SILANGAN MINDANAO MINING COMPANY INC.

TIMAMANA, TUBOD, SURIGAO DEL NORTE

JOB HAZARD ANALYSIS


Project: Desilting of Caga-Asan Creek Work Description : Manual Desilting Date : Aug 26,2022
Project Number: 3  
Location : Brgy. Timamana, Prepared by: Reviewed by: Approved :
Tubod, Surigao del Norte Jebson A. Guhiting Prospero John Jornales Vengel A. Romero
Senior Safety Officer Site General Manager
Reviewed by:
Reviewed by: Department Manager
Joel B. Reyes
Barry M. Azucenas
Safety Manager  
RISK
MITIGATE
CALCULATIO
D RISK
N REMARKS RECOMMENDED CORRECTIVE REMARKS
BASIC JOB STEPS POTENTIAL HAZARD
(Risk Level) MEASURES L (Risk Level)
Lx x
L C C L C C
Inspect the area immediately around the load and
the route for clearance and tripping hazards. Clear
Manual Desilting Slips, Trips & Falls Crush Injury         movable objects from the route. Check for uneven
terrain. Clean up spills that could affect foot
traction.
Low Risk  Awareness and alertness / Wear Appropriate Low Risk
  Laceration 2 2 4 1 1 1
PPE’S

Wear gloves, long sleeve shirt, awareness of


   Insect bites 4 2 8 Significant Risk 4 1 4
surrounding Low Risk

Moderate Risk Low Risk


  Heat Stroke 2 3 6  Proper Hydration and Regular BP Monitoring 2 1 2

If the load must be carried for a long distance, find


  Fatigue location(s) load can be placed to allow for a rest
break. If possible, keep load elevated to avoid
lifting the object to resume moving it.
Flooding of work area due to Low Risk Report impacted area to immediate supervisor, Low Risk
  2 2 4 1 1 1
torrential rain condition awareness of surrounding
 Worker horseplay that may lead Low Risk Immediately report to immediate supervisor, Low Risk
  2 2 4 1 1 1
to potential harm return to respective workstation
  Lightning 2 5 Significant Risk There are two lighting arresters installed in the 1 2 2 Low Risk
SMMCI1-SAH-F-006
SILANGAN MINDANAO MINING COMPANY INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE

Magazine Area, within 150meters range from the


project site.

Remind in every toolbox the emergency response when


lighting occurs, hide/ proceed in a close and low area.
All workers must be familiar on the emergency
response for Typhoon/ Storm Emergency.
1
Thunderstorm 2 5 Significant Risk 1 1 1 Low Risk
0 In this project, work will automatically be suspended
when heavy rain falls since it is in the river.

SMMCI1-SAH-F-006