Professional Documents
Culture Documents
Process Data Sheet: Saudi Arabian Oil Company
Process Data Sheet: Saudi Arabian Oil Company
REVISION CERTIFICATE REV NO. DATE JO/EWO DESCRIPTION ENG'G CERT PMT OPRNS
VERIFICATION
DATE
DATE
DATE
DATE
THIS INDICATES THAT REV NO A OF THIS
DRAWING IS COVERED, FOR ALL CONTROL NUMBER B 4-MAR-20 10-14244-0000 ISSUED FOR DESIGN SP SKP
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY: C 06-MAY-20 10-14244-0000 ISSUED FOR PROPOSAL SP SKP
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
CERTIFIED
DISCIPLINE
hassan.alkhawaja
suresh.pandian
OPERATIONS
15-SEP-21
(DCC) NO. ___________________________
CONSTRUCTION
DATE 15-SEP-21
DATE: D 15-SEP-21 10-14244-0000 ISSUED FOR DESIGN HK SKP
1034-8410-DS-4001_A2
JUAYMAH
Saudi Aramco 2616-ENG (10/2002)
440
440-G-0003 A/B
DRAIN SUMP PUMP
G
PLANT NO. INDEX
PROCESS DATA SHEET
JD-411706
DRAWING NO.
DOC CLASS: 1
4
1
OF
SHT.NO.
D
DSN: 10363
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
REVISION A1 D1 A2
PMT
hassan.alkhawaja
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APP. BY S. PANDIAN SKP S. PANDIAN SKP S. PANDIAN suresh.pandian
DESCRIPTION
JO/EWO
DATE
REV NO.
DISCIPLINE
ENGINEER
DATE
PROJECT
ENGINEER
DATE
CERTIFIED
DATE
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO A OF THIS
PROCESS DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
DRAIN SUMP PUMP DAT 2
440 G JD-411706
JUAYMAH TERMINAL ONSHORE (JTO) OF D
JUAYMAH SAUDI ARABIA 4
1034-8410-DS-4001_A2
Saudi Aramco 2748-ENG (11/2010)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
/ PUMP Mfr. TOTAL DIFF. HEAD FT
/ SIZE & TYPE TOTAL DISCH. HEAD FT
/ SERIAL NO.
10-14244-0000
DRIVER TYPE
DATE
THIS DATA SHEET COVER 1 WORKING + 1 STAND-BY PUMP(S) SUCTION NOZZLE CL ABOVE GRADE FT
PUMP MARK NO(S): 440 G 0003 A/B , G DATUM ELEVATION (GRADE) FT
G , G NPSHA AT SUCTION NOZZLE CL FT
REV. NO.
G , G
C
LCC EF $ / Kw
BARREL WALL THICKN. IN
DESIGN OPERATING DATA BARREL OD IN
BARREL LENGTH FT
SERVICE CL 1st STAGE IMPELLER
OPERATIONS/DATE
TO CL SUCTION NOZZLE FT
CONTINUOUS INTERMITTENT STANDBY
ATTENDED UNATTENDED
REQUIRED (SAUDI ARAMCO)
REVIEW FOR KEY DRAWINGS
CHARACTER OF SOLIDS: PULPY GRITTY HARD SOFT STATIC LEVEL (DRUM HLL) FT -2.69
GAS IN FLUID: NONE VOL. % UNKNOWN
PRINCIPAL CORROSIVES: NOTE P10
P H CI NOTE P3 PPM PUMPING LEVEL (DRUM LLL) FT -6.84
ENGG./DATE
FOR CLOSED SUCTION SYSTEMS: ENTER DATA ON FIG. 1 MOUNTED ON STRUCTURAL STEEL
NPSH AVAILABLE AT SUCTION FLG.
AT RATED CAPACITY FT 35.59
AT 120% OF RATED CAPACITY FT 28.67
REVISION VALIDATION
PROCESS DATA SHEET DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
P1. THE NUMBER OF SUMP PUMPS SHALL BE 2X100% , ONE OPERATING AND ONE STAND-BY. AND THESE PUMPS
REVISION DESCRIPTION
ARE EXPECTED TO BE USED TO TRANFER VARIOUS LIQUIDS INCLUDING JAFURAH CONDENSATE, KHUFF
CONDENSATE, ARABIAN MEDIUM CRUDE OIL, ARABIAN LIGHT CRUDE OIL, ARABIAN EXTRA LIGHT CRUDE
OIL AND MIXTURE OF VARIOUS OILS AND WATER.
P2. THE SUMP PUMP IS SIZED USING ARABIAN MEDIUM CRUDE OIL PROPERTIES. HOWEVER VENDOR TO
CONFIRM THE PUMP SHALL BE ABLE TO PROVIDE THE REQUIRED HEAD FOR OTHER FLUID SERVICES AS
MENTIONED IN NOTE P1.
P3. REFER BASIS OF DESIGN DOCUMENT: JD-410036 FOR COMPOSITION AND PROPERTIES FOR FLUIDS
MENTIONED IN NOTE P1.
P4. PUMP SHALL BE OPEN IMPELLER / NON-CLOG TYPE. PUMP SHALL BE DESIGNED FOR A TOTAL SUSPENDED
15-SEP-21
DATE
10-14244-0000
INCLUSIVE OF ALL TOLERANCES AND SHALL NOT BE LESS THAN 10% OF THE RATED HEAD.
C
P7. PUMPING SYSTEM DESIGN PRESSURE & TEMPERATURE = 115 PSIG & 185 DEG F.
P8. PUMP DISCHARGE NOZZLE CENTERLINE ELEVATION IS ASSUMED TO BE 3.6 FT (1.1 M) AND TO BE
CONFIRMED BY VENDOR.
P9. MOTOR TO BE DESIGNED FOR RATED FLOW END OF CURVE OPERATION.
BY/DATE
OTHER
CONST. AGENCY/DATE
CERTIFIED/DATE
DESIGN CERTIFICATION
(DESIGN AGENCY)
ENGG./DATE
IS COVERED, FOR ALL APPROVAL
PROCESS DATA SHEET DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.