Professional Documents
Culture Documents
Jha Unitec Repair of CR 4 Acs 012123
Jha Unitec Repair of CR 4 Acs 012123
Jha Unitec Repair of CR 4 Acs 012123
Hazard Control
Process Steps Tools & (Provide specific elimination, substitution, engineering and Hazard
Potential Hazards
(Indicate sequence of steps to accomplish the task.) Equipment administrative control to be implemented and include specific Rating
PPE to be used.)
Process of necessary Work Permit Permit Incomplete permit/no work 1.1.1 Secure work permit ahead of time 1
(General Permit)
Screw
2.1.1 Provide the necessary checklist of
Preparation of Equipment, Tool, driver,GE Use of Sub-standard Equipment, tools specific tools and equipments needed for 1
Material, Etc Druck DPI880, & materials
Kimo, Hioki the activity
Multi tester
5.1.1 5S (removed unnecessary materials in
Calibrating Controllers meter, GE Electric shock the area) Wear PPE (safety shoes, hard hat, 5
Druck DPI880,
hand gloves)
Screw Driver
Electronically Approved
_______________________ ______________________ ________________________ ________________________
TIP/ Project In-Charge Department Safety Officer Manager / Supervisor Corporate Safety Officer
(Signature over printed name) (Signature over printed name) (Signature over printed name) (Signature over printed name)
Note: Add another page if necessary. HGA.102.R2
TOSHIBA INFORMATION EQUIPMENT (PHILIPPINES), INC.
JOB HAZARD ANALYSIS
Project Title: REPAIR OF CR 4 AUTOMATIC CONTROL SYSTEM
Supply & Installation of 2 way Bleed-In motorized valves ◦HVAC system Shut down, no AHU supply at the ◦Ensure acurate communications between PIC and area supervisors
(main, Primary & Secondary) ◦Adjustable wrench moment of activity and the work force for the activity
◦Communicate activity ahead of time, purposely scheduled on plants 1
◦Approved permits & communications ◦Burst of pressure due to shut down from the shutdowns
Impairment & Decommissioning of HVAC system supply pipe lines -Secure updated approved work permit
◦Tin snip
◦Riveter ◦Sharp pointed objects, Minor cuts and laceration ◦File sharp edges, cover all pointy protruding items, provision of long
Installation of cladding on primary and secondary piping ◦Electric drill ◦Egonomics (bending and twisting motion, sleeved uniforms, working gloves
◦Proper positioning, do no over reach, streaching before work, job 1
system ◦Extension cord awkward posture) rotation
◦Metro ◦Electric shock ◦Double check electrical tools before using
◦Cutter slicer
◦Paint brush ◦Drips, spills ◦Provision of drip pads and secondary containers, provision of spill kits
Repainting of bracket and supports ◦Paint roller ◦Fume and foul odors (rags, mops, and garbage bags ready for disposal 1
◦Ladder ◦Provison of exhaust fans, work on well ventilated area.
Electronically Approved
_______________________ ______________________ ________________________ ________________________
TIP/ Project In-Charge Department Safety Officer Manager / Supervisor Corporate Safety Officer
(Signature over printed name) (Signature over printed name) (Signature over printed name) (Signature over printed name)
Note: Add another page if necessary. HGA.102.R2
TOSHIBA INFORMATION EQUIPMENT (PHILIPPINES), INC.
JOB
Project Title: REPAIR OF CR 4 AUTOMATIC CONTROL SYSTEM
Supply & Installation of 2 way Bleed-In motorized valves ◦HVAC system Shut down, no AHU
(main, Primary & Secondary) ◦Adjustable wrench moment of activity
◦Approved permits & communications ◦Burst of pressure due to shut do
Impairment & Decommissioning of HVAC system supply pipe lines
◦Fire hazard
◦Angle grinder ◦Damage to property
◦Emergency lights ◦Minor burns and blisters
◦Royal cord extension cord ◦Eye and skin damage
Retrofitting of to be installed valves ◦Metro ◦Electric shock
Measuring and thumb marking of pipes
Cutting and installation of flanges (welding works) ◦Squala ◦Fumes
◦Fire extinguisher ◦Foreign flying objects
◦Welding machine ◦
◦Fire blanket ◦
◦
◦Pipe wrench
◦Adjustable wrench ◦Ergonomics, (twisting and repete
Installation of 2 way isolation motorized valve and ◦Socket wrench bending and over reaching, exces
components ◦Pliers lifting, awkward posture)
Replacement of 2 OAC 2way motorized valves ◦Long Nose pliers ◦Electrocution / electric shock
◦Wire stripper ◦Damage to property
◦Clamp Multi Tester
◦Tin snip
◦Riveter ◦Sharp pointed objects, Minor cut
Installation of cladding on primary and secondary piping ◦Electric drill ◦Egonomics (bending and twisting
system ◦Extension cord awkward posture)
◦Metro ◦Electric shock
◦Cutter slicer
◦Pliers
◦Long Nose pliers ◦Ergonomics
Replacement of temperature sensors and differential ◦Wire stripper ◦Slip / trip
controllers ◦Electric drill
◦Extension cord ◦Fall
◦Clamp multi tester
_______________________ ______________________
TIP/ Project In-Charge Department Safety Officer
(Signature over printed name) (Signature over printed name)
Note: Add another page if necessary.
JOB HAZARD ANALYSIS
L SYSTEM
nomics, (twisting and repetetive motion, ◦Position properly, angle to proper position to work, do not over reach,
ng and over reaching, excessive force, heavy streaching before work, frewuent scheduled breaks, proper lifting
, awkward posture) posture 1
trocution / electric shock ◦No live tapping, testing and double check lines before commissioning
age to property ◦Visual supervision
p pointed objects, Minor cuts and laceration ◦File sharp edges, cover all pointy protruding items, provision of long
sleeved uniforms, working gloves
nomics (bending and twisting motion, ◦Proper positioning, do no over reach, streaching before work, job 1
ward posture)
tric shock rotation
◦Double check electrical tools before using
s, spills ◦Provision of drip pads and secondary containers, provision of spill kits
(rags, mops, and garbage bags ready for disposal 1
e and foul odors ◦Provison of exhaust fans, work on well ventilated area.
Electronically Approved
________________________ ________________________
Manager / Supervisor Corporate Safety Officer
(Signature over printed name) (Signature over printed name)
HGA.102.R2