General Data Sheet (GDS) 1 PROJECT INFORMATION FORM GDS Page 1 of 1 R

E
Quote No : PH-Q076-22 Rev No: 02 Date: 8-Jun-22 For order entry ✘ For Quotation V

This sheet is applicable N


Job No: J02622PH CO No: Date: o
to entire project
Project Name: BALAYAN SPORTS COMPLEX No of all Bldgs. in this Project: 1 ###
GENERAL
1
INFORMATION
Location: Balayan, Batangas No. of Non Identical Bldgs. in this Project: 1
Building Use: Sports Stadium Total Weight of All Bldgs. in this Project: TBE
Letter of intent issued by customer on (Date) : ###
CURRENT VIS Standard Quotation Offer signed by customer on (Date):
2 CONTRACT
STATUS
VIS Standard Contract signed by customer on (Date):
✘ Others (Explain):

Terms of penalty: ###


3 PENALTY
Max. Penalty as % of Contract Price: 5% ✘ Others (Specify):
Delivery Commitment (weeks): ###
Delivery by: by VIS Steel Customer pickup✘ Partial shipment allowed

4 SHIPMENT Overland to: ✘ Sea freight to: CIF Manila South Port

✘ Sea freight ✘ Container Export document by: ✘ VIS Steel by others

Design Calculation Preliminary Design Sheet ✘ Preliminary Column Reactions ###


REQUIRED INITIAL
5 ENGINEERING Approval Drawings Anchor Bolts Plan Record Drawings
SUBMITTALS
Erection Drawings ✘ Proposal Drawings
Anchor Bolts by : ✘ VIS Steel by others
ANCHOR
6
BOLTS Ship Anchor Bolts : With Job ✘ Prior to Job Ship by: Overland ✘ Sea freight (Less Container Load)
Air Freight

Name : Email:
Phone: Fax:
BUYER
7
(Invoice To) Address:
CONSIGNEE Contact Person: Position:
Name : same as buyer Mobile:
8 Phone: Fax:
SHIPMENT
Address: Email:

(Ship To) Name: same as buyer Mobile:


9
Fax: Email:
10 CONTRACTOR
ADVICE TO
11 CONSULTANT
12 ENDUSER
Erection by: VIS Steel ✘ By Others Erector Name: John and Kove Metal Fabrication Services
13 ERECTION Erection Supervisor by VIS Explain details:
✘ VIS Checking of Materials Once Arrived on Site

14
PRIMARY Surface Preparation : Power clean ST3 ✘ Shot-Blasting SA 2.0 Shot-Blasting SA 2.5 Hot-Dipped Galvanized
MEMBERS
Purlin Clip to Column / Rafter: Yes ✘ No

Alkyd Paint (see below) ✘ Special Paint (see below)


Coat No. DFT (microns) Paint Type Manufacturer Color
1 60 Epoxy Primer Hempel Gray
2 60 Epoxy Top Coat Hempel TBE

PRIMARY
15 MEMBERS
PAINT SYSTEM

Purlin Z275, G450, Please design the most economical purlin, girt spacing:
type Lapping VIS Standard Note:
45.0kN/cm2 Z- Purlin Depth can be: Z150, Z200, Z250, Z300
Surface Preparation: Wash Primer Treatment over Galvanized
✘ Pre-Galvanized Special Paint Over Galvanized
Paint System: Special Paint (see below)
Coat No. DFT (microns) Paint Type Manufacturer Color
SECONDARY
MEMBERS
(Purlins, girts, eave
16 strut, flange brace,
sag arrestor)
Standard is Pre-
Galvanized

17 ATTACHED ✘ GDS ✘ BDS1 ✘ BDS2 BDS3 Rev./C.O ✘ Customer Drawings Sketch Drawing
18 CHECKING Filled by: INO RODRIGUEZ Checked by: Date: 8-Jun-22

✘ Double Side Welding


SPECIAL PROJECT
19 QUALITY UT Test (if more than VIS ITP Standard of 10%)
REQUIREMENTS
Third Party Inspection
✘ Design Dept. Detail Dept. ✘ BCD Dept. ✘ Sales Dept. Marketing Dept. Project Management Dept.Production Finance

QF-SLS-01 R02 14/05/21


Building Data Sheet 1 PROJECT INFORMATION FORM This building only: Page 1 of 2
Quote No : PH-Q076-22 Rev No: 02 Date: 8-Jun-22 For order entry✘ For Quotation
Bldg. No: 1 Area No: 1
Job No : J02622PH CO No: 0 Date: 30-Dec-99
This area only: Page 1 of 2
Customer name : 0 Location : Balayan, Batangas
GENERAL
1
INFORMATION Project name : BALAYAN SPORTS COMPLEX Qty of Identical Bldgs. : 1 Total No. of Areas: 1
Building usage: Sports Stadium Estimated No. of trucks / containers for all identical bldgs. : TBE
Live Load (On Live Load (On Collateral Load (On Yes (see
0.57 0.30 KN/m2 see below KN/m2 Seismic Load:
Purlins): Frames): Frames & Purlins): below)
Wind Speed (KMH): 260 Recurrence time Exposure : C Rainfall 300 mm/hr.
DESIGN Description of Collateral Load: DIGITAL SCOREBOARD Occupancy Category: II
2 LOADS
(kN/m2) Building Code: ✘ MBMA2012 ✘ IBC2012 Design Standard: ✘ ANSI/AISC-360-16✘ AISI 2012 ASCE-7-05/10
Deflection Criteria: ✘ Follow VIS Standard (MBMA 2012) Follow Requested of Client (see attached)
1. Seismic Load: Zone 4 (Na= 1, Nv=1)

Primary member : ASTM A572 Gr.50 or equivalent having Min. yield stress 345N/mm2
3 STEEL GRADE Secondary member : ASTM A653 SS Gr.65 or equivalent having Min. yield stress 450N/mm2

Frame Type : Clear Span (CS) Slope : 3/31.450 Height (m) : 7.70 Clear H
Bldg. Width (m): 54.50m int to int of steel column Width modules: See below
Length (m): 55.82m center to center of steel column Ridge Condition: Symmetrical
Bay Spacing (m): Use the most economical bay distance (BY VIS) Columns support: Designed by Engg.
1. FFL is at Elev. +0.00m
4
BUILDING 2. Finished Grade Line is at Elev. +/-0.00m
PARAMETERS 3. Top of Pedestal is at 1.50m and measured from FFL +0.00m

4. Perimeter roof overhang is 2.00m


5. Apex height 12.00m is measured from EL +0.00m
6. There is 01 scoreboard (300kg) will be hanged on center point of the building. (Its support by others)
Note: Width modules use the most econimical bay distance (BY VIS)

Left End Wall Frame: See DWG Wind Col. Spacing (m):
Right End Wall Frame: See DWG Wind Col. Spacing (m):
ENDWALL Left End Girt type: No girt Right End Girt type: No girt
5
CONDITION Near Side Girt type No girt Far Side Girt type By-Pass

Length Grid Line Height


Location Open for Bracing Type
(M) From To (M)
NSW Full 7.8m open / Sheeting above X-Bracing
FSW Full 7.8m open / Sheeting above X-Bracing
LEW Full 7.8m open / Sheeting above X-Bracing
REW Full 7.8m open / Sheeting above X-Bracing
OPEN WALLS
Lengths are
6 measured from
corner of NSW &
LEW

Interior Column Bracing Allowed: No Type of Interior Column Bracing:


All Walls open 7.8m height from Sport center FFL +200mm

✘ By VIS SteelPanel is : 0.5mm TCT Pre-Painted Panel Profile: 5 ribs

By Others Color:
7 ROOF Insulation by By VIS Steel By Others
Thickness: WMSK Density:

✘ By VIS SteelPanel is : 0.5mm Thick TCT Pre-Painted Panel Profile: 5 ribs


By OthersColor:
8 WALL Insulation by By VIS Steel By Others
Thickness WMSK Density

✘ Gutters & Downspouts, Eave Trim,


9
Curved Eave with projection, w/o Gutters & Downspouts,
✘ w/Valley Gutters & Downspouts,
Downspouts: Metal PVC
EAVE Curved Eave w/o projection, w/o Gutters & Downspouts,
w/Valley Gutters & Downspouts,
Downspouts: Metal PVC
CONDITION
Gutters & Downspouts by VIS

Color of gutters , down spouts , Eave trim :

WALL TRIM
10
COLORS Color of other flashing, trim :

QF-SLS-01 R02 14/05/21


###
Building Data Sheet 2 PROJECT INFORMATION FORM This building only: Page 2 of 2 R
E
Quote No : PH-Q076-22 Rev No: 02 Date: 8-Jun-22 ✘ For order entry ✘ For Quotation V

N
Bldg No: 1 Area No: 1 o
Job No : J02622PH CO No: 0 Date: 30-Dec-99
This area only: Page 2 of 2
Wall Location Soffit Panel Insulation ###
ROOF Quantity Width (M) Length (M)
Location Grid Lines By Description Yes/No By Description
EXTENSION
(Roof Panel is NSW 2 58.5
same as main
roof panel) FSW 2 58.5
LEW 2 59.82
11
REW 2 59.82

Roof extension along End walls and side walls

Wall Clear height Location Roof Panel Soffit Panel


Qty Width (M) Length (M) Eave condition Slope
Location (M) Grid Lines By Description By Description

12 CANOPY

Wall Length Proj. Location Fascia panel Soffit panel Backup panel
Qty Type Height (M)
Location (M) (M) Grid Lines By Description By Description By Description

13 FASCIA

Wall Width Height PD,Window,RUD, Sill Level from FFL Location


Quantity Purpose of Framed Opening Remarks
Location (mm) (mm) Louver: Supply BY (mm) Grid Lines

FRAMED
14
OPENING

✘ Cols ✘ Beams ✘ Joists ✘ Deck ✘ Handrails ✘ Apply loads only


Top of Mezzanine Floor Landing
Mz DL LL Coll Area Stair Width Tread Hand
Slab Qty
No (kN/m2) (kN/m2) (kN/m2) (m22) Type T (mm) Type (mm) Mid Top Type Rail
(M)

15 MEZZANINE

QF-SLS-01 R02 14/05/21


16 CAGED LADDER

ROOF Width at throat (mm): Height (mm): Roof Slope: Length(mm):


Eave Condition: Roof Panel & Color: Overall Width (mm):
17 Side Wall Condition: End Wall Condition:

MONITOR VIS Steel Scope: Only Apply Loads Design and SupplyScope of Supply: None
Columns+ Beams+Joists+Decking ###
Design Loads KN/m2 Width Length Clear Ht. Floor Handrail Location
No.
Dead Load Live Load Other Load (M) (M) (M) Type T (mm) By Type Length (M) Grid Lines
ROOF
18 PLATFORM /
WALKWAYS

RV Type: NON-STANDARD Description


Quantity Length (M)
19 RIDGE VENT

Min. Hook
Scope of Supply: Only Apply Loads Crane Beams & Brackets✘ Rails
Wheel
✘ Crane system ✘ Bracket only
Power Supply. Volts: Hz: Phases: Bumper
Manufacturer:

Crane Span Runway Length Capacity Wheel Base Top of Crane Bridge Trolley Operation
No.
Type From To From To (M.T.) (mm) beam (mm) Weight (kg) Weight (kg)
Width (m)
GL GL
L (m)
GL GL Height Type
(mm)
Load (mm)
(kN)

CRANE
20
INFORMATION

No. of Cranes can operate at the same time in same bay:


1 Crane Only 2 Cranes 3 Cranes
Note: Crane rail shall be supplied and installed by Crane supplier.

21 ATTACHED ✘ For This Building/ Area Only ✘ BLDG.Data Sheet 2 ✘ BLDG.Data Sheet 3 ✘ Rev./C.O.

QF-SLS-01 R02 14/05/21


REV / CHANGE ORDER NO.01 INFORMATION ( date 22.09.2022)
Item No. Description of Changes
1 Relocating the columns and baseplates to the center of the pedestals.

QF-SLS-01 R02 14/05/21