Workflow Overview

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Design pressure× In

diameter ≧3000 or

Local

Local or not

Outsid
e Design pressure× In
diameter ≧3000 or
Design a
≧3000 SHOP H

Functiona
Design pressure× Internal
iameter ≧3000 or < 3000 Design approval shall
Application document
SHOP HT shall be don
<3000 Fifth schedule and MR
Permit to install to be
Functional test to be c

Design approval shal


≧3000

Functional test inclu


Design pressure× Internal
iameter ≧3000 or < 3000

<3000 Design approval shall

Functional test inclu


Design approval shall be issued prior to manifacturing with drawings and c
Application documents shall be endorsed by TPIA
SHOP HT shall be done under witness by TPIA and DOSH officer (HT at sit
Fifth schedule and MRB to be collected to use during Fuctional te
Permit to install to be submited before site installation.
Functional test to be conducted at site (DOSH witness) before obtain Certifi

sign approval shall be issued prior to manifacturing with drawings and calculation she
plication documents shall be endorsed by TPIA
OP HT shall be done under witness by TPIA and DOSH officer (HT at site is not needed
h schedule and MRB to be collected to use during Fuctional test at site
mit to install to be submited before site installation.
nctional test to be conducted at site (DOSH witness) before obtain Certificate of Fitne

esign approval shall be issued prior to shipment to Malaysia with drawings, calculation
and MRB (all endosed by ATPIA)
Application documents shall be endorsed by TPIA
SHOP HT shall be done under witness by TPIA
Permit to install shall be issued prior to installation.
unctional test including HT at site shall be done under witness by DOSH officer before
Fitness (CF)

sign approval shall be issued prior to shipment to Malaysia with drawings, calculation
and MRB
Application documents aren't needed to be endorsed by TPIA
HT shall be done and certified by themselves.
Permit to install shall be issued prior to installation.
unctional test including HT at site shall be done under witness by DOSH officer before
Fitness (CF)
ith drawings and calculation sheets
dorsed by TPIA
H officer (HT at site is not needed)
during Fuctional test at site
e site installation.
efore obtain Certificate of Fitness (CF)

and calculation sheets

t site is not needed)


site

Certificate of Fitness (CF)

rawings, calculation sheets, fifth schedule


A)
sed by TPIA
s by TPIA
installation.
DOSH officer before obtain Certificate of

awings, calculation sheets, fifth schedule

endorsed by TPIA
mselves.
installation.
DOSH officer before obtain Certificate of