Date: March 08, 2022

Attention: Mr. Franzberyl Vallenzuela


Logistics Specialist

Quotation UPSTREAM RIVER INSPECTION, PAMULAKLAKIN RIVER

PR no.

Material
Item no. Description Qty unit
unit cost
I UPSTREAM RIVER INSPECTION
MANPOWER FOR THE REMOVAL OF TRASH, DEBRIS, ETC 3 -
TOOLS 1.0 LOT

II OVERHEAD EXPENSES
MOBILIZATION and DEMOBILIZATION 1.0 LOT
SAFETY ITEMS / PPE'S 1.0 LOT
Office Supplies 1.0 lot 150.00

TOTAL COST
LESS: DISCOUNT

TOTAL BILLING COST AFTER DISCOUNT

Submitted by: Ms. Joie Paje


Labor/ labor/
material Total Total
Installation installation TOTAL
unit cost direct cost direct cost Direct cost Indirect cost

1,950.00 - 1,950.00 1,950.00 650.00 2,600.00


500.00 - 500.00 500.00 250.00 750.00
3,350.00

1,000.00 200.00 1,200.00


800.00 200.00 1,000.00
150.00 150.00 10.00 160.00
2,360.00

5,710.00
- 210.00

5,500.00