REVISION CERTIFICATE EDSD REV. NO.

DATE JO/EWO DESCRIPTION ENG'G CERT PMT OPRNS


THIS INDICATES THAT REV. NO. ____________ VERIFICATION

OF THIS DRAWING IS COVERED, FOR ALL B 11 NOV 2019 10-14245-0000 ISSUED FOR PROPOSAL AS ST
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY
C 13 MAY 2020 10-14245-0000 ISSUED FOR PROPOSAL AS ST

PROJECT
ENGINEER
ENGINEER
BY DRAWING COMPLETION CERTIFICATE

CERTIFIED
DISCIPLINE
BY: ______________

OPERATIONS
CONSTRUCTION

_______________

DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
(DCC)NO. _______________________________

________________
________________
________________
________________
DATE _____________ D 16 AUG 2020 10-14245-0000 ISSUED FOR PROPOSAL ST ST

simon.turner

simon.turner

JAFURAH
1034-8150-PH-002_REV D3
Saudi Aramco 2616-ENG (10/2002)

PROJECT PHILOSOPHY

JAFURAH DOWNSTREAM PROGRAM


ESCAPE, EVACUATION AND RESCUE STRATEGY
DOC
DWG.TYPE

SAUDI ARABIA
JAFURAH
STRATEGY

PLANT .NO
PROJECT PHILOSOPHY

B
INDEX
SAUDI ARABIAN OIL COMPANY

JO / EWO 10-14245-0000
JAFURAH DOWNSTREAM PROGRAM

DOC CLASS: 4B
ESCAPE, EVACUATION AND RESCUE

DRAWING NO.

JD-081024
1

16
OF
SHT. NO.

DSN: 4007
D
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REVISION D1 D2 D3
Signature Signature Signature
CERT

DATE 11-NOV-2019 13-MAY-2020 16-AUG-2020


ST

ST

ST

ORIG. A Suliman AS A Suliman AS S Turner simon.turner


ENG'G

PEM APP. R Seshadri RS R Seshadri RS R Seshadri ravi.seshadri


AS

AS

ST

DHSE APP. S Turner ST S Turner ST S Turner simon.turner


DESCRIPTION

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL


JO/EWO

13 MAY 2020

16 AUG 2020
11 NOV 2019
DATE
REV. NO.

D
B

DISCIPLINE
ENGINEER

________________

DATE ___________
PROJECT
ENGINEER

________________

DATE ___________
CERTIFIED

________________

DATE ___________
CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

_______________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 2


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
CERT

ST

ST

ST
ENG'G

1. PURPOSE 4
AS

AS

ST

2. FACILITY DESCRIPTION 4
3. SCOPE 4
3.1 Definitions 5
3.2 Abbreviations 6
DESCRIPTION

4. ESCAPE 8
4.1 Alert to Personnel 8
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

4.2 Escape Routes 9


4.3 Assembly/Muster areas 9
4.4 Escape during Construction Phase 10
5. EVACUATION 11
JO/EWO

5.1 Evacuation during Construction Phase 12


6. RESCUE 12
13 MAY 2020

16 AUG 2020
11 NOV 2019

7. MANAGEMENT AND CONTROL OF EER FACILITIES 14


DATE

8. RECOMMENDATIONS 14
REV. NO.

8.1 Construction Phase 14


C

D
B

DISCIPLINE
ENGINEER 8.2 Operational and Construction Phases 14
________________

DATE ___________
9. ATTACHMENTS 16
PROJECT
ENGINEER 9.1 Attachment 1: Muster / Assembly Area Locations Layout 16
________________

DATE ___________
CERTIFIED

________________

DATE ___________
CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

_______________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 3


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. PURPOSE
CERT

ST

ST

ST

This document describes the Escape, Evacuation and Rescue Strategy (EERS) for
ENG'G

the Jafurah Downstream Feed.


AS

AS

ST

This document has been prepared during Front End Engineering Design (FEED)
and relates to both the construction and operational phases of the project. It
provides a high-level synopsis of the recommended EER arrangements for the
Jafurah Downstream Feed.
DESCRIPTION

2. FACILITY DESCRIPTION

COMPANY is developing infrastructure for processing unconventional gas to meet


10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

in-kingdom energy demand and to reduce the usage of Conventional Gas (Natural
Gas) at power generation facilities. The Unconventional Gas Program is a series of
projects to be undertaken for Jafurah and South Ghawar fields. The mandate is the
development of greenfield gas surface facilities to produce, process and transport
gas to satisfy energy demand. It is proposed to construct a greenfield gas plant,
Jafurah Gas Plant (JGP), including Industrial Support Facility (ISF) and supporting
upstream and gas gathering systems. The proposed JGP will process gas and
JO/EWO

liquids from the North and South Jafurah fields into products for export.

The Jafurah Downstream Program includes the following IK elements of work.


13 MAY 2020

16 AUG 2020
11 NOV 2019
DATE

 WER 18: Juaymah Condensate Tankage Facilities


REV. NO.

 WER 19: Wasit Downstream Pipelines (from Wasit Gas Plant)


C

D
B

DISCIPLINE
ENGINEER  Jafurah Downstream C2+NGL Pipeline Scope.
________________

DATE ___________ CONTRACTOR work scope is in Al Khobar office.


PROJECT
ENGINEER

________________ 3. SCOPE
DATE ___________
CERTIFIED

________________
This document outlines the strategy to be applied at Jafurah Downstream Program
DATE ___________ to ensure personnel to safely leave an area where a hazardous event has occurred.
CONSTRUCTION
AGENCY
This includes the following steps:
________________

DATE ___________  To maintain the safety of personnel when they escape to another location
OPERATIONS
(muster) to avoid the effects of a hazardous event
_______________

DATE ___________  To provide safe refuges at the facility for as long as required for a controlled
evacuation
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

 To ensure safe evacuation of the facility


EDSD

 To facilitate rescue of personnel in a distress or injured state

The strategy is intended to aid in developing an Emergency Plan following


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Company Guidelines. The purpose of the Emergency Response Plan (ERP) is to


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

ensure a coordinated safe response and recovery for a wide variety of facility

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 4


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
scenarios focusing primarily on the operational phases, with some
CERT

recommendations related to the construction phases.


ST

ST

ST
ENG'G

The Emergency Response Procedures shall be developed during the EPC phase
AS

AS

ST

of the project with input from COMPANY.

For the Construction stage of the project, Safety Manual & Safety Management
Guide and Emergency Preparedness is to be addressed by the EPC contractor
during EPC phase.
DESCRIPTION

3.1 Definitions

The following definitions shall apply.


10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

Accessway: An accessway is a level paved area that allows access for mobile
maintenance or firefighting vehicles to equipment. An accessway will often have a
dead-end since it is not intended for continued travel through a unit. Accessways
are restricted to use only emergency vehicles, for maintenance, or for delivery of
operations or maintenance supplies.
JO/EWO

Affected by a toxic material risk: Concentrations above ERPG-2 and ERPG-3


would be considered to “affect personnel” as described in SAES-B-014; 30ppm and
100ppm respectively for H2S.
13 MAY 2020

16 AUG 2020
11 NOV 2019
DATE

Assembly / Muster Area: Designated safe areas at specific geographic locations


where in the event of an emergency, specific employees, contractors, and visitors
REV. NO.

will assemble and head counts conducted.


C

D
B

DISCIPLINE
ENGINEER

________________
Control Room Building: Control room buildings are manned buildings that provide
DATE ___________
a location for monitoring and control of a process plant or multiple plants. A Process
PROJECT
ENGINEER
Interface Building (PIB) is not considered a control room building.
________________

DATE ___________
Escape: the unplanned movement of personnel away from an incident to a place
CERTIFIED of safety e.g. designated assembly areas, along the designated escape routes
________________
around the facility.
DATE ___________
CONSTRUCTION
AGENCY Essential Personnel: Personnel with specific work activities that require them to
________________
be located in buildings within or near a hazardous process area for logistical and
DATE ___________
OPERATIONS
response purposes. The identification of essential personnel will vary with the
_______________ phase of operation and work activities including normal operation, start-up, and
DATE ___________ planned shut-down. Examples of essential personnel include, but are not limited to,
operators, craftsmen, technicians, and their immediate supervision directly involved
DATE _____________
CONTROL NUMBER

BY: ______________

in day-to-day activities. Examples of persons who are not essential personnel


VERIFICATION
EDSD

include time keepers, clerical staff, administrative support, materials planning and
procurement staff.

Evacuation: the planned and controlled method for leaving the facility on an orderly
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

fashion from the designated assembly area(s).


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 5


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Emergency: any sudden, abnormal or unplanned situation that requires immediate
CERT

attention and may endanger human life, the environment or have an adverse effect
ST

ST

ST

on company assets and/or reputation.


ENG'G

AS

AS

ST

Operator Shelter: A small single level building or shelter used by plant operators
during working hours, usually located in the operating unit that they are attending.

Perimeter Fence: The fence which completely surrounds an area designated by


Saudi Aramco for a distinct function (plant is, light industrial part, camp, or other
function).
DESCRIPTION

Plant Area: The designated area engaged in the production, processing,


manufacturing, storage, and transportation of crude oil, natural gas, refined
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

products and their derivatives.

Rescue: Retrieval of injured or incapacitated personnel from the facility or assisting


personnel unable to access the main assembly area, to a safe place where medical
assistance is available.

Staging Area: The staging area is a location for assembling resources before
JO/EWO

committing them to a task. This area allows the Incident Commander (IC) to have
people and equipment available near the scene before executing their assignment.
13 MAY 2020

16 AUG 2020
11 NOV 2019

Escape speed: Defined walking speed to evaluate escape time; assumed to be


DATE

1.3m/s
REV. NO.

Toxic Material: For the purpose of this Risk assessment, Toxic Material refers to
C

D
B

DISCIPLINE Hydrogen Sulfide (H2S). Not expected at the Jafurah Downstream Program.
ENGINEER

________________

DATE ___________
3.2 Abbreviations
PROJECT
ENGINEER

________________
API American Petroleum Institute
DATE ___________
CERTIFIED BRA Building Risk Assessment
________________
CCR Central Control Room
DATE ___________
CONSTRUCTION
AGENCY COMPANY Saudi Aramco
________________

DATE ___________
CONTRACTOR Wood PLC
OPERATIONS

_______________
EER Escape, Evacuation and Rescue
DATE ___________
EPC Engineering, Procurement and Construction
DATE _____________
CONTROL NUMBER

BY: ______________

ERP Emergency Response Plan


VERIFICATION
EDSD

ERT Emergency Response Team


FEED Front End Engineering Design
FRA Fire Risk Assessment
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

H 2S Hydrogen Sulphide

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 6


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HP High Pressure
CERT

ST

ST

ST

IC Incident Commander
ENG'G

AS

AS

ST

IK In Kingdom
ISO International Standards Organisation
KSA Kingdom of Saudi Arabia
LFL Lower Flammability Limit
LP Low Pressure
DESCRIPTION

LPD Loss Prevention Department


LSIR location specific individual risk
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

OOK Out of Kingdom


PA Public Address System
PAN Project Advice Notice
PPE Personnel Protection Equipment
JO/EWO

QA Quality Assurance
SAES Saudi Aramco Engineering Standard
13 MAY 2020

16 AUG 2020
11 NOV 2019

SCBA Self-Contained Breathing Apparatus


DATE

SIMOPS Simultaneous Operations


REV. NO.

D
B

SSD (Saudi Arabian) Government Safety and Security Directive


DISCIPLINE
ENGINEER
TBC To Be Confirmed
________________

DATE ___________ THSE Technical Health, Safety & Environment


PROJECT
ENGINEER

________________

DATE ___________
4. ESCAPE
CERTIFIED

________________ 4.1 Alert to Personnel


DATE ___________
CONSTRUCTION
AGENCY Escaping in an emergency situation relies upon internal communications systems
________________ provided for normal operations to remain active during emergency scenarios. In this
DATE ___________
OPERATIONS
respect Public Address and General Alarm (PAGA) systems shall be designed as
_______________
per SAES-B-071 to ensure availability & reliability. The means to alert and muster
DATE ___________
personnel shall include:
DATE _____________
CONTROL NUMBER

BY: ______________

 A Public Address powerful enough to be heard above the ambient noise


VERIFICATION

level outdoors
EDSD

 Visual and audible alarms outdoors


 A General Alarm audible all over the concerned areas with the following
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

defined sounds:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 7


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Upon hearing an emergency siren all work shall take the appropriate Escape &
CERT

Evacuation actions depending upon the specific SAES-B-071 alarm type:


ST

ST

ST
ENG'G

 Stop Work audible alert shall be a continuous “air horn” sound. On sounding
AS

AS

ST

of this Alarm personnel shall stop work and wait for further instructions
 General Emergency alert shall be a rising and falling pitch “traditional siren”
continuous sound. On sounding of this Alarm personnel shall stop work and
proceed to their designated assembly/muster area; active permits shall be
cancelled.
DESCRIPTION

 The Combustible Gas release audible alert shall be a continuous “warble”


sound. On sounding of this Alarm personnel shall stop work and proceed in
an upwind or cross-wind direction to the nearest safe assembly area; active
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

permits shall be cancelled. There is no local “all clear” signal; returning to


work would be either by the general siren or by personal instruction from the
corresponding area management.

Sufficient Self-Contained Breathing Apparatus (SCBA) shall also be provided at


designated locations within those units for use in an emergency.
JO/EWO

4.2 Escape Routes

Sufficient exits shall be provided to allow safe exit from anywhere in any building in
13 MAY 2020

16 AUG 2020
11 NOV 2019

the case of fire. If there is a single fire or incident that blocks any exit, there shall
DATE

be a path to another exit.


REV. NO.

Escape routes shall be provided as per the requirements of SAES-B-054 & as


C

D
B

DISCIPLINE
ENGINEER
defined in the Safety Philosophy (Ref T80-A-PP-312707, section 8) to allow
________________ personnel to reach defined assembly/muster areas in an emergency scenario.
DATE ___________
PROJECT
ENGINEER For both the operational and construction phases at the Jafurah Downstream
________________ Program escape is principally on foot to a muster point in a safe location.
DATE ___________
CERTIFIED
Escape and evacuation routes are shown in separate layout drawings (e.g. JD-
________________

DATE ___________
081206-002)
CONSTRUCTION
AGENCY
4.3 Assembly/Muster areas
________________

DATE ___________
OPERATIONS In the event of an emergency, all employees, contractors and visitors will move to
_______________ their assigned assembly/muster areas according to the defined alarm responses.
DATE ___________ Personnel (operational and construction) may be required to don escape sets when
a toxic/flammable gas alarm sounds (see section 4.1 for details on alarms).
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

During routine operations, upon sounding of the general alarm all personnel will be
required to make their way to their designated assembly/muster area.

Occupied buildings that may be affected by toxic/flammable gas exposure shall be


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

identified (along with safe havens within) and designed as per SAES-B-014 to
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

ensure occupants are protected in the event of a gas release and allow them to
safely remain in location for the duration of the event. Additional

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 8


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
hydrocarbon/vapour cloud escape sets, or full self-contained breathing apparatus
CERT

(SCBA) shall be provided to enable an evacuation from site if required.


ST

ST

ST
ENG'G

Given the large area the plant covers, local assembly/muster areas shall be
AS

AS

ST

provided for use by operators during normal operations and construction workers
during construction. Where possible, these shall be near buildings that could also
provide safety equipment and In-site Voice Paging System. These
assembly/muster areas shall be within a 10-minute travel distance from personnel’s
assigned work areas at the designated escape speed and with additional
hydrocarbon/vapour cloud escape sets, or full self-contained breathing apparatus
DESCRIPTION

(SCBA) provided to enable an evacuation from site if required.

The location of emergency lit assembly/muster areas shall be considered in terms


10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

of the main wind direction, plant hazards and personnel distributions both day and
night; recommended locations for the operational phase are shown in Error!
Reference source not found. below, these are also highlighted on the overall plot
plan in attachment 1.

Windsocks or wind direction indicators shall be provided on tall structures to ensure


personnel make informed decision in the event of a toxic/flammable gas release.
JO/EWO

Sufficient should be provided so that operators do not have to travel more than 5 m
to see an indicator. Indicators shall be illuminated at nighttime.
13 MAY 2020

16 AUG 2020
11 NOV 2019

Mustering times and head counts should be completed within 30 minutes, this takes
DATE

into consideration the following assumed timings (to be confirmed during EPC).
Provision of new muster points may be appropriate then.
REV. NO.

D
B

DISCIPLINE
ENGINEER
Alarm activation time- No delay assumed as alarm is automatic
________________

DATE ___________
Personnel response time - 1 minute
PROJECT
ENGINEER

________________
Personnel making workplace safe - 5 minutes
DATE ___________
CERTIFIED
Escape Time - 10 minutes
________________

DATE ___________
CONSTRUCTION
Head count - 5 minutes
AGENCY

________________
4.4 Escape during Construction Phase
DATE ___________
OPERATIONS

_______________ There is currently no intent to conduct 24-hour construction activities or night shift
DATE ___________ work (to be confirmed during EPC) however this may be required for special
activities. The EPC Contractor shall address any special nighttime escape and
DATE _____________
CONTROL NUMBER

BY: ______________

assembly requirements for these special activities on a case by case basis.


VERIFICATION
EDSD

Where construction work is required close to live plant handling toxic gas,
construction workers should be provided with hydrocarbon/vapour cloud escape
sets or an equivalent level of protection, along with the required training in their use,
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

to enable them to escape the immediate area. This is most likely to arise during
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

work on pipe bridges and tie-ins within the existing plant or when working close to

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 9


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the areas of the facility that are mechanically complete, commissioned and started-
CERT

up with feed throughput; making that “area”, effectively “live”.


ST

ST

ST
ENG'G

Consideration should be given to the following:


AS

AS

ST

 Linking emergency alarms from nearby "live” plant into the construction site
alarm system, to provide early warning of an incident or provision of
temporary, independent hydrocarbon/vapour cloud alarm units at the
boundary between operating plant and construction facilities.
 Provision of personnel hydrocarbon/vapour cloud alarms.
DESCRIPTION

 Hydrocarbon/vapour cloud escape sets for specific tasks or locations where


there is a high risk of exposure to hydrocarbon/vapour cloud, together with
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

suitable training and escape sets for everyone (single piece


hydrocarbon/vapour cloud escape masks, of the full-face hood type) on site.
 Designating certain areas close to the live plant as a Toxic Hazard Zone,
where hydrocarbon/vapour cloud escape sets should be carried at all times,
or ensuring that the permit to work systems assess the job and location and
determine those combinations of tasks and locations where
JO/EWO

hydrocarbon/vapour cloud escape sets should be carried at all times.


 Emergency lighting to be along the path of plant / field escape routes.
13 MAY 2020

16 AUG 2020
11 NOV 2019
DATE

The EPC Contractor shall further develop the instructions for escape and specify
the assembly area(s) for the construction phase of the facilities. The ERP will need
to incorporate the possibility of the toxic hazards from the live plant. Wherever
REV. NO.

D
B

possible construction vehicles and site vehicles should be utilised to support


DISCIPLINE
ENGINEER escape and evacuation operations.
________________

DATE ___________
PROJECT
5. EVACUATION
ENGINEER

________________
Evacuation is the planned and controlled method of leaving the plant in an orderly
DATE ___________
CERTIFIED
fashion from the designated main assembly/muster area. The evacuation
________________ procedures for the construction and operational phases have not yet been defined
DATE ___________ by the operator.
CONSTRUCTION
AGENCY

________________ During the construction and operational phases, it is expected that should
DATE ___________ evacuation from the facility be necessary, personnel will evacuate on foot to the
OPERATIONS
defined safe locations outside the plant boundary fence. The perimeter fence shall
_______________
also have emergency egress points at suitably spaced intervals (to be confirmed
DATE ___________
during EPC).
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

Windsocks shall be provided to visually warn which direction a vapour cloud may
EDSD

drift. Personnel on site will escape across wind away from the release point, so if
the release were to drift towards the final assembly/muster area at the Dining
Building (to be confirmed during EPC), personnel would be directed to evacuate
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

the site from an alternative route.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 10


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A siren(s) shall also be provided to warn personnel when to evacuate the facility.
CERT

The siren(s) should be operable from the control room and the fire station. It shall
ST

ST

ST

be heard from all plant areas and at a minimum of 100m outside plant fences.
ENG'G

AS

AS

ST

5.1 Evacuation during Construction Phase

Construction vehicles should be utilised to transport personnel from the far reaches
of the construction site wherever possible. Construction worker transport (coaches)
should be utilised to transport construction personnel to a further place of safety in
the event of a serious incident. It is expected that during a shift the coaches will
DESCRIPTION

normally be parked at a temporary car park outside each individual EPC contractor
access gate.
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

EPC contractor shall assess whether coaches should be provided that can be
sealed against toxic gas ingress and have breathing air systems to protect the
coach crew and passengers.

Windsocks shall be provided to visually warn which direction a vapour cloud release
may drift. Personnel on site will escape across wind away from the release point,
so if the release were to drift towards the coach park, personnel would be directed
JO/EWO

to go to an alternative assembly point. Coaches would be instructed to leave the


area if a vapour cloud was drifting towards it. An alternative coach pick-up point for
evacuation of site personnel should be provided for such an eventuality.
13 MAY 2020

16 AUG 2020
11 NOV 2019
DATE

Evacuation practices and procedures in place for the operational facility may be
utilised by EPC Contractors as a basis for further development and use during the
REV. NO.

construction and commissioning phases at each contractor area.


C

D
B

DISCIPLINE
ENGINEER

________________
Construction activities should not compromise the evacuation routes for vehicles
DATE ___________
leaving the construction area at the Project site.
PROJECT
ENGINEER

________________
An EPC Contractor shall develop the ERP and Evacuation procedures and
DATE ___________ incorporate any findings arising from the Building Risk Assessment (BRA) and
CERTIFIED
Simultaneous Operations (SIMOPs) studies especially in relation to a vapour cloud
________________
release from the adjacent process areas.
DATE ___________
CONSTRUCTION
AGENCY
6. RESCUE
________________

DATE ___________
OPERATIONS Full BA, stretchers, first aid materials, mobile and portable fire extinguishers should
_______________ be located strategically throughout the site to facilitate the recovery of injured
DATE ___________ personnel at each phase of the project. It is expected that there will be an
Emergency Response Team (ERT) which will consist of firefighters and ambulance
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

service. The ERT should be available to respond to any rescue operations.


EDSD

Rescue is the retrieval of injured or incapacitated personnel from the facility or


recovering personnel unable to reach their designated assembly point, to a safe
place where medical assistance is available. There shall be appropriate rescue
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

equipment provided for the facility. Training in the use of such equipment shall be
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

given to personnel and written instructions shall also be provided with the
equipment at the storage location.
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 11


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Staging areas shall be provided for the ERT close enough to the incident to allow
CERT

for a maximum 5-minute response time, but not so close as to interfere with incident
ST

ST

ST

commend operations. The location of the staging areas shall be based upon
ENG'G

prevailing wind conditions, the plant layout, and the nature of the emergency and
AS

AS

ST

defined in an update of the site ERP.

During plant layout, plant roads shall be arranged to provide access to all sides of
a process unit for firefighting and rescue vehicles to facilitate emergency response
and rescue activities.
DESCRIPTION

Escape and evacuation routes are shown in separate layout drawings (e.g. JD-
081206-002)
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

The quantity of items that will be provided and the arrangements for rescue
operations shall correspond to the personnel on site during the construction and
operational phases of the project.

The need for proper protective clothing and equipment (PPE) in a hazardous
environment is critical. There is not one type of protective clothing that will satisfy
the emergency responder protection needs under all conditions.
JO/EWO

Exposure to hazardous substances can impede personnel escape or rescue, any


areas in the facility that handle hazardous substances shall be provided with Safety
13 MAY 2020

16 AUG 2020
11 NOV 2019

Showers and Eye wash stations located and designed in compliance with SAES-B-
DATE

069.
REV. NO.

Such shower with eye bath shall be in accessible locations that require no further
C

D
B

DISCIPLINE
ENGINEER
than 15 m (50 ft.) from a hazard except where specifically allowed (See below) &
________________
no closer than 3 m (10 ft.). The nature, severity, and environment of the chemical
DATE ___________
hazard shall be considered in determining the maximum allowable unobstructed
PROJECT
ENGINEER
distance.
________________

DATE ___________  Outside of the most likely spray paths such as sample and drain points.
CERTIFIED

________________  Along or adjacent to the normal path of egress, free of obstructions, and on the
DATE ___________ same floor level as the hazard.
CONSTRUCTION


AGENCY
In a location accessible from the hazard without the use of stairs, a ladder or a
________________

DATE ___________
door.
OPERATIONS

_______________
 Upwind, based on the prevailing wind, of the hazard where practical.
DATE ___________
 In more than one place near the hazard if more than one person is likely to be
splashed at the same time.
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

 In an area that is well illuminated area lighted (100 lux minimum; refer to SAES-
EDSD

P-123).
 At a safe distance at least 3 m (10 ft.) from electrical equipment and power
THIS INDICATES THAT REV. NO. ____________

outlets that are not protected by ground-fault circuit-interrupters (GFCIs), except


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

in battery rooms, in which case separation between an eyewash (no shower)


REVISION CERTIFICATE

and the batteries shall be at least 1.5 m (5 ft.). Only an eyewash is required in

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 12


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the battery room, provided that there is no acid-mixing activity to be done inside
CERT

the battery room. If a shower is provided with the eyewash, then 3 m (10 ft.)
ST

ST

ST

separation is required.
ENG'G

AS

AS

ST

The site operational and construction leads of Jafurah Downstream Program facility
shall retain information on the capabilities of area hospitals including total beds,
their ability to treat burns and chemical injuries, decontamination facilities, and any
specialised capabilities. They shall also identify the types and amount of specialised
supplies necessary for any specific hazardous material injuries.
DESCRIPTION

Rapid air-lift evacuation (e.g. by helicopter) may be advantageous for critical


medical and injury situations in both the construction and operations phases of the
project.
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

During incident preplanning, potential locations for decontamination areas shall be


identified in conjunction with the Fire Commander.

The rescue operations/procedures will be developed and incorporated in the ERP


by the EPC Contractor.
JO/EWO

7. MANAGEMENT AND CONTROL OF EER FACILITIES

During the operational phase of the project, the process of the initial emergency
13 MAY 2020

16 AUG 2020
11 NOV 2019

situation and the responses are monitored and coordinated from the designated
DATE

COMPANY Emergency Response Centre (ERC). The liaison with service providers
such as firefighters and emergency ambulance should also be coordinated from the
REV. NO.

ERC.
C

D
B

DISCIPLINE
ENGINEER

________________
During the construction phase of the project, coordination of the EER facilities and
DATE ___________ the monitoring of the initial emergency will be at the designated assembly point.
PROJECT
ENGINEER However, this may need to be changed as the construction progresses to take
________________ account of the facilities available at each stage.
DATE ___________
CERTIFIED

________________
8. RECOMMENDATIONS
DATE ___________
CONSTRUCTION This EER Strategy identifies a number of recommendations to be incorporated in
AGENCY

________________
the Emergency response plan for each phase of the project at the facility.
DATE ___________
OPERATIONS 8.1 Construction Phase
_______________

DATE ___________ 1. The EPC Contractor shall consult with COMPANY to identify safe
location(s) that can be used as the assembly area(s) for construction
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

workers during the construction phase.


EDSD

2. Mandatory Inductions shall be completed for all EPC Contractor workers in


relation to emergency response requirements related to the live facility,
focusing on mitigating language barriers and potential unfamiliarity with the
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

facility layout and surroundings.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

8.2 Operational and Construction Phases

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 13


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Conduct high level SIMOPS during FEED phase in relation to potential “live”
CERT

facility, to be further developed by the EPC Contractor.


ST

ST

ST

2. Escape to assembly areas is principally on foot at all locations.


ENG'G

AS

AS

ST

hydrocarbon/vapour cloud escape sets shall be provided to personnel


working in or adjacent to sour gas containing plant during the construction
and operating phases of the facilities.
3. There should be numerous (primary and secondary) escape routes from all
areas of the facilities. In general, there should be at least two exits with
separate routes from any building or enclosed area to common escape
DESCRIPTION

routes, and from all points on these common escape routes to the assembly
areas.
4. All escape routes, including those involving staircases, should permit
10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

transfer of injured personnel including those who may require to be moved


by stretcher team.
5. Escape routes should never be compromised by construction,
commissioning, operations or maintenance activities. Where major work is
anticipated, and an escape route will be temporarily unavailable, alternative
escape routes should be indicated and suitably marked.
JO/EWO

6. Regular escape and evacuation drills should be conducted to ensure that


all personnel are familiar with the location of escape routes and assembly
13 MAY 2020

16 AUG 2020
11 NOV 2019

area(s). These shall be further outlined in the facility ERP.


DATE

7. Evacuation drills should be independently observed and any congestion


which delays escape should be noted and arrangements made to correct
REV. NO.

the situation. The average time needed to clear areas that contain hazards
C

D
B

DISCIPLINE
ENGINEER
to personnel should be used to determine the period during which recovery
________________ measures must keep escape and evacuation routes viable.
DATE ___________
PROJECT 8. In plant area safety signs and arrows showing the direction to the closest
ENGINEER
escape route and exits to safe locations should be placed at regular
________________
intervals.
DATE ___________
CERTIFIED
9. The EPC contractor shall liaise with operators and site emergency response
________________

DATE ___________
providers to ensure that an integrated emergency response, evacuation and
CONSTRUCTION rescue strategy is developed.
AGENCY

________________ 10. The site emergency response plan should be fully developed in the EPC
DATE ___________ phase.
OPERATIONS

_______________ 11. Building internal signs should be photo luminescent and other signs should
DATE ___________
be either light reflective or photo luminescent as appropriate.
DATE _____________
CONTROL NUMBER

BY: ______________

12. The occupancy and manning distribution across each of the facilities shall
VERIFICATION

be analysed further in the EPC phase to confirm evacuation and muster


EDSD

times and capacity of defined areas.


13. Consider linking emergency alarms from the existing plant into the related
construction site alarm system, to provide early warning if an incident or,
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

provide temporary independent hydrocarbon/vapour cloud gas alarm units


REVISION CERTIFICATE

at the boundary between operating plant and construction facilities.

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 14


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14. Provide personnel toxic/flammable gas alarms for personnel working in or
CERT

close to high risk a vapour cloud release areas.


ST

ST

ST
ENG'G

9. ATTACHMENTS
AS

AS

ST

9.1 Attachment 1: Muster / Assembly Area Locations Layout


DESCRIPTION

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL

10-14245-0000 ISSUED FOR PROPOSAL


JO/EWO

13 MAY 2020

16 AUG 2020
11 NOV 2019
DATE
REV. NO.

D
B

DISCIPLINE
ENGINEER

________________

DATE ___________
PROJECT
ENGINEER

________________

DATE ___________
CERTIFIED

________________

DATE ___________
CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

_______________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE

ESCAPE, EVACUATION AND RESCUE STRATEGY DOC 15


B JD-081024
JAFURAH DOWNSTREAM PROGRAM OF D
JAFURAH SAUDI ARABIA JO / EWO 10-14245-0000 16
1034-8150-PH-002_REV D3 DOC CLASS: 4B DSN: 4007
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENG'G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. ____________ VERIFICATION

OF THIS DRAWING IS COVERED, FOR ALL B 11 NOV 2019 10-14245-0000 ISSUED FOR PROPOSAL AS ST
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY
C 13 MAY 2020 10-14245-0000 ISSUED FOR PROPOSAL AS ST

PROJECT
ENGINEER
ENGINEER
BY DRAWING COMPLETION CERTIFICATE

CERTIFIED
DISCIPLINE
BY: ______________

OPERATIONS
CONSTRUCTION

_______________

DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
(DCC)NO. _______________________________

________________
________________
________________
________________
DATE _____________ D 16 AUG 2020 10-14245-0000 ISSUED FOR PROPOSAL ST ST

JAFURAH
1034-8150-PH-002_REV D3
Saudi Aramco 2616-ENG (10/2002)

PROJECT PHILOSOPHY

JAFURAH DOWNSTREAM PROGRAM


ESCAPE, EVACUATION AND RESCUE STRATEGY
DOC
DWG.TYPE

SAUDI ARABIA
PLANT .NO

B
INDEX
SAUDI ARABIAN OIL COMPANY

JO / EWO 10-14245-0000
DOC CLASS: 4B
DRAWING NO.

JD-081024

16
16
OF
SHT. NO.

DSN: 4007
D
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.