Professional Documents
Culture Documents
0300 0310 010 D Project Charter Form
0300 0310 010 D Project Charter Form
REVISION # 3.0
TITLE PROJECT CHARTER FORM
EFFECTIVE DATE 05/12/2021
Agency:
Project Name:
Business Owner(s):
Business Division:
Portfolio Manager:
Project Manager:
Proposed Start Date:
Proposed End Date:
Implementation Date: (when known)
TCO:
Benefits:
Project Assessment Type: (from
0300-0310-020-D PROJECT ASSESSMENT TYPE High Medium Low
FORM)
PRINTED COPIES FROM THE ON-LINE SYSTEM ARE CONSIDERED UNCONTROLLED. IT IS THE RESPONSIBILITY OF THE PERSON USING A PRINTED
COPY TO VERIFY THE COPY THEY HAVE IS THE LATEST REVISION IN THE ON-LINE SYSTEM.
3.8 Dependencies
PRINTED COPIES FROM THE ON-LINE SYSTEM ARE CONSIDERED UNCONTROLLED. IT IS THE RESPONSIBILITY OF THE PERSON USING A PRINTED
COPY TO VERIFY THE COPY THEY HAVE IS THE LATEST REVISION IN THE ON-LINE SYSTEM.
PRINTED COPIES FROM THE ON-LINE SYSTEM ARE CONSIDERED UNCONTROLLED. IT IS THE RESPONSIBILITY OF THE PERSON USING A PRINTED
COPY TO VERIFY THE COPY THEY HAVE IS THE LATEST REVISION IN THE ON-LINE SYSTEM.
Concur
Agency PMO
Non-Concur
Concur
Additional (list)
Non-Concur
Title Name Signature Approval Comments Date
(MM/DD/YYYY)
Agency CIO Yes No
Agency CFO Yes No
The signatures above indicate an understanding of the purpose and content of the Project Charter. By signing this document or
emailing approval of this document, they are agreeing to approve the Project Charter.
PRINTED COPIES FROM THE ON-LINE SYSTEM ARE CONSIDERED UNCONTROLLED. IT IS THE RESPONSIBILITY OF THE PERSON USING A PRINTED
COPY TO VERIFY THE COPY THEY HAVE IS THE LATEST REVISION IN THE ON-LINE SYSTEM.