M.D. K V cosØ I nominal I diseño


TGP 51,207.18 1.73 220.00 0.85 158.29 197.86 3X300

1 TD-AD 8,049.53 1.73 220.00 0.85 24.88 31.10 3X63


2 TD-AU1 2,880.90 1.73 220.00 0.85 8.91 11.13 3X40
3 TD-AU2 3,268.50 1.73 220.00 0.85 10.10 12.63 3X40
4 TD-SH1 541.00 1.00 220.00 0.85 2.89 3.62 2X30
5 TD-SUM 1,187.10 1.73 220.00 0.85 3.67 4.59 3X63
6 TE-COM 1,600.00 1.73 220.00 0.85 4.95 6.18 3X63
7 TD-SH2 281.30 1.00 220.00 0.85 1.50 1.88 2X30
8 TD-MUS 7,798.50 1.73 220.00 0.85 24.11 30.13 3X63
9 TD-AU3 14,743.05 1.73 220.00 0.85 45.57 56.97 3X63
### TD-CAF 3,489.68 1.73 220.00 0.85 10.79 13.48 3X30
### TD-CIS 1,943.00 1.73 220.00 0.85 6.01 7.51 2X30
### TD-SH3 4,392.10 1.73 220.00 0.85 13.58 16.97 3X30
### TD-VIG 2,023.65 1.00 220.00 0.85 10.82 13.53 2X30
2X20

K=r*1.73 ∑ Δ V<5.5V
I L cosØ S ΔV cable
K=r*2
TGP 0.0309 158.29 4 0.85 185.00 0.11 N2XOH(3-1x185+1x50(T))mm2 0.11
1 TD-AD 0.0309 24.88 25 0.85 10.00 2.04 N2XOH(3-1x10+1x10(T))mm2 2.15
2 TD-AU1 0.0309 8.91 46 0.85 10.00 1.34 N2XOH(3-1x10+1x6(T))mm2 1.46
3 TD-AU2 0.0309 10.10 32 0.85 10.00 1.06 N2XOH(3-1x10+1x6(T))mm2 1.17
4 TD-SH1 0.0357 2.89 65 0.85 6.00 1.19 N2XOH(2-1x6+1x6(T))mm2 1.30
5 TD-SUM 0.0309 3.67 54 0.85 16.00 0.41 N2XOH(3-1x16+1x10(T))mm2 0.52
6 TE-COM 0.0309 4.95 58 0.85 16.00 0.59 N2XOH(3-1x16+1x10(T))mm2 0.70
7 TD-SH2 0.0357 1.50 36 0.85 6.00 0.34 N2XOH(2-1x6+1x6(T))mm2 0.45
8 TD-MUS 0.0309 24.11 46 0.85 10.00 3.64 N2XOH(3-1x10+1x6(T))mm2 3.75
9 TD-AU3 0.0309 45.57 44 0.85 16.00 4.11 N2XOH(3-1x16+1x10(T))mm2 4.23
### TD-CAF 0.0309 10.79 80 0.85 10.00 2.83 N2XOH(3-1x10+1x6(T))mm2 2.95
### TD-CIS 0.0309 6.01 46 0.85 10.00 0.91 N2XOH(3-1x10+1x6(T))mm2 1.02
### TD-SH3 0.0309 13.58 74 0.85 16.00 2.06 N2XOH(3-1x16+1x10(T))mm 2.17
### TD-VIG 0.0357 10.82 20 0.85 6.00 1.37 N2XOH(2-1x6+1x6(T))mm2 1.48

ΔV= 1,25(KxLxIxcosØ) / S

TD-SH3 0.0309 20.1048 74 0.85 16 3.052802 N2XOH(3-1x16+1x10(T))mm 3.25


TD-VIG 0.0357 4 15 0.85 6 0.379313 N2XOH(3-1x16+1x10(T))mm 3.43
% Δ V<2.5%

0.05
0.98
0.66
0.53
0.59
0.24
0.32
0.21
1.71
1.92
1.34
0.46
0.99
0.67

1.48
1.56
NIVEL PRIMARIA
STD-01 INICIAL AULA 3 Y
4 AÑOS
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
AULAS 182.36 50.00 9,118.00 9,118.00 75% 6,838.50
PASADIZO Y OTROS 129.47 10.00 1,294.70 1,294.70 75% 971.03
Computadora 1x300W 1.00 300.00 300.00 300.00 80% 240.00

10,712.70 8,049.53

STD-02 INICIAL AULA 5


AÑOS
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
AULAS 60.73 50.00 3,036.50 3,036.50 75% 2,277.38

PASADIZO Y OTROS 48.47 10.00 484.70 484.70 75% 363.53


Computadora 1x300W 1.00 300.00 300.00 300.00 80% 240.00
3,821.20 2,880.90

STD-03 INCIAL
PSICOMOTRICIDAD Y
TOPICO
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
AULAS 87.16 50.00 4,358.00 4,358.00 75% 3,268.50

PASADIZO Y OTROS 80.30 10.00 803.00 803.00 75% 602.25

Computadora 1x300W 1.00 300.00 300.00 300.00 80% 240.00

REFROGERADORA 1.00 500.00 500.00 500.00 85% 425.00

LICUADORA 1.00 500.00 500.00 500.00 85% 425.00

MICROONDA 1.00 1,000.00 1,000.00 1,000.00 100% 1,000.00

TOSTADORA 1.00 1,000.00 1,000.00 1,000.00 100% 1,000.00

8,461.00 6,960.75

STD-04 INICIAL CASETA


DE VIGILANCIA
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
SSHH7+1 54.10 10.00 541.00
541.00 100% 541.00

STD-11 INICIAL
CISTERNA Y TANQUE
ELEVADO
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
AMB. INTERIOR 4.64 10.00 46.40
90.80 75% 68.10
90.80 75% 68.10
AMB. EXTERIOR 4.44 10.00 44.40
ELECTROBOMBA 2.00 1,119.00 2,238.00 2,238.00 50% 1,119.00
2328.80 1,187.10

STD-12 INICIAL PATIO


DE FORMACION
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
REFLECTORES 4.00 400.00 1,600.00
1,600.00 100% 1,600.00
1600.00 1,600.00

TD-SH2
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
SSHH 28.13 10.00 281.30
281.30 100% 281.30

TD-MUS
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
AULAS 1er y 2do. piso 180.80 50.00 9,040.00
10,398.00 75% 7,798.50
PASADIZO 135.80 10.00 1,358.00
10,398.00 7,798.50

TD-AU3 (5-6-7)
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
AULAS 1er. Y 2do. piso 373.28 50.00 18,664.00
19,657.40 75% 14,743.05
PASADIZO 99.34 10.00 993.40

TD-CAF
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
COCINA, CAFETERIA 85.29 10.00 852.90 852.90 75% 639.68
REFRIGERADORA 1.00 500.00 500.00 500.00 85% 425.00
LICUADORA 1.00 500.00 500.00 500.00 85% 425.00
MICROONDAS 1.00 1,000.00 1,000.00 1,000.00 100% 1,000.00
TOSTADORA 1.00 1,000.00 1,000.00 1,000.00 100% 1,000.00
3,852.90 3,489.68

TD-CIS
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
ELECT. PRESION CONST. 7.80 10.00 78.00 78.00 100% 78.00
3X1.00 HP 2.00 1,865.00 3,730.00 3,730.00 50% 1,865.00
3,808.00 1,943.00

TD-SH3
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
Alumbrado SSHH 26.20 10.00 262.00 262.00 100% 262.00
A TD-VIG2 9.01 10.00 90.10 90.10 100% 90.10
Luminaria 400W 8.00 400.00 3,200.00 3,200.00 100% 3,200.00
Luminaria 250W 4.00 250.00 1,000.00 1,000.00 70% 700.00
Luminaria 70W 2.00 70.00 140.00 140.00 100% 140.00
4,692.10 4,392.10

TD-VIG
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
CASETA+GUARDIANIA 11.17 10.00 111.65 111.65 100% 111.65
Alumb. Port. + farolas 4.00 70.00 280.00 280.00 100% 280.00
Reflectores de Patio 6.00 250.00 1,500.00 1,500.00 80% 1,200.00
PODIO TECHADO 54.00 10.00 540.00 540.00 80% 432.00
TOTAL 2,431.65 2,023.65

TGP
AREA CARGA AREAxCARGA CARGA F.D. M.D.
DESCRIPCION
m2 W m2xW INST W % W
TD-AD 10,712.70 8,049.53
TD-AU 1 3,821.20 2,880.90
TD-AU 2 3,036.50 75% 2,277.38
TD-SH 1 541.00 100% 541.00
TD-SUM 2,328.80 1,187.10
TE-SUM 1,600.00 100% 1,600.00
TD-SH 2 281.30 100% 281.30
TD-MUS 10,398.00 7,798.50
TD-AU 3 19,657.40 75% 14,743.05
TD-CAF 3,852.90 3,489.68
TD-CIS 3,808.00 1,943.00
TD-SH 3 4,692.10 100% 4,392.10
TD-VIG1 2,431.65 2,023.65
67,161.55 51,207.18
CALCULO DE LA MAXIMA DEMANDA TG
PASOS: CARGA BASICA 50 W/m2
REGLA DESCRIPCION Pot.Inst. (W) F.D.
1) 050-204 (1) Área total de la Institución educati 4,536.25
2) 050-204 (1) Área total de las aulas
3) 050-204(1)(a) Carga Básica de 50.00 2,341.55 117,077.60
4) 050-204(1)(b) Carga del area
(Las áreas re
restantes 10.00
son 2,160.34
las áreas techadas que 21,603.40
no son aulas y que no requieren de iluminación
especial, tales como oficinas administrativas,
auditorios, corredores, baños, pasadizos, etc.)
NOTA: Las cargas de iluminación de emergencia,
las alarmas, comunicaciones, y otras similares
están incluidas dentro de la carga básica.

5) 050-204(1)(c) Cargas(Centro de comp.,Ilum. exter


Centro de computo 9,300.00
Central Audio + CACI + Refrigeradora + Licuadora 1,500.00
Iluminación Losa deportiva 3,200.00
Iluminación Exterior 3,800.00
Electrobombas (3x1.00HP) 2,238.00
TOTAL PASO (5) 20,038.00
6) 050-204(1)(c) Carga total del colegio
Sumando los pasos (3) (4) y (5) 158,719.00
7) La carga total del edificio menos cualquier carga de calefacción ambiental
Paso (6)-calefacción 158,719.00
8) Ya que el área total del colegio es mayor a 900m2. el paso (8) no se aplica.
9) Aplicación de factores
9(a) carga de calefacción 0.00 0.75
9(b) Carga del edificio sin la calefacció 158,719.00
050-204(2)(a) Local con cargas> 900m2
Potencia 158,719.00 W
Área 4,536.25 m2
La carga por m2. 34.99 W/m2
050-204(2)(b)(iii La carga por los 900 m2 0.75
050-204(2)(b)(iii La carga por los 3,636.25 m2 0.50
Suma resultante
D.M.(W)

0.00

23,617.60
63,614.44
87,232.03