Professional Documents
Culture Documents
Gate Pass Challan
Gate Pass Challan
•Purpose
Procedure & Guideline for inspection of Incoming engineering & Raw material.
• Responsible person
Store officer
• Procedure
• The Incoming Engineering material will be inspect as per the drawing provided by
Planning. Format No-
• All Raw material will check for physical parameter as per Format-
• If there is a material of stainless steel, then its grade will be checked by the test kit.