SILANGAN MINDANAO MINING COMPANY INC.

TIMAMANA, TUBOD, SURIGAO DEL NORTE

JOB HAZARD ANALYSIS


Project: Construction of Silt Trap Work Description : Vegetation Clearing Date : Aug 18,2022
Project Number: 1  
Location : Brgy. Timamana, Prepared by: Approved : Site General
Reviewed by: Senior Safety Officer
Tubod, Surigao del Norte John Jaycoh Verano Manager
Reviewed by: Department Manager
Reviewed by: Safety Manager
Barry M. Azucenas  
RISK
MITIGATE
CALCULATIO
D RISK
N REMARKS RECOMMENDED CORRECTIVE REMARKS
BASIC JOB STEPS POTENTIAL HAZARD L (Risk Level) MEASURES L (Risk Level)
x x
L C C L C C
 Vegetation Clearing  Snake bites 2 2 4 Low Risk Wear Appropriate PPE’S 1 1  1 Low Risk
Wear gloves, long sleeve shirt, awareness of Low Risk
   Insect bites 4 2 8 Significant Risk 3 1 3
surrounding
Low Risk
   Tripping / Slipping 4 2 8 Significant Risk  Surrounding awareness 3 1 3
Low Risk  Awareness and alertness / Wear Appropriate Low Risk
   Skin Cutting 2 2 4 1 1 1
PPE’S
Low Risk  Awareness and alertness, Always wear Hardhat Low Risk
  Falling Hazard 2 2 4 1 1 1
during the activity
 Prone to Heat Stroke during Low Risk Low Risk
  2 2 4  Provide potable water 1 1 1
Sunny Day
Flooding of work area due to Low Risk Report impacted area to immediate supervisor, Low Risk
  2 2 4 1 1 1
torrential rain condition awareness of surrounding
 Worker horseplay that may lead Low Risk Immediately report to immediate supervisor, Low Risk
  2 2 4 1 1 1
to potential harm return to respective workstation
       
Inspect the area immediately around the load and
the route for clearance and tripping hazards. Clear
 Manual Hauling and Lifting Slips, Trips & Falls Crush Injury         movable objects from the route. Check for uneven
terrain. Clean up spills that could affect foot
traction.

SMMCI1-SAH-F-006
SILANGAN MINDANAO MINING COMPANY INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE

If the load must be carried for a long distance, find


Fatigue location(s) load can be placed to allow for a rest
break. If possible, keep load elevated to avoid
lifting the object to resume moving it.
 
           

SMMCI1-SAH-F-006