SUPERVISOR : IMAM MUTTAQIN

Senin Selasa Rabu Kamis Jum'at


WEEK : 51 20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
1 IMAM MUTTAQIN SP 1:00:00 IMUT CT CT CT 0:00 1:00
2 ARIS RUSDIONO TS 40:00:00 DION 8:00 8:00 8:00 8:00 8:00
3 ROBBY ABDILAH MALIK T 32:00:00 RAM CT 8:00 8:00 8:00 8:00
NORMAL AVAILABILITY MANHOURS 73:00:00 81.51% 8:00:00 16:00:00 16:00:00 16:00:00 17:00:00

JOB LOADING 75% 81% 78% 81% 88%

Line Clock Senin Selasa Rabu Kamis Jum'at


Item WO NUM Job Description Crew Size Hours Man Hours Assigned Crew
20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
PREVENTIVE MAINTENANCE
1 PM-ATL10052 202137490 3 BOP LR-PM Diesel Driven Fire Pump (1W) 1 1:00 1:00 1:00
2 PM-LTL20191 202137496 3 LR - PEMELIHARAAN MOTOR MIXER CHEMICAL DESALINATION A ( 4W ) 1 1:00 1:00 1:00
3 PM-LTL20167 202137492 3 LR-DESAL B PEMELIHARAAN MOTOR CONDENSATE PUMP  1 2:00 2:00 2:00
4 PM-LTL20168 202137493 3 LR-DESAL B PEMELIHARAAN MOTOR DISTILLATE PUMP  1 2:00 2:00 2:00
5 PM-LTL20169 202135419 3 LR-DESAL B 5S  BALL CLEANING PUMP AREA 1 1:00 1:00 1:00
6 PM-LTL20170 202135420 3 LR-DESAL B PEMELIHARAAN MOTOR BRINE BLOWDOWN PUMP 1 2:00 2:00 2:00
7 PM-LTL20171 202137494 3 LR-DESAL B PEMELIHARAAN MOTOR CHEMICAL INJECTION PUMP 2B1  1 2:00 2:00 2:00
8 PM-LTL20172 202137495 3 LR-DESAL B PEMELIHARAAN MOTOR CHEMICAL INJECTION PUMP 2B2  1 2:00 2:00 2:00
9 PM-LTL20174 202135423 3 LR-DESAL B PEMELIHARAAN POWER SUPPLY PLC 1 2:00 2:00 2:00
10 PM-LTL20175 202135424 3 LR - PEMELIHARAAN POWER PANEL DESALINATION B 1 2:00 2:00 2:00
11 PM-ATL20101 202137491 3 LR -  PEMELIHARAAN SYSTEM DRAINASE POLDER 1  (1 WEEKS) 1 1:00 1:00 1:00
12 PM-ATL20103 202135414 3 LR - PEMELIHARAAN SYSTEM DRAINASE POLDER  4 (1WEEKS) 1 1:00 1:00 1:00
13 PM - ATL20237 202135476 3 LR - PEMELIHARAAN SYSTEM DRAINASE POLDER  3  (1WEEKS) 1 1:00 1:00 1:00
14 PM - ATL20238 202135478 3 LR - PEMELIHARAAN SYSTEM DRAINASE POLDER  6  (1WEEKS) 1 1:00 1:00 1:00
15 PM-ATL20112 202135415 3 LR -  PEMELIHARAAN SYSTEM DRAINASE POLDER 5  (1 WEEKS) 1 1:00 1:00 1:00

Total 15 TOTAL PM MANHOURS 22:00:00 30.14% 0:00 2:00 5:00 8:00 7:00

WO NUM Priority Type Job Description Crew Size Clock Man Hours Assigned Crew Senin Selasa Rabu Kamis Jum'at
Hours
PLANNED MAINTENANCE
1 202136708 3 CD Com GU lampu penerangan jalan area blok 2 banyak yang mati. area gelap 1 2:00 2:00 2:00
2 202136692 3 CD Com GU Lampu penerangan jalan depan area tanki HSD dan parkir sepeda CCR mati 1 2:00 2:00 2:00
3 202136149 3 CD COMMON-GU Breaker lampu penerangan jalan sebelah switchyard - fowarding mati 1 2:00 2:00 2:00
4 202135634 3 CD [WO FU] Com GU Perbaikan Pipa sump pump polder 3 bocor 1 4:00 4:00 4:00
5 202138845 3 CD Com GU Mixbed Plant breaker heater tercium bau hangus 1 2:30 2:30 2:30
6 202138848 3 CD Com GU Mixbed Plant Kontaktor untuk pompa ACID pump 1A  ngether/rusak perlu dilakukan pengecekan 1 2:30 2:30 2:30
7 202139381 3 CD [WO FU] BOP Pembuatan Panel kontrol Sump Pump polder 4 1 12:00 12:00 4:00 4:00 4:00

Total 7 TOTAL PLANNED MAINTENANCE MANHOURS 27:00:00 37% 4:00 8:30 6:30 4:00 4:00

UN-PLANNED MAINTENANCE
Urgent
2 0
TOTAL URGENT 0 0.00% 0:00 0:00 0:00 0:00 0:00
Emergency
1 0
TOTAL EMERGENCY 0 0.00% 0:00 0:00 0:00 0:00 0:00
TOTAL UN-PLANNED WORK. MANHOURS 0 0.00% 0:00 0:00 0:00 0:00 0:00
PROACTIVE MAINTENANCE/PREDICTIVE MAINTENANCE

Total 0 TOTAL PROACTIVE MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

PROJECT MAINTENANCE / WO OUTAGE


Total 0 TOTAL PROJECT MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

OTHER PLANNED ACTIVITIES


1 Inventarisasi Asset Tetap 2 2:30 5:00 DION, RAM 1:00 1:00 1:00 1:00 1:00
2 Briefing Pagi Area 2 0:30 1:00 ALL 1:00
3 COC 2 0:45 1:30 ALL 1:30
4 Kegiatan Senam Bersama 3 1:00 3:00 ALL 3:00

Total 4 TOTAL OTHER PLANNED ACTVITIES. MANHOURS 10:30:00 14.38% 2:00 2:30 1:00 1:00 4:00

TOTAL MANHOURS SCHEDULED 59:30:00 81.51% 6:00:00 13:00:00 12:30:00 13:00:00 15:00:00
75% 81% 78% 81% 88%

TOTAL SCHEDULED 59:30:00

81.5
TOTAL WO SCHEDULED 22
Sabtu Minggu Actual
25-Dec-21 26-Dec-21 Hours
1:00:00
40:00:00
32:00:00
0:00 0:00 73:00:00

81.51%
Sabtu Minggu Completed Man
Hours
25-Dec-21 26-Dec-21

0:00 0:00 0:00

Sabtu Minggu

0:00 0:00 0:00

0:00 0:00 0

0:00 0:00 0
0:00 0:00 0

0:00 0:00 0:00:00


0:00 0:00 0:00:00

0:00 0:00 #REF!


0:00:00 0:00:00 TOTAL ACTUAL MAN HOURS
#DIV/0! #DIV/0! #REF!

81.51% PLANNING
COMPLIANCE
Actual
%
100.00
100.00
100.00
100.00

81.51%
Actual Rencana
Assigned Review Problem Tindak
Crew Failure
Lanjut

0:00

0:00

0
0

0:00:00
0:00:00

#REF!
OTAL ACTUAL MAN HOURS
#REF!

#REF!
WEEKLY MAINTENANCE SCHEDULE
TEAM: PEMELIHARAAN LISTRIK BBT INTAKE SUPERVISOR : IMAM MUTTAQIN

Senin Selasa Rabu Kamis Jum'at


WEEK : 51 20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
1 IMAM MUTTAQIN SP 0:00:00 IMUT CT CT CT CT CT
2 FAIZAL AFANDI TS 40:00:00 FZL 8:00 8:00 8:00 8:00 8:00
NORMAL AVAILABILITY MANHOURS 40:00:00 83.13% 8:00:00 8:00:00 8:00:00 8:00:00 8:00:00

JOB LOADING 81% 84% 81% 88% 81%

Line Clock Senin Selasa Rabu Kamis Jum'at


WO NUM Job Description Crew Size Man Hours Assigned Crew
Item Hours
20-Dec-21 21-Dec-21 22-Dec-21 23-Dec-21 24-Dec-21
PREVENTIVE MAINTENANCE
1 PM-57193 202137483 3 LR-Pemeliharaan STATION BATTERY INTAKE ( 2M) 1 1:30 1:30 1:30
2 PM-LTL10078 202133553 3 LR-Pemeliharaan MCC dan PDC Intake blok 1 ( 4W ) 1 1:00 1:00 1:00
3 PM-LTL10067 202137486 3 [INTAKE] LR-Pemeliharaan Motor Injection HCL Hypochlorite 1 1:00 1:00 1:00
4 PM-LTL20022 202137487 3 [INTAKE] LR-Common PLTGU-Pemeliharaan  Motor Sea Water Supply Pump 2A (4W) 1 1:30 1:30 1:30
5 PM-LTL20023 202131028 3 [INTAKE] LR-Common PLTGU-Pemeliharaan  Motor Sea Water Supply Pump 2B (4W) 1 1:30 1:30 1:30
6 PM-LTL10022 202137484 3 [INTAKE] LR-Common PLTGU-Pemeliharaan  Motor Screen Wash Pump 2A (4M) 1 1:30 1:30 1:30
7 PM-LTL10023 202137485 3 [INTAKE] LR-Common PLTGU-Pemeliharaan  Motor Screen Wash Pump 1B (4M) 1 1:30 1:30 1:30
8 PM-LTL24025 202137488 3 LR-STG 2.0 Pemeliharaan Motor Circulating Water Pump 2A ( 4M) 1 1:00 1:00 1:00
9 PM-LTL24026 202137489 3 LR-STG 2.0 Pemeliharaan Motor Circulating Water Pump 2B (4M) 1 2:00 2:00 2:00
10 PM-LTL 10002 202133560 3 Intake PM - Pemeliharaan MBV CWP PLTGU 1 1 2:00 2:00 2:00
11 PM - ATL20239 202137573 3 LR - PEMELIHARAAN SYSTEM DRAINASE POLDER  7-INTAKE (1WEEKS) 1 1:00 1:00 1:00
12 PM-LTL10059 202133550 3 [INTAKE] LR-PLTGU Pemeliharaan dan Test Operasi Crane Circulating Water Pump 1 1:00 1:00 1:00

Total 12 TOTAL PM MANHOURS 16:30:00 41.25% 2:30 2:30 3:00 3:30 5:00

Clock
WO NUM Priority Job Description Crew Size Hours Man Hours Assigned Crew Senin Selasa Rabu Kamis Jum'at
PLANNED MAINTENANCE
1 202139383 3 CD Intake: pemasangan motor Swp 1b 1 6:00 6:00 3:00 3:00
2 202138229 3 CD Com GU Intake Breaker trip, Lampu penerangan TBS tidak bisa dinyalakan 1 3:00 3:00 3:00
3 202137358 3 CD Com GU Intake Tuas breaker TBS 1A patah 1 3:00 3:00 3:00

Total 3 TOTAL PLANNED MAINTENANCE MANHOURS 12:00:00 30% 3:00 3:00 3:00 3:00 0:00

UN-PLANNED MAINTENANCE
Urgent
0
TOTAL URGENT 0 0.00% 0:00 0:00 0:00 0:00 0:00
Emergency
0
TOTAL EMERGENCY 0 0.00% 0:00 0:00 0:00 0:00 0:00
TOTAL UN-PLANNED WORK. MANHOURS 0 0.00% 0:00 0:00 0:00 0:00 0:00
PROACTIVE MAINTENANCE/PREDICTIVE MAINTENANCE

Total 0 TOTAL PROACTIVE MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

PROJECT MAINTENANCE / WO OUTAGE

Total 0 TOTAL PROJECT MAINTENANCE MANHOURS 0:00:00 0.00% 0:00 0:00 0:00 0:00 0:00

OTHER PLANNED ACTIVITIES


1 Inventarisasi Asset Tetap 1 2:30 2:30 FZL 0:30 0:30 0:30 0:30 0:30
2 Briefing Pagi Area 1 0:30 0:30 FZL 0:30
3 COC 1 0:45 0:45 FZL 0:45
4 Kegiatan Senam Bersama 1 1:00 1:00 FZL 1:00

Total 4 TOTAL OTHER PLANNED ACTVITIES. MANHOURS 4:45:00 11.88% 1:00 1:15 0:30 0:30 1:30
TOTAL MANHOURS SCHEDULED 33:15:00 83.13% 6:30:00 6:45:00 6:30:00 7:00:00 6:30:00
81% 84% 81% 88% 81%

TOTAL SCHEDULED 33:15:00

83.13%
TOTAL WO SCHEDULED 15
Sabtu Minggu Actual
25-Dec-21 26-Dec-21 Hours
0:00:00
40:00:00
0:00 0:00 40:00:00

83.13%
Sabtu Minggu Completed Man
Hours
25-Dec-21 26-Dec-21

#REF! #REF! #REF!

Sabtu Minggu

#REF! 0:00 0:00

0:00 0:00 0

0:00 0:00 0
0:00 0:00 0

0:00 0:00 0:00:00

0:00 0:00 0:00:00

0:00 0:00 #REF!


#REF! #REF! TOTAL ACTUAL MAN HOURS
#REF! #REF! #REF!

83.13% PLANNING
COMPLIANCE
Actual
%
#DIV/0!
100.00
100.00

83.13%
Actual Problem Rencana
Assigned Review Tindak
Crew Failure
Lanjut

#REF!

0:00

0
0

0:00:00

0:00:00

#REF!
OTAL ACTUAL MAN HOURS
#REF!

#REF!