Professional Documents
Culture Documents
MSC 7006 20212095
MSC 7006 20212095
Student ID (UWIC
ID and Cardiff Met ID : 20212095 ICBT ID : CL/MPM/02/17
ICBT ID)
Batch No 02
Assignment Details
Declaration
I certify that the attached material is my original work. No other person’s work or ideas
have been used without acknowledgement. Except where I have clearly stated that I have
used some of this material elsewhere, I have not presented it for examination / assessment
in any other course or unit at this or any other institution
Strengths
Weaknesses
Comments by IV
CL/MPM/02/17 Page |3
20212095 MPM7006
CL/MPM/02/17 Page |4
CAPABILITY MATURITY MODEL INTEGRATION (CMMI)
Talliance Pvt. Ltd.
MPM7006 Project Management Innovations
Organizations are keen to deliver quicker, affordable and enhanced products and services therefore an Death Care Solutions Development Project in Colombo.
approach is formed to control and manage this difficult development and maintenance process.
which is aware with choosing numerous process areas to develop For example specific • CMMI Product Team, 2010. CMMI for Development, Version 1.3. New York: Software Engineering Insitute.
• The completion process has become less time consuming and • Gibson, D. L. & Kost, K., 2006. Performance Results of CMMI®Based Process Improvement. ResearchGate.
within a maturity level. (Project Management Academy, 2011) practices by goal for affordable.
•
•
Gomes, J. & Romão, M., 2013. Linking Benefits to Maturity Models. ResearchGate.
Keshta, I., 2019. A model for defining project lifecycle phases: Implementation of CMMI level 2 specific practice. Semantic
Maturity 2 – SG 1 REQM is as Recent introduction of CMMI tools such as (Martins, 2018): •
Scholar.
Khare, R., 2013. Advantages and Disadvantages of CMMI-DEV for a Software Development IT Organization. CMMI Consultant
Impacts of CMMI towards the Project follows: • The CMMI Toolkit: a set of correlated documents with easily
Blog.
• Mahmood, S., 2019. Capability Maturity Model Integration. ResearchGate, Volume 3.
The Figure 2 demonstrates a combined target & achievement obtainable guidelines & process in a hierarchical manner. • Martins, P., 2018. CMMI Implementation and Results: The Case of a Software Company. ResearchGate.
• Project Management Academy, 2011. Project Management Maturity - Where Does Your Organization Fall?. [Online]
profile of the project. The blue portion on each bar shows what’s • Understand the requirements. • ManageHub: helps to achieve streamlined appraisal & ROI by Available at: https://projectmanagementacademy.net/articles/project-management-maturity/
• Project Management Insitute, 2019. Mapping CMMI to Disciplined Agile, s.l.: PMI.
been achieved while unshaded portion shows the remaining portion • Commit to requirements. Figure 3: CMMI Practices. utilizing a library with capabilities such as low cost, easy • Watts, S., 2020. CMMI: An Introduction to Capability Maturity Model Integration. bmc blogs, 19 02.
• White, S. K., 2021. What is CMMI? A model for optimizing development processes. CIO.
to accomplish to meet the target profile. • Manage changes in requirements. deployment. • Yan, B. M. & Ester, S., 2004. Project management for software process improvement. Newtown Square, PA, Project Management
Institute.
• Sustain traceability of requirements. The version CMMI 1.3 which was released in 2010, its implementation • Zubrow, D., 2021. Current Trends in the Adoption of the CMMI® Product Suite. ACM.
• Identify conflicts between project work & requirements. model designed in an agile context.