Package No.

: PESSCM-1/W1
Package Name : Project for Establishment of Sewerage System in
Chattogram Metropolitan – Phase 1 (PESSCM-1/W1)
Purchaser : Chattogram Water Supply and Sewerage Authority
PMC : Consulting Engineers - JV of ERINCO BETS-DEVCON-IWM
Contractor : Taeyoung Engineering & Construction Co., Limited
Ref. No: TY-SN-0014
REQUEST FOR INSPECTION & APPROVAL
Submission Date:
30-Jan-23
“Design, Construction, Supply, Installation, Testing and Commissioning of 100
MLD Sewage Treatment Plant; 300 cum/day. Fecal Sludge Treatment Facility
Project Title:
and Sewerage Network for North-Middle Halishahar and adjoining areas of
Chittagong Metropolitan on Turnkey Basis”

Description of works to be inspected and to attach inspection checklist/ documents/ drawing□. Civil
We hereby inform you that the following work will be ready for your inspection : □. Electrical
□. Mechanical
Checking House Connection Survey Work Data at Sewer Network (Area: Block-K&L , As per □. ETC .( )
attached Documents)

Location of Work: Sewer Network Site

At Time : 10:00AM On date : 30-Jan-23


Name :
For : Taeyoung E & C Signature :
Date :

Contractor's Consultant Comments: Inspection time :


Inspection date :

Commented by : Supervised by :
Signature : Signature :
Designation : Designation :
Company : Company :

Work: Approved Approved subject to above comments Not Approved

INSPECTION BY PMC TO PROCEED: YES/ NO


(if no please state the reason) :
PMC Comments:

Inspection time :
Inspection date :

Verify by :
Signature :
Designation :
Project for Establishment of Sewerage System in Chattogram Metropolitan – Phase 1 (PESSCM-1/W1)
Inspection Sheet for Rebar Cage of Service Pile (Pile Serial No - )
Part of Structure to be poured : Test Pile

Drawing No. referred to : PESSCM-1/STP/BTF/C/035; PESSCM-1/STP/BTF/C/036

Pile Type (Diameter of the Pile) : DIA 600 MM


Pile Reference No. (Location) Biological Treatment Facilities (No-01)
Date of Inspection :

Results

No Description Inspection Method Contractor's Check Consultant Engineer's Remarks Remarks

Pass Fail Pass Fail

1 Check rebars are placed as per drawing Visual

2 Check number of rebars Visual

3 Check rebars are straight Visual

4 Check the dia of rebars Visual

5 Check the spacing of rebars Visual / Measured

6 Check the lap length Visual / Measured

7 Check the clear cover Visual

8 Check the bar spacers (Concrete blocks) Visual

9 Check the rebars welded as per drawing Visual / Measured

10 RMC Plant Visit

Comments if any:

Requested by :Contractor Representative: Checked & Approved by : Contractor's Consultant


PROJECT : SEWAGE TREATMENT PLANT – PHASE 1 (PESSCM-1/W1)
CONTRACT NO : PESSCM-1/W-1

CONSULTANT CONTRACTOR:

DATE: RFI REF. : TY-STP-G000 _ _


Pile Boring Log Sheet
LOCATION Biological Treatment Facilities (No-01). Coordinate

Pile ID: Casing Top: Northing Easting

SL Pipe Length Total Legth Start Time Finish Time Total Time Soil Condition REMARKS

SECTION CONTRACTOR CONTRACTOR'S CONSULTANT

NAME:

SIGNATURE:

DATE:
Package No.: PESSCM-1/W1

Package Name : Project for Establishment of Sewerage System in


Chattogram Metropolitan – Phase 1 (PESSCM-1/W1)
Purchaser : Chattogram Water Supply and Sewerage Authority
PMC : Consulting Engineers - JV of ERINCO BETS-DEVCON-IWM
Contractor : Taeyoung Engineering & Construction
Ref. No: TY-STP-G000_ _
Checklist for Pile Concrete (Test Pile)
Job Site : Test Pile

Part of Structure to be poured : Biological Treatment Facilities (No-01)

Drawing No. referred to : PESSCM-1/STP/BTF/C/036; PESSCM-1/STP/BTF/C/036

Estimated Volume of Concrete (cum) :

Slump :

Compression Strength : 28 MPA

Method of Pouring : Manual Trimi Pipe Pump Others(specify)

Class of Concrete : Grade 28

Scheduled Date of Boring :

Item Contractor's Check Inspector/Junior Engineer's Remarks


1.Pile serial no
2. Elevation at Pile Point
3. Boring Depth
4. Length of Pile
6.Boring Start Time
7.Boring Finish Time
8.Wash Start Time
9.Wash Finish Time
10.Rebar cage lowering start time
11.Rebar cage lowering finish time
12.Pouring Start Time
13.Pouring Finish Time
14.Clear Cover of Pile
15.Concrete Slump
16. Density test on Bentonite(less than 1.10 g/ml)
17. PH test on Bentonite (9.5 to 12.0)

Comments if any: