Project Philosophy: Saudi Arabian Oil Company
Project Philosophy: Saudi Arabian Oil Company
OF THIS DRAWING IS COVERED, FOR ALL B 11 NOV 2019 10-14245-0000 ISSUED FOR PROPOSAL AS ST
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER
AGENCY
C 13 MAY 2020 10-14245-0000 ISSUED FOR PROPOSAL AS ST
PROJECT
ENGINEER
ENGINEER
BY DRAWING COMPLETION CERTIFICATE
CERTIFIED
DISCIPLINE
BY: ______________
OPERATIONS
CONSTRUCTION
_______________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
(DCC)NO. _______________________________
________________
________________
________________
________________
DATE _____________ D 16 AUG 2020 10-14245-0000 ISSUED FOR PROPOSAL ST ST
simon.turner
simon.turner
JAFURAH
1034-8150-PH-002_REV D3
Saudi Aramco 2616-ENG (10/2002)
PROJECT PHILOSOPHY
SAUDI ARABIA
JAFURAH
STRATEGY
PLANT .NO
PROJECT PHILOSOPHY
B
INDEX
SAUDI ARABIAN OIL COMPANY
JO / EWO 10-14245-0000
JAFURAH DOWNSTREAM PROGRAM
DOC CLASS: 4B
ESCAPE, EVACUATION AND RESCUE
DRAWING NO.
JD-081024
1
16
OF
SHT. NO.
DSN: 4007
D
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REVISION D1 D2 D3
Signature Signature Signature
CERT
ST
ST
AS
ST
13 MAY 2020
16 AUG 2020
11 NOV 2019
DATE
REV. NO.
D
B
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
_______________
DATE ___________
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
CERT
ST
ST
ST
ENG'G
1. PURPOSE 4
AS
AS
ST
2. FACILITY DESCRIPTION 4
3. SCOPE 4
3.1 Definitions 5
3.2 Abbreviations 6
DESCRIPTION
4. ESCAPE 8
4.1 Alert to Personnel 8
10-14245-0000 ISSUED FOR PROPOSAL
16 AUG 2020
11 NOV 2019
8. RECOMMENDATIONS 14
REV. NO.
D
B
DISCIPLINE
ENGINEER 8.2 Operational and Construction Phases 14
________________
DATE ___________
9. ATTACHMENTS 16
PROJECT
ENGINEER 9.1 Attachment 1: Muster / Assembly Area Locations Layout 16
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
_______________
DATE ___________
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. PURPOSE
CERT
ST
ST
ST
This document describes the Escape, Evacuation and Rescue Strategy (EERS) for
ENG'G
AS
ST
This document has been prepared during Front End Engineering Design (FEED)
and relates to both the construction and operational phases of the project. It
provides a high-level synopsis of the recommended EER arrangements for the
Jafurah Downstream Feed.
DESCRIPTION
2. FACILITY DESCRIPTION
in-kingdom energy demand and to reduce the usage of Conventional Gas (Natural
Gas) at power generation facilities. The Unconventional Gas Program is a series of
projects to be undertaken for Jafurah and South Ghawar fields. The mandate is the
development of greenfield gas surface facilities to produce, process and transport
gas to satisfy energy demand. It is proposed to construct a greenfield gas plant,
Jafurah Gas Plant (JGP), including Industrial Support Facility (ISF) and supporting
upstream and gas gathering systems. The proposed JGP will process gas and
JO/EWO
liquids from the North and South Jafurah fields into products for export.
16 AUG 2020
11 NOV 2019
DATE
D
B
DISCIPLINE
ENGINEER Jafurah Downstream C2+NGL Pipeline Scope.
________________
________________ 3. SCOPE
DATE ___________
CERTIFIED
________________
This document outlines the strategy to be applied at Jafurah Downstream Program
DATE ___________ to ensure personnel to safely leave an area where a hazardous event has occurred.
CONSTRUCTION
AGENCY
This includes the following steps:
________________
DATE ___________ To maintain the safety of personnel when they escape to another location
OPERATIONS
(muster) to avoid the effects of a hazardous event
_______________
DATE ___________ To provide safe refuges at the facility for as long as required for a controlled
evacuation
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
ensure a coordinated safe response and recovery for a wide variety of facility
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
scenarios focusing primarily on the operational phases, with some
CERT
ST
ST
ENG'G
The Emergency Response Procedures shall be developed during the EPC phase
AS
AS
ST
For the Construction stage of the project, Safety Manual & Safety Management
Guide and Emergency Preparedness is to be addressed by the EPC contractor
during EPC phase.
DESCRIPTION
3.1 Definitions
Accessway: An accessway is a level paved area that allows access for mobile
maintenance or firefighting vehicles to equipment. An accessway will often have a
dead-end since it is not intended for continued travel through a unit. Accessways
are restricted to use only emergency vehicles, for maintenance, or for delivery of
operations or maintenance supplies.
JO/EWO
16 AUG 2020
11 NOV 2019
DATE
D
B
DISCIPLINE
ENGINEER
________________
Control Room Building: Control room buildings are manned buildings that provide
DATE ___________
a location for monitoring and control of a process plant or multiple plants. A Process
PROJECT
ENGINEER
Interface Building (PIB) is not considered a control room building.
________________
DATE ___________
Escape: the unplanned movement of personnel away from an incident to a place
CERTIFIED of safety e.g. designated assembly areas, along the designated escape routes
________________
around the facility.
DATE ___________
CONSTRUCTION
AGENCY Essential Personnel: Personnel with specific work activities that require them to
________________
be located in buildings within or near a hazardous process area for logistical and
DATE ___________
OPERATIONS
response purposes. The identification of essential personnel will vary with the
_______________ phase of operation and work activities including normal operation, start-up, and
DATE ___________ planned shut-down. Examples of essential personnel include, but are not limited to,
operators, craftsmen, technicians, and their immediate supervision directly involved
DATE _____________
CONTROL NUMBER
BY: ______________
include time keepers, clerical staff, administrative support, materials planning and
procurement staff.
Evacuation: the planned and controlled method for leaving the facility on an orderly
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Emergency: any sudden, abnormal or unplanned situation that requires immediate
CERT
attention and may endanger human life, the environment or have an adverse effect
ST
ST
ST
AS
AS
ST
Operator Shelter: A small single level building or shelter used by plant operators
during working hours, usually located in the operating unit that they are attending.
Staging Area: The staging area is a location for assembling resources before
JO/EWO
committing them to a task. This area allows the Incident Commander (IC) to have
people and equipment available near the scene before executing their assignment.
13 MAY 2020
16 AUG 2020
11 NOV 2019
1.3m/s
REV. NO.
Toxic Material: For the purpose of this Risk assessment, Toxic Material refers to
C
D
B
DISCIPLINE Hydrogen Sulfide (H2S). Not expected at the Jafurah Downstream Program.
ENGINEER
________________
DATE ___________
3.2 Abbreviations
PROJECT
ENGINEER
________________
API American Petroleum Institute
DATE ___________
CERTIFIED BRA Building Risk Assessment
________________
CCR Central Control Room
DATE ___________
CONSTRUCTION
AGENCY COMPANY Saudi Aramco
________________
DATE ___________
CONTRACTOR Wood PLC
OPERATIONS
_______________
EER Escape, Evacuation and Rescue
DATE ___________
EPC Engineering, Procurement and Construction
DATE _____________
CONTROL NUMBER
BY: ______________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
H 2S Hydrogen Sulphide
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HP High Pressure
CERT
ST
ST
ST
IC Incident Commander
ENG'G
AS
AS
ST
IK In Kingdom
ISO International Standards Organisation
KSA Kingdom of Saudi Arabia
LFL Lower Flammability Limit
LP Low Pressure
DESCRIPTION
QA Quality Assurance
SAES Saudi Aramco Engineering Standard
13 MAY 2020
16 AUG 2020
11 NOV 2019
D
B
________________
DATE ___________
4. ESCAPE
CERTIFIED
BY: ______________
level outdoors
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
defined sounds:
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Upon hearing an emergency siren all work shall take the appropriate Escape &
CERT
ST
ST
ENG'G
Stop Work audible alert shall be a continuous “air horn” sound. On sounding
AS
AS
ST
of this Alarm personnel shall stop work and wait for further instructions
General Emergency alert shall be a rising and falling pitch “traditional siren”
continuous sound. On sounding of this Alarm personnel shall stop work and
proceed to their designated assembly/muster area; active permits shall be
cancelled.
DESCRIPTION
Sufficient exits shall be provided to allow safe exit from anywhere in any building in
13 MAY 2020
16 AUG 2020
11 NOV 2019
the case of fire. If there is a single fire or incident that blocks any exit, there shall
DATE
D
B
DISCIPLINE
ENGINEER
defined in the Safety Philosophy (Ref T80-A-PP-312707, section 8) to allow
________________ personnel to reach defined assembly/muster areas in an emergency scenario.
DATE ___________
PROJECT
ENGINEER For both the operational and construction phases at the Jafurah Downstream
________________ Program escape is principally on foot to a muster point in a safe location.
DATE ___________
CERTIFIED
Escape and evacuation routes are shown in separate layout drawings (e.g. JD-
________________
DATE ___________
081206-002)
CONSTRUCTION
AGENCY
4.3 Assembly/Muster areas
________________
DATE ___________
OPERATIONS In the event of an emergency, all employees, contractors and visitors will move to
_______________ their assigned assembly/muster areas according to the defined alarm responses.
DATE ___________ Personnel (operational and construction) may be required to don escape sets when
a toxic/flammable gas alarm sounds (see section 4.1 for details on alarms).
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
EDSD
During routine operations, upon sounding of the general alarm all personnel will be
required to make their way to their designated assembly/muster area.
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
identified (along with safe havens within) and designed as per SAES-B-014 to
OF THIS DRAWING IS COVERED, FOR ALL
ensure occupants are protected in the event of a gas release and allow them to
safely remain in location for the duration of the event. Additional
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
hydrocarbon/vapour cloud escape sets, or full self-contained breathing apparatus
CERT
ST
ST
ENG'G
Given the large area the plant covers, local assembly/muster areas shall be
AS
AS
ST
provided for use by operators during normal operations and construction workers
during construction. Where possible, these shall be near buildings that could also
provide safety equipment and In-site Voice Paging System. These
assembly/muster areas shall be within a 10-minute travel distance from personnel’s
assigned work areas at the designated escape speed and with additional
hydrocarbon/vapour cloud escape sets, or full self-contained breathing apparatus
DESCRIPTION
of the main wind direction, plant hazards and personnel distributions both day and
night; recommended locations for the operational phase are shown in Error!
Reference source not found. below, these are also highlighted on the overall plot
plan in attachment 1.
Sufficient should be provided so that operators do not have to travel more than 5 m
to see an indicator. Indicators shall be illuminated at nighttime.
13 MAY 2020
16 AUG 2020
11 NOV 2019
Mustering times and head counts should be completed within 30 minutes, this takes
DATE
into consideration the following assumed timings (to be confirmed during EPC).
Provision of new muster points may be appropriate then.
REV. NO.
D
B
DISCIPLINE
ENGINEER
Alarm activation time- No delay assumed as alarm is automatic
________________
DATE ___________
Personnel response time - 1 minute
PROJECT
ENGINEER
________________
Personnel making workplace safe - 5 minutes
DATE ___________
CERTIFIED
Escape Time - 10 minutes
________________
DATE ___________
CONSTRUCTION
Head count - 5 minutes
AGENCY
________________
4.4 Escape during Construction Phase
DATE ___________
OPERATIONS
_______________ There is currently no intent to conduct 24-hour construction activities or night shift
DATE ___________ work (to be confirmed during EPC) however this may be required for special
activities. The EPC Contractor shall address any special nighttime escape and
DATE _____________
CONTROL NUMBER
BY: ______________
Where construction work is required close to live plant handling toxic gas,
construction workers should be provided with hydrocarbon/vapour cloud escape
sets or an equivalent level of protection, along with the required training in their use,
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
to enable them to escape the immediate area. This is most likely to arise during
OF THIS DRAWING IS COVERED, FOR ALL
work on pipe bridges and tie-ins within the existing plant or when working close to
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the areas of the facility that are mechanically complete, commissioned and started-
CERT
ST
ST
ENG'G
AS
ST
Linking emergency alarms from nearby "live” plant into the construction site
alarm system, to provide early warning of an incident or provision of
temporary, independent hydrocarbon/vapour cloud alarm units at the
boundary between operating plant and construction facilities.
Provision of personnel hydrocarbon/vapour cloud alarms.
DESCRIPTION
16 AUG 2020
11 NOV 2019
DATE
The EPC Contractor shall further develop the instructions for escape and specify
the assembly area(s) for the construction phase of the facilities. The ERP will need
to incorporate the possibility of the toxic hazards from the live plant. Wherever
REV. NO.
D
B
DATE ___________
PROJECT
5. EVACUATION
ENGINEER
________________
Evacuation is the planned and controlled method of leaving the plant in an orderly
DATE ___________
CERTIFIED
fashion from the designated main assembly/muster area. The evacuation
________________ procedures for the construction and operational phases have not yet been defined
DATE ___________ by the operator.
CONSTRUCTION
AGENCY
________________ During the construction and operational phases, it is expected that should
DATE ___________ evacuation from the facility be necessary, personnel will evacuate on foot to the
OPERATIONS
defined safe locations outside the plant boundary fence. The perimeter fence shall
_______________
also have emergency egress points at suitably spaced intervals (to be confirmed
DATE ___________
during EPC).
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
Windsocks shall be provided to visually warn which direction a vapour cloud may
EDSD
drift. Personnel on site will escape across wind away from the release point, so if
the release were to drift towards the final assembly/muster area at the Dining
Building (to be confirmed during EPC), personnel would be directed to evacuate
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A siren(s) shall also be provided to warn personnel when to evacuate the facility.
CERT
The siren(s) should be operable from the control room and the fire station. It shall
ST
ST
ST
be heard from all plant areas and at a minimum of 100m outside plant fences.
ENG'G
AS
AS
ST
Construction vehicles should be utilised to transport personnel from the far reaches
of the construction site wherever possible. Construction worker transport (coaches)
should be utilised to transport construction personnel to a further place of safety in
the event of a serious incident. It is expected that during a shift the coaches will
DESCRIPTION
normally be parked at a temporary car park outside each individual EPC contractor
access gate.
10-14245-0000 ISSUED FOR PROPOSAL
EPC contractor shall assess whether coaches should be provided that can be
sealed against toxic gas ingress and have breathing air systems to protect the
coach crew and passengers.
Windsocks shall be provided to visually warn which direction a vapour cloud release
may drift. Personnel on site will escape across wind away from the release point,
so if the release were to drift towards the coach park, personnel would be directed
JO/EWO
16 AUG 2020
11 NOV 2019
DATE
Evacuation practices and procedures in place for the operational facility may be
utilised by EPC Contractors as a basis for further development and use during the
REV. NO.
D
B
DISCIPLINE
ENGINEER
________________
Construction activities should not compromise the evacuation routes for vehicles
DATE ___________
leaving the construction area at the Project site.
PROJECT
ENGINEER
________________
An EPC Contractor shall develop the ERP and Evacuation procedures and
DATE ___________ incorporate any findings arising from the Building Risk Assessment (BRA) and
CERTIFIED
Simultaneous Operations (SIMOPs) studies especially in relation to a vapour cloud
________________
release from the adjacent process areas.
DATE ___________
CONSTRUCTION
AGENCY
6. RESCUE
________________
DATE ___________
OPERATIONS Full BA, stretchers, first aid materials, mobile and portable fire extinguishers should
_______________ be located strategically throughout the site to facilitate the recovery of injured
DATE ___________ personnel at each phase of the project. It is expected that there will be an
Emergency Response Team (ERT) which will consist of firefighters and ambulance
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
equipment provided for the facility. Training in the use of such equipment shall be
OF THIS DRAWING IS COVERED, FOR ALL
given to personnel and written instructions shall also be provided with the
equipment at the storage location.
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Staging areas shall be provided for the ERT close enough to the incident to allow
CERT
for a maximum 5-minute response time, but not so close as to interfere with incident
ST
ST
ST
commend operations. The location of the staging areas shall be based upon
ENG'G
prevailing wind conditions, the plant layout, and the nature of the emergency and
AS
AS
ST
During plant layout, plant roads shall be arranged to provide access to all sides of
a process unit for firefighting and rescue vehicles to facilitate emergency response
and rescue activities.
DESCRIPTION
Escape and evacuation routes are shown in separate layout drawings (e.g. JD-
081206-002)
10-14245-0000 ISSUED FOR PROPOSAL
The quantity of items that will be provided and the arrangements for rescue
operations shall correspond to the personnel on site during the construction and
operational phases of the project.
The need for proper protective clothing and equipment (PPE) in a hazardous
environment is critical. There is not one type of protective clothing that will satisfy
the emergency responder protection needs under all conditions.
JO/EWO
16 AUG 2020
11 NOV 2019
Showers and Eye wash stations located and designed in compliance with SAES-B-
DATE
069.
REV. NO.
Such shower with eye bath shall be in accessible locations that require no further
C
D
B
DISCIPLINE
ENGINEER
than 15 m (50 ft.) from a hazard except where specifically allowed (See below) &
________________
no closer than 3 m (10 ft.). The nature, severity, and environment of the chemical
DATE ___________
hazard shall be considered in determining the maximum allowable unobstructed
PROJECT
ENGINEER
distance.
________________
DATE ___________ Outside of the most likely spray paths such as sample and drain points.
CERTIFIED
________________ Along or adjacent to the normal path of egress, free of obstructions, and on the
DATE ___________ same floor level as the hazard.
CONSTRUCTION
AGENCY
In a location accessible from the hazard without the use of stairs, a ladder or a
________________
DATE ___________
door.
OPERATIONS
_______________
Upwind, based on the prevailing wind, of the hazard where practical.
DATE ___________
In more than one place near the hazard if more than one person is likely to be
splashed at the same time.
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
In an area that is well illuminated area lighted (100 lux minimum; refer to SAES-
EDSD
P-123).
At a safe distance at least 3 m (10 ft.) from electrical equipment and power
THIS INDICATES THAT REV. NO. ____________
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
and the batteries shall be at least 1.5 m (5 ft.). Only an eyewash is required in
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
the battery room, provided that there is no acid-mixing activity to be done inside
CERT
the battery room. If a shower is provided with the eyewash, then 3 m (10 ft.)
ST
ST
ST
separation is required.
ENG'G
AS
AS
ST
The site operational and construction leads of Jafurah Downstream Program facility
shall retain information on the capabilities of area hospitals including total beds,
their ability to treat burns and chemical injuries, decontamination facilities, and any
specialised capabilities. They shall also identify the types and amount of specialised
supplies necessary for any specific hazardous material injuries.
DESCRIPTION
During the operational phase of the project, the process of the initial emergency
13 MAY 2020
16 AUG 2020
11 NOV 2019
situation and the responses are monitored and coordinated from the designated
DATE
COMPANY Emergency Response Centre (ERC). The liaison with service providers
such as firefighters and emergency ambulance should also be coordinated from the
REV. NO.
ERC.
C
D
B
DISCIPLINE
ENGINEER
________________
During the construction phase of the project, coordination of the EER facilities and
DATE ___________ the monitoring of the initial emergency will be at the designated assembly point.
PROJECT
ENGINEER However, this may need to be changed as the construction progresses to take
________________ account of the facilities available at each stage.
DATE ___________
CERTIFIED
________________
8. RECOMMENDATIONS
DATE ___________
CONSTRUCTION This EER Strategy identifies a number of recommendations to be incorporated in
AGENCY
________________
the Emergency response plan for each phase of the project at the facility.
DATE ___________
OPERATIONS 8.1 Construction Phase
_______________
DATE ___________ 1. The EPC Contractor shall consult with COMPANY to identify safe
location(s) that can be used as the assembly area(s) for construction
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1. Conduct high level SIMOPS during FEED phase in relation to potential “live”
CERT
ST
ST
AS
AS
ST
routes, and from all points on these common escape routes to the assembly
areas.
4. All escape routes, including those involving staircases, should permit
10-14245-0000 ISSUED FOR PROPOSAL
16 AUG 2020
11 NOV 2019
the situation. The average time needed to clear areas that contain hazards
C
D
B
DISCIPLINE
ENGINEER
to personnel should be used to determine the period during which recovery
________________ measures must keep escape and evacuation routes viable.
DATE ___________
PROJECT 8. In plant area safety signs and arrows showing the direction to the closest
ENGINEER
escape route and exits to safe locations should be placed at regular
________________
intervals.
DATE ___________
CERTIFIED
9. The EPC contractor shall liaise with operators and site emergency response
________________
DATE ___________
providers to ensure that an integrated emergency response, evacuation and
CONSTRUCTION rescue strategy is developed.
AGENCY
________________ 10. The site emergency response plan should be fully developed in the EPC
DATE ___________ phase.
OPERATIONS
_______________ 11. Building internal signs should be photo luminescent and other signs should
DATE ___________
be either light reflective or photo luminescent as appropriate.
DATE _____________
CONTROL NUMBER
BY: ______________
12. The occupancy and manning distribution across each of the facilities shall
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14. Provide personnel toxic/flammable gas alarms for personnel working in or
CERT
ST
ST
ENG'G
9. ATTACHMENTS
AS
AS
ST
13 MAY 2020
16 AUG 2020
11 NOV 2019
DATE
REV. NO.
D
B
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
_______________
DATE ___________
DATE _____________
CONTROL NUMBER
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT PHILOSOPHY PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
DWG.TYPE
OF THIS DRAWING IS COVERED, FOR ALL B 11 NOV 2019 10-14245-0000 ISSUED FOR PROPOSAL AS ST
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER
AGENCY
C 13 MAY 2020 10-14245-0000 ISSUED FOR PROPOSAL AS ST
PROJECT
ENGINEER
ENGINEER
BY DRAWING COMPLETION CERTIFICATE
CERTIFIED
DISCIPLINE
BY: ______________
OPERATIONS
CONSTRUCTION
_______________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
(DCC)NO. _______________________________
________________
________________
________________
________________
DATE _____________ D 16 AUG 2020 10-14245-0000 ISSUED FOR PROPOSAL ST ST
JAFURAH
1034-8150-PH-002_REV D3
Saudi Aramco 2616-ENG (10/2002)
PROJECT PHILOSOPHY
SAUDI ARABIA
PLANT .NO
B
INDEX
SAUDI ARABIAN OIL COMPANY
JO / EWO 10-14245-0000
DOC CLASS: 4B
DRAWING NO.
JD-081024
16
16
OF
SHT. NO.
DSN: 4007
D
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.