Report 10 - Sluice Gates EE-SP2-3-B3

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
Surface profile test FREE: DCS According to: ISO 8503-5:2003 Replica tape method ‘Order Now: Project name: [Dater 20220560 ARCELOR Location: Moerdijk Company: Des Meter: ‘Accepted: Tefles PRESS-OFILMT HT 100ns- : a 2k 9 00 iy Sa Reading: [ape No: Tested object: [Reading: Required: Accepted: Required: Accepted: Tested object: Required: ‘Accepted: Tested object Reading: Required: bes MRS Ree DCS ORECHT COATING SERVICES RELEASE NOTE Project name: Piles - Jordan Dike Expansion Order number: East SP2-3 20220580 Project specification: ITP20220580Rev6; CS20220580Rev6 Item: Sluice Gates EE-SP2-3-B3 Date: 22.12.2022. Phase of inspection: Steel dressing inspection Blasting inspection Ast coat inspection 2nd coat inspection 3rd coat inspection Final inspection © 00000 By signing this document all parties involved agree that the above stated phase of inspection is accepted (or accepted with comments) in accordance with all applicable specification for the project and that the items are released for the next phase of production, where applicable. ‘Comments: Sen ACS. = Sluicerome hes dey stray /oueshray be cegeires = Qerholer te Qudeve Acec, Comments conclusion: Des Arcelor Projects bv

You might also like