9
Cost of the Project
Cost of 2 KLPD Ethanol Plant including Corn Oil Expeller system=
20500000.00
Cost of Boiler (3 TPH) & its Accessory : 800000
GST 18%=3834000.00
Total= 25134000.00
Area Required: 25000 SqFt
Land Cost:
Cost of Construction (Office, Lab, Water Borewell & Boundary Wall, Etc)=
2000000.00
Variable Cost = (Raw Material, Power, Chemical): 3015000.00
Raw Material=18.00
Monthly Requirement:150000 Kgs
Total Cost: 2700000.00
Power: 7/Unit
Monthly Bill: 75000 (Approx)
Chemical: 600 Kg
Labour Charges: 240000.00
Total Cost (25134000+2000000+3015000) = 30149000.00
10
CALCULATION:
Total Investment: 30149000.00
11
Licence
1. PESO – Explosive Licence
2. Environmental Clearance
3. Fire –NOC
4. GST
5. MSME
6. Excise
12
ETHANOL BUYER
Other Buyers:
1. Medical Company
2. Perfume Company
3. Paint Company
4. Cosmetic Company
13
SUBSIDY
Govt of India provide Subsidy on the ethanol plant by two means…
1. Principal Subsidy 40% of Project Cost (Includes Plant, Land,
Construction) (From State Govt) Percentage may differ from state to
state
2. Interest Subsidy on rate of Interest on loan(50% of Interest or Max of
6%) (From Central Govt)
DIC (District Industrial Centre) & MSME is Department for the approving of
Subsidy on the project.
14
Payments
Complete payment is divided into equal installments.
• 20% along with PO.
• 20% on submission of final layout of the plant
• 20% before dispatch of first consignment.
• 20% before dispatch of final consignment.
• 20% after complete installation & commissioning.
15