TIRUMALA GENERAL CONTRACTOR PTE LTD

113 PotongPasir Ave1 #03-832 Singapore – 350113 Email:anbutirumala2018@gmail.com


Company Reg No:201815447W

Dhanabal Silambarasan Approved by:


Company: Tirumala General Contractor Pte Ltd RA Leader:
(Site Supervisor)
RA 013 – Roller and Brush Painting Subbiah Murugesan
Process: RA Member 1:
on Internal & External Surfaces (Safety Supervisor)

Krishnana Senthilkumar
Process/Activity Location: Painting Work For Car Park RA Member 2:
Signature

Original Assessment Date: 20 Aug 2020 RA Member 3: Arumugam Vikram Name: Kumarappan Anbu

Last Review Date: 19 Aug 2021 RA Member 4: Karuppiah Mahendran Designation: Director

Next Review Date: 19Aug 2022 RA Member 5: Seenivasan Manikandan Date: 20 Aug 2021

HAZARD IDENTIFICATION RISK EVALUATION RISK CONTROL

Implemented
Existing risk

Risk Level

Additional

evaluation

Due Date
Controls
Activity

controls
Hazard

Hazard
effect
Work

Level
Re -
Ref

S L S L

by
1. Manual Improper Strain or Determine the size, Make use of trolley
transferring of air posture, back injury shape and weight of or pallet- jack to
receiver, incorrect the load and devise deviate manual
materials, paint application of (Workers a safe carrying lifting of formwork
Safety
materials & body force, involves in posture 3 3 9 3 2 6 19/08/2022
Supervisor
sprayer jerking motion transferring
equipment to the or unexpected )
required work movements
location
2. Painting onto the Falling from Fatal, Personnel must put Application for
external wall height from Bodily on their body Permit-to-work for
surface by using scaffolding injury harness with two works above 2
the metal scaffold platform lanyards and shock meters
or mobile scaffold (Workers absorber properly
erected by the carrying anchored to a
Main-Contractor out spray secured point
painting
works) Ensure the use of
proper ladder as a
form of access and
egress from the
Safety
working platform 5 2 10 5 1 5 19/08/2022 Supervisor

Ensure working
platform are
properly secured to
the scaffoldings

For mobile
scaffold:
No worker allow on
the scaffold when
moving from point
A to point B
3. Painting onto the Falling from Fatal, All platforms must Ensure the tag ‘Safe
external wall height due to Bodily be erected by to Use’ tag is
surface by using collapse of injury certified scaffold displayed on the
the metal scaffold scaffold erectors and scaffold prior to use
or mobile scaffold platform (Workers inspected and
erected by the carrying signed by certified
Main-Contractor out spray scaffold supervisors
(cont) painting
works / Working platforms
workers shall be inspected
working once in 7 days by a Safety
5 2 10 5 1 5 19/08/2022
around the competent Supervisor
vicinity) personnel / scaffold
Supervisor

Working platforms
shall be inspected
after adverse
weather condition
by a competent
personnel / scaffold
Supervisor
Falling object Head Ensure that all Barricade working
or tools injuries working platform zone to prevent
are equipped with unauthorized entry
(Workers toe -boards (more into working area
working than 90mm)
around the
vicinity) To carry working
tools in proper
buckets, waist
pouches, containers Safety
3 2 6 3 2 6 19/08/2022
or tool belts Supervisor

To tie all long


materials to
guardrails of
scaffolds or set
down on
floorboards for all
other loose
materials
3. Painting onto the Falling from Electrocuti All electrical Ensure that a
external wall height due to on, Bodily powered tool is to physical check on the
surface by using electrical Injuries be inspected by components of the
the metal scaffold shock from L.E.W. and colour electrical tools is
or mobile scaffold usage of (Workers coded monthly conducted prior to
erected by the electrical tools carrying commencement of
Main-Contractor out spray Ensure all cables work
(cont) painting are fully insulated,
works) exposed / defective
Safety
cables should be 4 2 8 4 1 4 19/08/2022 Supervisor
replaced
immediately

Ensure workers
working on the
platform have their
safety harness
anchor to a secure
point
4. Painting onto the Falling from Fatal, Site supervisor to Application for
external wall height from Bodily ensure all personnel Permit-to-work for
surface at height scissor lift injury work on machine works above 2
using scissor lift cage must be meters
provided by (Workers equipped with the
Main-Contractor carrying appropriate safety Supervisor /
out spray hardness with competent person to
painting carabineer, double conduct pre-
works) lanyards and shock inspection of the
absorber. machinery prior to
work commencement Safety
5 2 10 5 1 5 19/08/2022
Site and safety Supervisor
supervisor to
ensure workers do
not stand on
mid/top rail of
machine cage.

Operator to ensure
no materials are
blocking the path of
the machine
4. Painting onto the Workers Bodily Site supervisor to Supervisor to ensure
external wall caught in injury ensure banks-man only trained /
surface at height between by is deployed to competent personnel
using scissor lift elevating / (Workers scissor lift during who had attended
provided by moving scissor carrying operation/ moving and obtained the
Main-Contractor lift out spray scissor lift training
(cont) painting Banks-man to course conducted by
works) ensure the area is accredited company
free from human to operate the
traffic before machinery
giving signal to
operator to move Application for
on Permit-to-work for Safety
4 2 8 4 1 4 19/08/2022
works above 2 Supervisor
Banks-man to be meters
familiarise with the
emergency shut-
off switch outside
the basket

Site supervisor to
ensure that the
scissor lift is
elevated in down
position before it
can move
Toppling of Bodily Site supervisor to Supervisor /
scissor lift injury ensure operator competent person to
follow the SWL on conduct pre-
(Workers the scissor lift to inspection of the
carrying prevent overloading machinery prior to
out spray work commencement
Safety
painting Banks-man to 4 2 8 4 1 4 19/08/2022 Supervisor
works / ensure that scissor
workers lift do not access
working steep slope / ramp
around the
vicinity)
4. Painting onto the Toppling of Bodily Banks-man to Supervisor /
external wall scissor lift injury ensure operator do competent person to
surface at height (cont) not operate on a conduct pre-
using scissor lift (Workers unlevelled ground inspection of the
provided by carrying condition machinery prior to
Main-Contractor out spray work commencement
Safety
(cont) painting Banks-man to 4 2 8 4 1 4 19/08/2022 Supervisor
works / ensure scissor lift
workers do not run over the
working building edge
around the
vicinity)
(cont)
Falling object Head Ensure that all Barricade working
or tools from injuries working platform zone to prevent
working are equipped with unauthorized entry
platform (Workers toe -boards (more into working area
carrying than 90mm)
out spray
painting To carry working
works / tools in proper
workers buckets, waist
working pouches, containers Safety
4 2 8 4 1 4 19/08/2022
around the or tool belts Supervisor
vicinity)
To tie all long
materials to
guardrails of
scissor lifts or set
down on
floorboards for all
other loose
materials
4. Painting onto the Falling from Electrocuti All electrical Ensure that a
external wall height due to on, Bodily powered tool is to physical check on the
surface at height electrical Injuries be inspected by components of the
using scissor lift shock from L.E.W. and colour electrical tools is
provided by usage of (Workers coded monthly conducted prior to
Main-Contractor electrical tools carrying commencement of
(cont) out spray Ensure all cables work
painting are fully insulated,
works) exposed / defective
Safety
cables should be 4 2 8 4 1 4 19/08/2022 Supervisor
replaced
immediately

Ensure workers
working on the
platform have their
safety harness
anchor to a secure
point
5. Painting onto the Falling from Fatal, Site supervisor to Application for
external wall height from Bodily ensure all personnel Permit-to-work for
surface at height boom lift injury work on machine works above 2
using boom lift cage must be meters
provided by (Workers equipped with the
Main-Contractor carrying appropriate safety Supervisor /
out spray hardness with competent person to
painting carabineer, double conduct pre-
Safety
works) lanyards and shock 5 2 10 inspection of the 5 1 5 19/08/2022 Supervisor
absorber. machinery prior to
work commencement
Site and safety
supervisor to
ensure workers do
not stand on
mid/top rail of
machine cage.
5. Painting onto the Falling from Fatal, Operator to ensure Application for
external wall height from Bodily no materials are Permit-to-work for
surface at height boom lift injury blocking the path of works above 2
using boom lift (cont) the machine meters
provided by (Workers
Safety
Main-Contractor carrying Scissor lifts are to 5 2 10 Supervisor / 5 1 5 19/08/2022 Supervisor
(cont) out spray be lowered before competent person to
painting commencement of conduct pre-
works) any movement inspection of the
from point to point machinery prior to
work commencement
Workers Bodily Site supervisor to Supervisor to ensure
caught in injury ensure banks-man only trained /
between by is deployed to competent personnel
elevating / (Workers boom lift during who had attended
moving boom carrying operation/ moving and obtained the
lift out spray boom lift operator
painting Banks-man to course conducted by
works) ensure the area is accredited company
free from human are authorized to
traffic before operate the
giving signal to machinery
operator to move
on Application for Safety
4 2 8 4 1 4 19/08/2022
Permit-to-work for Supervisor
Banks-man to be works above 2
familiarise with the meters
emergency shut-
off switch outside
the basket

Site supervisor to
ensure that the
boom lift is
elevated in down
position before it
can move
5. Painting onto the Toppling of Bodily Site supervisor to Supervisor /
external wall boom lift injury ensure operator competent person to
surface at height follow the SWL on conduct pre-
using boom lift (Workers the boom lift to inspection of the
provided by carrying prevent overloading machinery prior to
Main-Contractor out spray work commencement
(cont.) painting Banks-man to
works / ensure that boom
workers lift do not access
working steep slope / ramp
Safety
around the 4 2 8 4 1 4 19/08/2022 Supervisor
vicinity) Banks-man to
ensure operator do
not operate on a
unlevelled ground
condition

Banks-man to
ensure boom lift do
not run over the
building edge
Falling object Head Ensure that all Barricade working
or tools from injuries working platform zone to prevent
working are equipped with unauthorized entry
platform (Workers toe -boards (more into working area
carrying than 90mm)
out spray
painting To carry working
works / tools in proper
workers Buckets, waist
Safety
working pouches, containers 4 2 8 4 1 4 19/08/2022 Supervisor
around the or tool belts
vicinity)
To tie all long
materials to
guardrails of boom
lifts or set down on
floorboards for all
other loose
materials
5. Painting onto the Falling from Electrocuti All electrical Ensure that a
external wall height due to on, Bodily powered tool is to physical check on the
surface at height electrical Injuries be inspected by components of the
using boom lift shock from L.E.W. and color electrical tools is
provided by usage of (Workers coded monthly conducted prior to
Main-Contractor electrical tools carrying commencement of
(cont.) out spray Ensure all cables work
painting are fully insulated,
works) exposed / defective
Safety
cables should be 4 2 8 4 1 4 19/08/2022 Supervisor
replaced
immediately

Ensure workers
working on the
platform have their
safety harness
anchor to a secure
point
6. Spraying and Falling from Fatal, Site and safety Application for
painting the paint height from Bodily supervisor to Permit-to-work for
material onto the ladder injury ensure workers do works
internal wall not stand on the top
/ceiling surface by (Workers 3 steps of the Ladder must be
using “A” frame carrying ladder. inspected by main
ladder. out spray contractor safety
painting/pai The top 3 steps of department and
(Only when nting the ladder must be issue:
mobile scaffold is works) seal off. * Safe to use tag
NOT * Monthly inspection Safety
5 2 10 5 1 5 19/08/2022
APPLICABLE) To practiced buddy Color code sticker Supervisor
system when using to
ladder. Display on the
Ladder.
Do not use ladder
at : Use only carbon
* Edge of building fibre made ladder.
* Near floor
opening Daily inspection by
* Open side site safety supervisor
for safe to use.
Falling object Head To carry working Barricade working
or tools from injuries tools in proper zone to prevent
ladder. buckets, waist unauthorized entry
(Workers pouches, containers into working area
carrying or tool belts
out spray
painting Safety
4 2 8 4 1 4 19/08/2022
and Supervisor
painting
works /
workers
working
around the
vicinity)
6. Spraying and Falling from Electrocuti All electrical Ensure that a
painting the paint height due to on, Bodily powered tool is to physical check on the
material onto the electrical Injuries be inspected by components of the
internal wall shock from L.E.W. and colour electrical tools is
/ceiling surface by usage of (Workers coded monthly conducted prior to
using “A” frame electrical tools carrying commencement of
ladder. (cont) out spray Ensure all cables work
painting are fully insulated,
(Only when works) exposed / defective Safety
4 2 8 4 1 4 19/08/2022
mobile scaffold is cables should be Supervisor
NOT replaced
APPLICABLE) immediately

Air receiver to be
tested by qualified
personnel and
provide testing
certificate.
7. Spraying and Electrocution Electrocuti All electrical Ensure that a
painting the paint from usage of on, Bodily powered tool is to physical check on the
material onto the electrical tools Injuries be inspected by components of the
internal wall L.E.W. and colour electrical tools is
/ceiling surface on (Workers coded monthly conducted prior to
ground level carrying commencement of
out spray Ensure all cables work
painting/pai are fully insulated,
nting exposed / defective Safety
4 2 8 4 1 4 19/08/2022
works) cables should be Supervisor
replaced
immediately

Air receiver to be
tested by qualified
personnel and
provide testing
certificate.
7. Spraying and Contact with Skin Ensure wearing of Ensure tool box
painting the paint additive / paint irritation / long sleeves and meeting conducted
material onto the / resin abrasion / pants to reduce skin by the site supervisor
internal wall chemical/spray inflammati exposure prior to work
/ceiling surface on mist on commencement
ground level Ensure workers are
(cont) (Worker equipped with Always remind
mixing the alkali resistant workers to wash their
chemical) gloves hands and face
Safety
2 3 6 before eating, 2 3 6 19/08/2022 Supervisor
Wear safety glasses drinking, smoking or
with side shields to using the toilet at the
protect the eyes or end of the day
if it’s very dusty,
use goggles. Conduct tool box
meeting on first aid
Wear approved procedure/SDS.
respirator for
spraying work.
Trip and fall Cut / Ensure working Ensure that a
abrasion area is free tripping physical check on the
(Workers hazard. working area is
carrying conducted prior to Safety
2 3 6 2 3 6 19/08/2022
out spray Ensure that there is commencement of Supervisor
painting/pai no floor opening work
nting around the working
works) area
8. Using of air Falling object Head Ensure that all Barricade working
receiver to carry or tools from injuries working platform zone to prevent
out spraying work working are equipped with unauthorized entry
platform (Workers toe -boards (more into working area
(Using scaffold, carrying than 90mm)
scissor lift, boom out spray Safety
4 2 8 4 1 4 19/08/2022
lift) painting To carry working Supervisor
works / tools in proper
workers buckets, waist
working pouches, containers
around the or tool belts
vicinity)
8. Using of air Falling object Head To tie all long Barricade working
receiver to carry or tools from injuries materials to zone to prevent
out spraying work working guardrails of unauthorized entry
platform (cont) (Workers working access or into working area
(Using scaffold, carrying set down on
scissor lift, boom out spray floorboards for all Safety
4 2 8 4 1 4 19/08/2022
lift) (cont) painting other loose Supervisor
works / materials
workers
working
around the
vicinity)
9. Storage of paint Fire hazard Burnt, All chemical and Ensure that there is
from solvent Explosion, solvent-based paint no “HOT WORK”
based material Damaged must be store at around storage.
to property chemical storage
area allocated by “NO SMOKING” at
(Workers main contractor. storage area and to
around also display proper
storage Approved type of signage.
area) fire extinguisher Safety
4 2 8 4 1 4 19/08/2022
and FIRST AID Supervisor
BOX must be in
place at storage
area.

Proper
housekeeping must
be maintained at all
times.
10. Maintenance of Unsafe Cuts, All electrical tools Ensure that a
equipment and working Lacerations must be check by physical check on the
tools condition due , approved LEW and components of the
to faulty Electrocuti color coded electrical tools is
equipment and on monthly conducted prior to Safety
4 2 8 4 1 4 19/08/2022
tools commencement of Supervisor
(Workers All moving parts of work
using the tools must be
equipment guarded.
and tools)
11. Working in high Heat Stroke Workers Encourage workers Brief workers on
temperature/humi suffer to drink water sign of heat stroke
dity nausea, and first aid Safety
4 2 8 4 1 4 01/02/2021
headache, Ensure working procedures Supervisor
fainting and area is ventilated
transient.