Professional Documents
Culture Documents
Report 23 - Sluice Gates EE-SP2-3-B30
Report 23 - Sluice Gates EE-SP2-3-B30
: 23 Page 1 of 17
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Surface preparation
Start End Location
Blasting Sa 2½ (SSPC SP5) 23-1-2023 08:00 23-1-2023 13:00 Blast hall
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Application
System : 1 - External DFT (microns)
Coat DFT WFT Color Min Mean Max
1 Intergard 251 (International Paint (Neder 70 111 Red 53 89 123
2 Interzone 954 (International Paint (Neder 200 235 Black 223 352 508
3 Interzone 954 (International Paint (Neder 200 235 Lightgrey 422 595 1080
4 Interthane 990 (International Paint (Nede 50 88 Standard Black 502 697 1210
Details Application
System : 1 - External
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
107 - 115 8
120
100 - 107 13
100
92 - 100 8
80 DFT
84 - 92 23
DFT
60 76 - 84 24
40 69 - 76 12
61 - 69 9
20
53 - 61 3
0
Measurements 0 10 20 30
Num ber of Measurem ents
Number 112
Mean 89
Min 53
Max 123
St dev 17
121 79 79 88 81 74 76 77 88 84 87 62 88 82 82
74 86 74 83 98 106 88 104 98 120 86 86 123 120 101
109 91 108 89 89 101 101 98 90 91 84 104 83 110 81
107 107 121 67 109 76 67 93 89 78 82 76 83 85 82
112 119 120 104 119 99 99 85 112 77 78 79 81 89 85
77 123 106 79 74 62 64 118 92 118 112 110 83 87 100
80 105 61 88 100 73 61 84 75 74 73 65 75 53 62
98 85 54 86 54 86 121
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
445 - 476 17
500
413 - 445 4
400 381 - 413 10
DFT
350 - 381 30
DFT
300
318 - 350 25
200
286 - 318 37
223 - 255 7
0
Measurements 0 10 20 30 40
Num ber of Measurem ents
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Number 150
Mean 352
Min 223
Max 508
St dev 67
456 472 358 328 368 329 455 344 366 487 508 491 364 291 305
308 295 306 292 279 287 360 466 337 369 402 375 304 315 291
282 320 311 351 505 288 364 433 350 340 402 468 405 444 463
445 467 376 404 353 295 363 311 312 328 373 325 320 402 441
401 276 487 316 453 365 438 223 480 287 375 373 455 454 298
303 316 282 315 368 346 285 353 305 358 375 336 376 248 226
277 276 362 466 357 473 253 297 302 480 294 320 257 402 251
305 363 399 360 376 347 292 326 406 349 277 363 305 276 299
328 454 315 317 308 404 318 359 295 253 246 453 297 282 298
328 278 321 322 302 326 282 347 310 349 363 338 318 456 464
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
600
568 - 641 57
400
495 - 568 63
200
422 - 495 20
0
Measurements 0 20 40 60 80
Num ber of Measurem ents
Number 196
Mean 595
Min 422
Max 1080
St dev 91
558 558 611 698 1080 546 605 428 538 532 513 582 683 651 687
609 583 591 547 539 532 535 518 507 483 625 517 566 611 516
623 637 569 516 504 622 673 672 514 528 524 542 528 529 579
493 638 422 533 564 512 748 659 523 543 564 738 593 743 546
545 674 683 520 735 644 551 639 676 645 581 557 558 617 567
655 645 629 541 532 738 482 627 657 598 531 542 598 580 612
515 595 516 504 448 471 664 496 446 605 526 585 663 670 672
760 653 635 600 659 729 678 669 699 623 694 614 665 657 614
678 724 519 732 657 491 642 611 676 688 1020 486 490 639 577
517 478 745 677 630 662 493 595 630 571 526 532 515 627 674
670 642 484 612 543 515 594 586 691 585 613 609 675 658 677
512 608 498 469 587 954 587 575 551 505 631 481 528 567 659
685 630 570 579 488 550 446 581 549 591 587 559 519 485 484
536
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
31-1-2023 11:00 13:00 Standard Black Paint hall at Moerdijk Havennr. 086
Batchnr. 2242293003 Hardner. : 2332278010 Appl. method: airless paintspraying
Batchnrs. thinner : N/A
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
600
659 - 738 70
400
581 - 659 78
200
502 - 581 12
0
Measurements 0 20 40 60 80 100
Num ber of Measurem ents
Number 207
Mean 697
Min 502
Max 1210
St dev 104
874 629 643 641 508 563 613 884 782 722 861 849 783 825 659
702 698 683 651 697 681 626 648 614 650 697 706 705 779 882
823 895 610 678 828 883 515 831 921 857 607 894 731 1210 634
830 660 734 621 621 701 732 630 677 720 676 645 636 649 622
672 597 562 680 736 696 794 735 675 641 634 606 631 600 565
611 659 645 620 698 676 659 683 845 726 619 739 705 684 608
877 728 664 691 692 604 659 631 850 663 694 635 607 596 836
737 692 682 632 604 600 608 652 706 701 638 646 602 604 567
639 672 600 613 645 589 742 592 569 703 671 649 646 679 874
639 631 661 571 693 720 776 699 627 636 671 612 868 646 624
511 880 652 652 822 857 864 682 1200 780 721 850 684 598 863
613 682 730 627 622 696 739 574 656 704 690 608 700 725 868
684 841 740 792 683 649 609 730 719 680 502 567 610 682 690
633 892 920 652 588 738 730 675 868 838 640 679
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
System : 2 - Internal
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
107 - 115 8
120
100 - 107 13
100
92 - 100 8
80 DFT
84 - 92 23
DFT
60 76 - 84 24
40 69 - 76 12
61 - 69 9
20
53 - 61 3
0
Measurements 0 10 20 30
Num ber of Measurem ents
Number 112
Mean 89
Min 53
Max 123
St dev 17
121 79 79 88 81 74 76 77 88 84 87 62 88 82 82
74 86 74 83 98 106 88 104 98 120 86 86 123 120 101
109 91 108 89 89 101 101 98 90 91 84 104 83 110 81
107 107 121 67 109 76 67 93 89 78 82 76 83 85 82
112 119 120 104 119 99 99 85 112 77 78 79 81 89 85
77 123 106 79 74 62 64 118 92 118 112 110 83 87 100
80 105 61 88 100 73 61 84 75 74 73 65 75 53 62
98 85 54 86 54 86 121
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
452 - 487 17
500
416 - 452 5
400
380 - 416 9
DFT
DFT
300
344 - 380 20
237 - 273 4
0
Measurements 0 10 20 30 40 50
Num ber of Measurem ents
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Number 137
Mean 350
Min 237
Max 559
St dev 68
330 331 456 472 328 333 329 455 344 558 487 291 305 308 295
306 292 279 331 287 466 377 337 384 375 304 315 291 282 320
311 351 288 350 340 384 468 444 463 445 329 467 376 412 353
295 311 312 328 325 320 441 276 316 446 480 287 375 373 455
454 298 303 272 316 282 315 346 285 353 305 375 336 376 558
277 276 466 473 297 302 377 480 294 333 380 320 305 275 412
379 385 386 376 347 559 292 237 326 349 277 305 273 276 299
328 454 383 315 271 270 317 308 318 409 414 295 297 282 298
328 278 321 322 417 302 334 326 282 347 310 349 338 318 456
464 334
Coating layer - ISO 19840 ISO 19840 as per 80/20 rule Accepted
Final inspection
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
500
587 - 639 33
400
300 534 - 587 41
Number 163
Mean 593
Min 429
Max 902
St dev 80
615 567 647 554 553 661 658 650 634 705 605 596 546 620 632
574 658 496 529 544 540 653 480 529 587 562 521 493 645 511
554 554 698 694 516 586 673 675 573 512 496 550 674 680 684
652 632 536 517 615 654 835 714 571 670 489 637 429 555 490
527 635 714 555 549 712 654 499 507 552 564 618 667 565 534
669 576 516 535 551 512 900 537 609 660 642 642 609 582 596
607 598 554 704 659 606 640 677 631 671 696 610 562 478 561
661 710 701 581 567 699 605 902 674 499 489 494 482 493 509
477 484 517 606 486 653 676 605 556 544 533 503 595 704 835
625 539 521 543 500 501 483 677 639 544 578 499 484 644 531
653 592 620 545 568 597 614 560 605 544 597 622 526
CORROSION PROTECTION
Project number 20220580
Projectname Piles - Jordan Dike Expansion East SP2-3
Spec. client 3210024232 20220614 -
Client ArcelorMittal Projects Europe B.V.
Item : Sluice Gates EE-SP2-3-B30
Climatic Conditions
Inspection equipment
Paint hall Date Time Air temp Relative humidity Dewpoint Steeltemp Delta T
23-1-2023 07:00 18,1 °C 35,1% 2,4 °C 17,8 °C 15,4 °C
23-1-2023 11:10 12 °C 49,8% 1,8 °C 11,4 °C 9,6 °C
23-1-2023 15:00 16 °C 40,9% 2,6 °C 14 °C 11,4 °C
24-1-2023 07:00 14,3 °C 40,3% 0,9 °C 12,1 °C 11,2 °C
24-1-2023 11:10 19,2 °C 31,6% 1,9 °C 20,4 °C 18,5 °C
24-1-2023 15:10 13,1 °C 42,1% 0,4 °C 11,2 °C 10,8 °C
26-1-2023 07:20 16,9 °C 37,5% 2,2 °C 16 °C 13,8 °C
26-1-2023 11:00 17,7 °C 35,6% 2,2 °C 15,6 °C 13,4 °C
26-1-2023 15:10 17,6 °C 44,2% 5,2 °C 15,5 °C 10,3 °C
28-1-2023 07:00 18 °C 29,5% -0,1 °C 17,4 °C 17,5 °C
28-1-2023 11:00 23,4 °C 23,1% 1,1 °C 23,3 °C 22,2 °C
28-1-2023 15:00 °C % °C °C °C
31-1-2023 07:00 18,6 °C 38,8% 4,2 °C 18 °C 13,8 °C
31-1-2023 11:15 23,1 °C 31% 5 °C 22,7 °C 17,7 °C
31-1-2023 15:20 19,6 °C 37,3% 4,6 °C 19,5 °C 14,9 °C
Blast hall Date Time Air temp Relative humidity Dewpoint Steeltemp Delta T
23-1-2023 07:20 17,2 °C 36,7% 2,2 °C 16,4 °C 14,2 °C
23-1-2023 11:30 11,6 °C 50,5% 1,6 °C 10,9 °C 9,3 °C
23-1-2023 15:15 16,5 °C 39,6% 2,6 °C 16,6 °C 14 °C