Maintenance Register Cantilever Assembly

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

TMS Reports CANTILEVER MAINTENANCE REGISTE

South Eastern Railway

Division: CKP Report for: All Section & Station

INSPID SNo LOCATION No. SECTION/STATION LINE/LOOPLINE CANTILEVER LOCATION LINE TYPE INSPECTION DATE INSPECTION TYPE POWER BLOCK SUPERVISOR CONTACT WIRE HEIGHT (meters) CONTACT WIRE MAKE CATENARY WIRE HEIGHT (meters) CONTACT WIRE STAGGER (mm) ENCUMBERANCE (meters) CONTACT WIRE DIA (mm) FITTING CONDITION REMARKS CONFIRM
1 454/1 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.6 50 Good Confirmed
2 454/10 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.7 50 Good Confirmed
3 454/11 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.65 150 Good Confirmed
4 454/12 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
5 454/13 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
6 454/14 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 300 Good Confirmed
7 454/15 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
8 454/16 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.8 250 Good Confirmed
9 454/17 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
10 454/18 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
11 454/19 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
12 454/2 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.65 250 Good Confirmed
13 454/20 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.8 300 Good Confirmed
14 454/21 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.85 300 Good Confirmed
15 454/22 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
16 454/3 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.65 100 Good Confirmed
17 454/4 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.6 250 Good Confirmed
18 454/5 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.65 150 Good Confirmed
19 454/6 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.7 200 Good Confirmed
20 454/7 BUF-BXF Single Line Loop Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.7 50 Good Confirmed
21 454/8 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 AOH 5.6 150 Good Confirmed
22 454/9 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 AOH 5.7 150 Good Confirmed
23 455/1 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.7 250 Good Confirmed
24 455/10 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.65 150 Confirmed
25 455/11 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.6 200 Confirmed
26 455/12 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.6 250 Good Confirmed
27 455/13 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 AOH N MAHANTA 5.6 100 Good Confirmed
28 455/13 BUF-BXF Single Line OOR Cantilever III Line Conventional 7/23/2021 AOH N MAHANTA 5.65 100 Good Confirmed
29 455/14 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 AOH N MAHANTA 5.65 150 Good Confirmed
30 455/14 BUF-BXF Single Line OOR Cantilever III Line Conventional 7/23/2021 AOH N MAHANTA 5.7 150 Good Confirmed
31 455/15 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 AOH N MAHANTA 5.65 200 Good Confirmed
32 455/15 BUF-BXF Single Line OOR Cantilever III Line Conventional 7/23/2021 AOH N MAHANTA 5.7 200 Good Confirmed
33 455/16 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.7 250 Good Confirmed
34 455/17 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.7 250 Good Confirmed
35 455/18 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.65 250 Good Confirmed
36 455/19 BUF-BXF Single Line Loop Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.7 250 Good Confirmed
37 455/2 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 250 Good Confirmed
38 455/20 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.7 200 Good Confirmed
39 455/21 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.65 250 Good Confirmed
40 455/22 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.65 150 Good Confirmed
41 455/23 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.6 100 Good Confirmed
42 455/24 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.6 100 Good Confirmed
43 455/25 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.55 150 Good Confirmed
44 455/26 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.7 250 Good Confirmed
45 455/27 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.65 200 Good Confirmed
46 455/28 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.65 200 Good Confirmed
47 455/29 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N MAHANTA 5.65 150 Good Confirmed
48 455/3 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N. Mahanta 5.75 250 Good Confirmed
49 455/4 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled N. Mahanta 5.7 200 Good Confirmed
50 455/5 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 200 Good Confirmed
51 455/6 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.7 150 Good Confirmed
52 455/7 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.75 200 Good Confirmed
53 455/8 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.7 200 Good Confirmed
54 455/9 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/23/2021 Unscheduled 5.65 150 Confirmed
55 457/11 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 150 Confirmed
56 457/12 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.75 300 Confirmed
57 457/13 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.65 300 Confirmed
58 457/14 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.65 100 Confirmed
59 457/15 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 300 Confirmed
60 457/16 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 100 Confirmed
61 457/17 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.65 200 Confirmed
62 457/18 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 100 Confirmed
63 458/1 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 200 Confirmed
64 458/10 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 300 Confirmed
65 458/11 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.75 250 Confirmed
66 458/12 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.75 200 Confirmed
67 458/13 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.75 250 Confirmed
68 458/14 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.7 150 Confirmed
69 458/15 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.75 200 Confirmed
70 458/16 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.75 250 Confirmed
71 458/17 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.7 150 Confirmed
72 458/18 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.75 300 Confirmed
73 458/19 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.65 100 Confirmed
74 458/2 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.75 100 Confirmed
75 458/3 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 AOH 5.7 150 Confirmed
76 458/3 BUF-BXF Single Line OOR Cantilever III Line Conventional 8/12/2021 AOH 5.75 150 Confirmed
77 458/3 BUF-KRBU Single Line Main Line Cantilever III Line Conventional 7/2/2021 AOH 5.6 SSEPL 250 Confirmed
78 458/3 BUF-KRBU Single Line OOR Cantilever III Line Conventional 7/2/2021 AOH 5.65 250 Confirmed
79 458/4 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 AOH 5.7 50 Confirmed
80 458/4 BUF-BXF Single Line OOR Cantilever III Line Conventional 8/12/2021 AOH 5.75 50 Confirmed
81 458/4 BUF-KRBU Single Line Main Line Cantilever III Line Conventional 7/2/2021 AOH 5.55 SSEPL 100 Confirmed
82 458/4 BUF-KRBU Single Line OOR Cantilever III Line Conventional 7/2/2021 AOH 5.6 100 Confirmed
83 458/5 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.65 250 Confirmed
84 458/6 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.65 100 Confirmed
85 458/7 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 100 Confirmed
86 458/8 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 200 Confirmed
87 458/9 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/12/2021 Unscheduled 5.7 250 Confirmed
88 459/1 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/28/2021 Unscheduled 5.65 50 Confirmed
89 459/10 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
90 460/10 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled Confirmed
91 460/11 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled Confirmed
92 460/12 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.65 250 Confirmed
93 460/13 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.65 250 Confirmed
94 460/14 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.65 250 Confirmed
95 460/15 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.7 200 Confirmed
96 460/16 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.8 200 Confirmed
97 460/17 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.65 200 Confirmed
98 460/18 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled 5.65 250 Confirmed
99 460/8 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled Confirmed
100 460/9 BUF-BXF Single Line Main Line Cantilever III Line Conventional 8/3/2021 Unscheduled Confirmed
101 462/4 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/6/2021 POH 5.7 150 Confirmed
102 463/5 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/29/2021 POH 5.55 50 Confirmed
103 463/7 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/29/2021 POH 5.6 200 Confirmed
104 463/8 BUF-BXF Single Line Main Line Cantilever III Line Conventional 7/29/2021 POH 5.65 150 Confirmed
105 469/10 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
106 469/11 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
107 469/12 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
108 469/13 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
109 469/14 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
110 469/15 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
111 469/16 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
112 469/17 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
113 469/18 BUF-BXF Single Line Loop Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
114 469/19 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
115 469/20 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
116 469/21 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
117 469/22 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
118 469/23 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
119 469/24 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
120 469/25 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 Unscheduled Confirmed
121 469/9 BUF-BXF Single Line Main Line Cantilever III Line Conventional 9/3/2021 AOH Confirmed
122 473/3 BXF Main Line Cantilever III Line Conventional 9/8/2021 Unscheduled 5.55 300 Saved
123 486/14 BUF-KRBU Single Line Main Line Cantilever III Line Conventional 7/3/2021 AOH N. Mahanta 4.8 150 Confirmed
124 486/14 BUF-KRBU Single Line OOR Cantilever III Line Conventional 7/3/2021 AOH N MAHANTA 4.85 150 Confirmed
125 486/15 BUF-KRBU Single Line Main Line Cantilever III Line Conventional 7/3/2021 AOH N. Mahanta 4.8 150 Confirmed
126 486/15 BUF-KRBU Single Line Main Line Cantilever III Line Conventional 7/3/2021 AOH N MAHANTA 4.8 150 Confirmed
127 486/16 BUF-KRBU Single Line Main Line Cantilever III Line Conventional 7/3/2021 AOH N. Mahanta 4.8 100 Confirmed
128 486/16 BUF-KRBU Single Line OOR Cantilever III Line Conventional 7/3/2021 AOH N MAHANTA 4.85 100 Confirmed

Page 1 of 1