Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

GV75 

Quick Start 
Page 1 : Basic Operation 
 
Check Parts List Open the case
The 12V DC power supply, USB‐232 data cable, 
UART cable and extension cable are not in the 
delivery list. Please contact your vendor 
for it.

i n k
l l
Install a SIM Card                        

c
Close the case and tighten the  screw 

u e t i a
Q fide n
Find 

o n Connect  GV75  to  computer  by  USB‐232  data 

C
“PL2303_Prolific_DriverInstaller_v10518.zip”  cable, UART cable and 12V DC power supply. 
in  developer  suite  and  install  the  drive  for 
PL2303. If you have already installed it, please 
go to Step 6.

To computer

To Molex 8pin
connector

Find “Queclink GV75 Manage Tool  Before using GV75 for the first time, please 
Vx.xx.exe” in developer suite and run it to  fully charge the battery and connect the 
configure the running parameters of GV75.   cables correctly.
Please refer to Page 2 for details. Colour Description
Red  Power 
Black  Ground 
Yellow  Digital input 
White  Ignition 
Green  Digital output 
Blue  Digital output 
Violet  TXD 
Grey RXD
Run the Manage Tool. Select correct COM port and  If you want to test GV75 by SMS, then 
input  default password “gv75”. Then press “OK.”  set “Report Mode” to “SMS” and input 
the phone number intended to receive 
SMS from GV75. After that, you can go 
to Step 6. 

k
Set  “Report  Mode”  to  “TCP  Short  Connec‐ Please  contact  your  SIM  card  provider  and 
tion”. Input the IP  address and port number  get the APN information for GPRS. Input it 

n
of the backend server. Please make sure the IP  in GTBSI setting.

l i
address can be accessed over the internet and 

l
the data sent to this address can be received.

e c t i a
u
Q fide n
Press  the  “Send”  button  and  update  the 
parameters  of  GV75.  Then  GV75  can  re‐
port  information  to  your  backend  server 
Set the parameters of fixed time report so 
that  GV75  will  report  its  position  to  the 

n
backend server periodically. Press “Send” but‐
or SMS receiver. 
ton to update the parameters. 

o
The  following  screenshot  shows  how  to  con‐
figure GV75 to report its position every 3 min‐

C
Command has been accepted when utes.
the window below appears.

After these steps, GV75 will have 
some basic tracking functions like 
The following screenshot shows how to 
fixed time report and Geo‐Fence. For 
create a Geo‐Fence  rule. Press “Send” 
button to update the parameters.  other advanced functions of GV75, 
please refer to “GV75 @Track Air In‐
terface Protocol” or visit our website. 
 
http://www.queclink.com  
sales@queclink.com  Queclink
Grace Wang Checked
2017.12.28

You might also like