Professional Documents
Culture Documents
J910-YQ01-P0ANA-145013 - 2 - Lighting System Installation Notes & Details (Approved)
J910-YQ01-P0ANA-145013 - 2 - Lighting System Installation Notes & Details (Approved)
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
16A
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
EXIT
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
APPROVED
by OE
20-May-21
FOR CONSTRUCTION
Approved
By IRT on May 22,2021
GRAPHIC SCALE
Jawa 9&10 Coal Fired Steam Power Plant_Design Review Comment Sheet
From : HK Document Controller
To : IRT Mr. Salam Syah Comment Sheet Document No : J910‐YQ01‐P0ANA‐145013_CS
cc : TEPSCO Mr. Kubota Hiroshi
Dwg Title : LIGHTING SYSTEM INSTALLATION NOTES & DETAILS
Dwg No : J910‐YQ01‐P0ANA‐145013
Purpose : FC
Review Category
A = Approved
B = Approved with comments, forward final document C
C = Not Approved
I = Accepted for reference (For information only)
No. Rev. Sheet/ Page/ Sect. O/E Comment Consortium Response Status
And the illumination installation document can be used for complete power plant.
(Excluding the switchyard, FGD structure, CHS structures and Boiler structures.)
[Additional Information] EPC Consortium update the symbol each fixture and
2 0 3,4,9 / ‐ / ‐ Closed
related notes to match with current design and avoiding any dispute
[Additional Information] EPC Consortium revise color for wires to match with PUIL
3 0 3 / ‐ / ‐ Closed
2011 (latest Indonesian Standard)
This is not hanger for lamp holder, this is hanger for false ceiling. Therefore fixture
( General Comment )
of lamp will clip on to false ceiling.
please add a description of the length of the hanger from the lamp holder to
4 0 5 / ‐ / ‐ The hanger length will be approximately 1 to 1.2 Meter and Material will be Gripple Closed
the concrete, hanger material and the connection between the hanger to the
Cable or Anchor Rod as per the Civil Layout. Hence it will be decided by the Civil
concrete.
scope.
for installation, please refer the regulations listed in the Indonesian National
6 0 9 / ‐ / ‐ Noted. Closed
Standard (SNI)
Please add not only for exit directions but for other directions such as: Only Illuminated exit sign will be provided in the lighting layout drawing.
1.Stairway directions Any other signages such as stairway directions , direction for evacuation route and
7 0 9 / ‐ / ‐ 2. Emergency exit directions others shall be considered without light and shall be designed as per site condition Closed
3. directions for the evacuation route and indonesian regulation.These signages will not be indicated in lighting layout
4. and others drawing.
The style of light should be discussed with the Owner over the catalogs later. Noted. Once we finalize the lighting vendor, then we will discuss & submit the
8 0 12 / ‐ / ‐ Closed
Please provide recommended style of lights. catalogs as well.
Please refer to Indonesian regulation SNI 7391 2008 Spesifikasi Penerangan Noted. We will apply this standard in details on the specific street lighting layout.
9 0 12 / ‐ / ‐ Closed
Jalanan di kawasan kota (J910‐YE00‐P0UZA‐145053 OVERALL LIGHTING LAYOUT FOR STREETS & ROADS)
No. Rev. Sheet/ Page/ Sect. O/E Comment Consortium Response Status
Please add the information about the battery type emergency light which you Battery with 3 hours backup will be provided foe emergency fixtures which are
10 0 12 / ‐ / ‐ Closed
are planning to use at local control rooms. located in local control rooms, Sealed maintenance free(SMF) batteries.
All the outdoor fixtures are IP 55 protected,Hence there wont be chance of insects
(general Comment)
11 0 12 / ‐ / ‐ entering the fixtures.However we will take it up with lighting vendor to ensure that Closed
Please provide protection /cover for all outdoor lighting from insects
there will not be any insects entry into the fixture.
If you plant to use a suspended mercury lamps or equivalent at the turbine
Noted.
12 0 12 / ‐ / ‐ operation floor, the suspended wires should be doubled for the prevention of Closed
For mercury lamp only, we will double the support (sling wire + steel conduit)
accidental fallout.
For Hazardous Areas, The lighting, Sockets & its accessories shall meet requirement
of IEC 60079 & NFPA 78 as per Contract clause 4.6.17 .1 of Exhibit B‐4.2 Book II Part
10 1 3 Describe about the light at the explosion proof area. Open
4 ‐ B: Owner’s Technical Requirement. The lighting & sockets shall be "Ex" proof
and the type shall be as per the HAZOP study once it is finailzed.
[Additional Information]
11 1 3 ‐ Open
For Fixture type FT‐08, the wattage has been changed from 30W to 40W